Enbridge Pipelines (Illinois) LLC; Notice of Petition for Declaratory Order, 27961-27962 [2013-11280]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 92 / Monday, May 13, 2013 / Notices
Accession Number: 20130503–5136.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–311–001.
Applicants: MP2 Energy IL LLC.
Description: Compliance Filing to be
effective 4/29/2013.
File Date: 5/3/13.
Accession Number: 20130503–5092.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–868–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2013–05–02 Module E–2
Compliance to be effective 4/3/2013.
Filed Date: 5/2/13.
Accession Number: 20130502–5130.
Comments Due: 5 p.m. ET 5/23/13.
Docket Numbers: ER13–1414–000.
Applicants: ITC Midwest LLC.
Description: Filing of CIAC
Agreement of ITC Midwest to be
effective 7/2/2013.
Filed Date: 5/2/13.
Accession Number: 20130502–5083.
Comments Due: 5 p.m. ET 5/23/13.
Docket Numbers: ER13–1415–000.
Applicants: El Paso Electric Company.
Description: Concurrence of EPE to
APS Service Agreement No. 193,
Amendment 2 to be effective 2/28/2013.
Filed Date: 5/2/13.
Accession Number: 20130502–5135.
Comments Due: 5 p.m. ET 5/23/13.
Docket Numbers: ER13–1416–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2013–05–03 SA 2519
NIPSCO-Duke IA to be effective 4/5/
2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5013.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1417–000.
Applicants: Niagara Mohawk Power
Corporation.
Description: Notice of Cancellation of
Engineering, Permitting and
Construction Services Agreement with
Luther Forest Technology Campus
Economic Development Corporation of
Niagara Mohawk Power Corporation
ER13–1417.
Filed Date: 5/2/13.
Accession Number: 20130502–5149.
Comments Due: 5 p.m. ET 5/23/13.
Docket Numbers: ER13–1418–000.
Applicants: Niagara Mohawk Power
Corporation.
Description: Notice of Cancellation of
Agreement for Substation Services with
Nine Mile Point Nuclear Station LLC of
Niagara Mohawk Power Corporation.
Filed Date: 5/2/13.
Accession Number: 20130502–5150.
Comments Due: 5 p.m. ET 5/23/13.
Docket Numbers: ER13–1419–000.
Applicants: ExxonMobil Baton Rouge
Complex.
VerDate Mar<15>2010
16:13 May 10, 2013
Jkt 229001
Description: Refile tariff title change
to be effective 5/4/2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5076.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1420–000.
Applicants: MP2 Energy NE LLC.
Description: Compliance Filing to be
effective 5/4/2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5091.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1421–000.
Applicants: Llano Estacado Wind,
LLC.
Description: Updated MBRT 5–3–
2013 to be effective 5/4/2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5096.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1422–000.
Applicants: Ebensburg Power
Company.
Description: Ebensburg Power
Company submits tariff filing per 35.12:
Initial Tariff Baseline to be effective
5/12/2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5135.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1423–000.
Applicants: Massachusetts Electric
Company.
Description: Massachusetts Electric
Company submits tariff filing per
35.13(a)(2)(iii: Interconnection
Agreement Between Massachusetts Elec
Co. and Energy Thorndike to be
effective 7/3/2013.
Filed Date: 5/3/13.
Accession Number: 20130503–5138.
Comments Due: 5 p.m. ET 5/24/13.
Docket Numbers: ER13–1424–000.
Applicants: New York Independent
System Operator, Inc., PJM
Interconnection, L.L.C.
Description: Joint Waiver Request to
Change Scheduled Interchange
Expected on Ramapo PAR of New York
Independent System Operator, Inc. and
PJM Interconnection, L.L.C.
Filed Date: 5/3/13.
Accession Number: 20130503–5162.
Comments Due: 5 p.m. ET 5/10/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
27961
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 6, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11279 Filed 5–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5991–003]
Gordon Foster and Seneca Falls
School, Deep Creek Energy LLC;
Notice of Transfer of Exemption
1. By letter filed March 20, 2013, Mr.
Brian Gogarty, Deep Creek Energy LLC
informed the Commission that the
exemption from licensing for the Deep
Creek Project, FERC No. 5991, originally
issued October 1, 1982,1 has been
transferred to Deep Creek Energy LLC.
