Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 28826 [2013-11658]
Download as PDF
28826
Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices
Dated: May 9, 2013.
Kimberly D. Bose,
Secretary.
document. For assistance, call toll-free
1–866–208–3372.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11663 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2013–11658 Filed 5–15–13; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[ Project No. 6440–008]
tkelley on DSK3SPTVN1PROD with NOTICES
Lakeport Hydroelectric Associates,
Lakeport Hydroelectric Corporation,
Lakeport Hydroelectric One, LLC;
Notice of Application for Transfer of
License, and Soliciting Comments and
Motions To Intervene
On April 4, 2013, Lakeport
Hydroelectric Associates and Lakeport
Hydroelectric Corporation (transferors)
and Lakeport Hydroelectric One, LLC
(transferee) filed an application for the
transfer of license for the Lakeport
Project, FERC No. 6440, located on the
Winnipesaukee River in Belknap
County, New Hampshire.
Applicants seek Commission approval
to transfer the license for the Lakeport
Project from the transferors to the
transferee.
Applicants’ Contact: Shannon P.
Coleman, Director, Legal Regulatory
Strategy, Algonquin-Liberty Business
Services, 2865 Bristol Circle, Oakville,
ON, Canada L6H 6X5, telephone (905)
465–4462.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–6440) in the
docket number field to access the
VerDate Mar<15>2010
18:13 May 15, 2013
Jkt 229001
Federal Energy Regulatory
Commission
[Project 2629–014]
Village of Morrisville, Vermont; Notice
of Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2629–014.
c. Date Filed: April 25, 2013.
d. Applicant: Village of Morrisville,
Vermont (Morrisville).
e. Name of Project: Morrisville
Hydroelectric Project.
f. Location: On the Green River,
Elmore Pond Brook, and Lamoille River,
in Lamoille County, Vermont. The
project does not occupy any federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Craig Myotte,
Village of Morrisville, Water & Light
Department, P.O. Box 460—857 Elmore
Street, Morrisville, Vermont, 05661–
0460; (802) 888–6521 or
cmyotte@mwlvt.com.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or stephen.kartalia@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Morrisville Hydroelectric
Project consists of four developments
with a total installed capacity of 4,990
kilowatts (kW). The project’s average
annual generation is 9,032,221 kilowatthours. The power generated by the
Morrisville Project is used by
Morrisville to meet the power needs of
its regional retail customers within the
Village of Morrisville and surrounding
communities.
Green River Development
The existing Green River
Development is located on the Green
River and consists of: (1) A 360-foot-
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
long, 105-foot-high concrete arch dam
that includes, near its center, a 60-footlong ungated spillway with a crest
elevation of 1,220 feet above mean sea
level (msl); (2) a 45-foot-long, 15-foothigh concrete gravity weir that creates a
180-foot-long, 11-foot-deep stilling pool
downstream of the concrete arch dam;
(3) a 200-foot-long, 16-foot-high earthen
embankment with 2-foot-high wooden
wave barriers approximately 1.25 miles
southeast of the concrete arch dam; (4)
a 690-acre impoundment with a storage
capacity of 17,400-acre-feet and a
normal maximum elevation of 1,220 feet
msl; (5) a 16-foot-long, 12-foot-high
gated intake structure; (6) a 22-foot-long,
16-foot-wide intake-valve house and a
14-foot-long, 13-foot-wide outlet-valve
house; (7) a 116-foot-long penstock, that
includes a 6-foot-diameter, 94.5-footlong buried, steel section that bifurcates
into two 3-foot-diameter, 21.5-foot-long
steel sections; (8) a 32-foot-long, 37-footwide concrete powerhouse containing
two 945-kW turbine-generator units for
a total installed capacity of 1,890 kW;
(9) a 14.5-foot-long, concrete tailrace;
(10) a 5-mile-long, 34.5-kilovolt (kV)
transmission line connecting the
powerhouse to the regional grid; and
(11) appurtenant facilities.
The Green River Development
bypasses approximately 180 feet of the
Green River, including the stilling pool.
Lake Elmore Development
The existing Lake Elmore
Development is located on Elmore Pond
Brook and consists of: (1) A 26-footlong, 10-foot-high concrete gravity dam
and spillway with a crest elevation of
1,139 feet msl; (2) a 300-acre
impoundment (Lake Elmore) with a
1,000-acre-foot storage capacity and a
normal maximum water surface
elevation of 1,139 feet msl; (3) a 8.5foot-long, 7.5-foot-wide gatehouse; (4) a
8.3-foot-long, 3.5-foot-high gated intake
structure; (5) a 2.5-foot-long concretelined tailrace; and (6) appurtenant
facilities.
Morrisville Development
The existing Morrisville Development
is located on the Lamoille River and
consists of: (1) A 384-foot-long, 37-foothigh concrete gravity dam comprised of
a 138-foot-long concrete retaining wall,
a 30-foot-long intake and gatehouse
section, and a 216-foot-long spillway
with two 108-foot-long, 4-foot-high
Obermeyer inflatable crest gates and a
crest elevation of 627.79 feet msl; (2) a
141-foot-long, 8-foot-high concrete wall
approximately 260 feet northwest of the
dam that includes a 60-foot-long
overflow section (back spillway) with 2foot-high wooden flashboards ; (3) a 15-
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 78, Number 95 (Thursday, May 16, 2013)]
[Notices]
[Page 28826]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11658]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 6440-008]
Lakeport Hydroelectric Associates, Lakeport Hydroelectric
Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for
Transfer of License, and Soliciting Comments and Motions To Intervene
On April 4, 2013, Lakeport Hydroelectric Associates and Lakeport
Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One,
LLC (transferee) filed an application for the transfer of license for
the Lakeport Project, FERC No. 6440, located on the Winnipesaukee River
in Belknap County, New Hampshire.
Applicants seek Commission approval to transfer the license for the
Lakeport Project from the transferors to the transferee.
Applicants' Contact: Shannon P. Coleman, Director, Legal Regulatory
Strategy, Algonquin-Liberty Business Services, 2865 Bristol Circle,
Oakville, ON, Canada L6H 6X5, telephone (905) 465-4462.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice by the Commission. Comments and
motions to intervene may be filed electronically via the Internet. See
18 CFR 385.2001(a)(1) and the instructions on the Commission's Web site
under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original plus seven
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. More
information about this project can be viewed or printed on the eLibrary
link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-6440) in the docket number
field to access the document. For assistance, call toll-free 1-866-208-
3372.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11658 Filed 5-15-13; 8:45 am]
BILLING CODE 6717-01-P