Archon Energy 1, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 27962 [2013-11276]

Download as PDF 27962 Federal Register / Vol. 78, No. 92 / Monday, May 13, 2013 / Notices provisions for the proposed Southern Access Extension Project. Enbridge Illinois states that the Project is a 165 mile pipeline designed to transport both light and heavy crude petroleum from Flanagan, Illinois to the pipeline hub at Patoka, Illinois, and asks that the Commission act expeditiously on the Petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on June 3, 2013. Dated: May 7, 2013. Kimberly D. Bose, Secretary. tkelley on DSK3SPTVN1PROD with NOTICES [FR Doc. 2013–11280 Filed 5–10–13; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:13 May 10, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14496–000] Archon Energy 1, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 11, 2013, the Archon Energy 1, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Upper Alamo River Hydroelectric Project (Upper Alamo River Hydroelectric Project or project) to be located on the Alamo River, near the cities of Calipatria, Brawley, and Holtville in Imperial County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of six river drop developments. Each of the proposed in-stream installations would consist of the following: (1) a VLH 4000 turbo-generator; (2) a 10-by-10-foot electrical shack; and (3) appurtenant facilities. The proposed project would have a total installed capacity of 3 megawatts and generate an estimated average annual energy production of 21 gigawatt-hours. Applicant Contact: Mr. Paul Grist, Archon Energy 1, Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602, phone: (403) 618–2018. FERC Contact: Corey Vezina; phone: (202) 502–8598, email: Corey.vezina@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 Days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14496) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 6, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–11276 Filed 5–10–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14494–000] Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 11, 2013, the Archon Energy 1, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Lower Alamo & New Rivers Hydroelectric Project (Lower Alamo & New Rivers Hydroelectric Project or project) to be located on the Alamo River and New River, near the cities of Calipatria and Brawley, Imperial County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of four river drop developments: • The Alamo River Drop 2, New River Drop 2, and New River Drop 3 developments would consist of the E:\FR\FM\13MYN1.SGM 13MYN1

Agencies

[Federal Register Volume 78, Number 92 (Monday, May 13, 2013)]
[Notices]
[Page 27962]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11276]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14496-000]


 Archon Energy 1, Inc. Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On February 11, 2013, the Archon Energy 1, Inc., filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Upper Alamo River Hydroelectric Project (Upper Alamo River 
Hydroelectric Project or project) to be located on the Alamo River, 
near the cities of Calipatria, Brawley, and Holtville in Imperial 
County, California. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of six river drop developments. 
Each of the proposed in-stream installations would consist of the 
following: (1) a VLH 4000 turbo-generator; (2) a 10-by-10-foot 
electrical shack; and (3) appurtenant facilities. The proposed project 
would have a total installed capacity of 3 megawatts and generate an 
estimated average annual energy production of 21 gigawatt-hours.
    Applicant Contact: Mr. Paul Grist, Archon Energy 1, Inc., 101 E. 
Kennedy Blvd., Suite 2800, Tampa, Florida 33602, phone: (403) 618-2018.
    FERC Contact: Corey Vezina; phone: (202) 502-8598, email: 
Corey.vezina@ferc.gov.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 Days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14496) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 6, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-11276 Filed 5-10-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.