The project is located on Deep Creek in
Stevens County, Washington. The
transfer of an exemption does not
require Commission approval.
2. Mr. Brian Gogarty, Deep Creek
Energy LLC, located at 806 B Gillette
Road, Colville, WA 99114 is now the
exemptee of the Deep Creek Project,
FERC No. 5991.
Dated: May 6, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11281 Filed 5–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR13–19–000]
Enbridge Pipelines (Illinois) LLC;
Notice of Petition for Declaratory Order
Take notice that on May 2, 2013,
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2012),
Enbridge Pipelines (Illinois) LLC filed a
petition seeking a declaratory order
approving priority service, rate
structure, and lottery apportionment
1 21 FERC ¶ 62,002, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 MW or Less.
E:\FR\FM\13MYN1.SGM
13MYN1
27962
Federal Register / Vol. 78, No. 92 / Monday, May 13, 2013 / Notices
provisions for the proposed Southern
Access Extension Project. Enbridge
Illinois states that the Project is a 165
mile pipeline designed to transport both
light and heavy crude petroleum from
Flanagan, Illinois to the pipeline hub at
Patoka, Illinois, and asks that the
Commission act expeditiously on the
Petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on June 3, 2013.
Dated: May 7, 2013.
Kimberly D. Bose,
Secretary.
tkelley on DSK3SPTVN1PROD with NOTICES
[FR Doc. 2013–11280 Filed 5–10–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:13 May 10, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14496–000]
Archon Energy 1, Inc. Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 11, 2013, the Archon
Energy 1, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Upper Alamo River Hydroelectric
Project (Upper Alamo River
Hydroelectric Project or project) to be
located on the Alamo River, near the
cities of Calipatria, Brawley, and
Holtville in Imperial County, California.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
six river drop developments. Each of the
proposed in-stream installations would
consist of the following: (1) a VLH 4000
turbo-generator; (2) a 10-by-10-foot
electrical shack; and (3) appurtenant
facilities. The proposed project would
have a total installed capacity of 3
megawatts and generate an estimated
average annual energy production of 21
gigawatt-hours.
Applicant Contact: Mr. Paul Grist,
Archon Energy 1, Inc., 101 E. Kennedy
Blvd., Suite 2800, Tampa, Florida
33602, phone: (403) 618–2018.
FERC Contact: Corey Vezina; phone:
(202) 502–8598, email:
Corey.vezina@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14496) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 6, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11276 Filed 5–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14494–000]
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 11, 2013, the Archon
Energy 1, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Lower Alamo & New Rivers
Hydroelectric Project (Lower Alamo &
New Rivers Hydroelectric Project or
project) to be located on the Alamo
River and New River, near the cities of
Calipatria and Brawley, Imperial
County, California. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
four river drop developments:
• The Alamo River Drop 2, New River
Drop 2, and New River Drop 3
developments would consist of the
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 78, Number 92 (Monday, May 13, 2013)]
[Notices]
[Pages 27961-27962]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11280]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR13-19-000]
Enbridge Pipelines (Illinois) LLC; Notice of Petition for
Declaratory Order
Take notice that on May 2, 2013, pursuant to Rule 207(a)(2) of the
Commission's Rules of Practices and Procedure, 18 CFR
385.207(a)(2)(2012), Enbridge Pipelines (Illinois) LLC filed a petition
seeking a declaratory order approving priority service, rate structure,
and lottery apportionment
[[Page 27962]]
provisions for the proposed Southern Access Extension Project. Enbridge
Illinois states that the Project is a 165 mile pipeline designed to
transport both light and heavy crude petroleum from Flanagan, Illinois
to the pipeline hub at Patoka, Illinois, and asks that the Commission
act expeditiously on the Petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on June 3, 2013.
Dated: May 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11280 Filed 5-10-13; 8:45 am]
BILLING CODE 6717-01-P