In the Matter of South Mississippi Electric Power Association, System Energy Resources, Inc., Grand Gulf Nuclear Station, Units No. 1; Order Approving Direct and Indirect Transfers of License and Approving Conforming Amendment, 28002-28003 [2013-11263]
Download as PDF
28002
Federal Register / Vol. 78, No. 92 / Monday, May 13, 2013 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
of Entergy (e.g., EGS–LA) own the
respective transmission assets.
Following the proposed transactions,
each of the Entergy subsidiaries will
become a new limited liability company
with the same assets except that the
transmission assets will be owned by
ITC Holdings Corp. and operated by
Midwest Independent Transmission
System Operator, Inc.
No physical changes to the facilities
or operational changes are being
proposed in the application. The
interconnections that provide offsite
power to RBS do not change as a result
of the proposed direct and indirect
license transfers.
Approval of the direct and indirect
transfers of the facility operating license
was requested by EOI, acting on behalf
of EGS–LA, as well as their parent
companies and itself. A notice entitled,
‘‘Consideration of Approval of
Application Regarding Proposed
Creation of a Holding Company and
Transfer of Facility Operating License
and Opportunity for a Hearing,’’ was
published in the Federal Register on
January 3, 2013 (78 FR 320). No
comments or hearing requests were
received.
Under 10 CFR 50.80, no license, or
any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the NRC shall give its
consent in writing. Upon review of the
information in the licensees’
application, and other information
before the Commission, the NRC staff
has determined that the proposed
indirect license transfer of control of the
subject license held by the licensees to
the extent such will result from the
proposed formation of the intermediary
holding company in conjunction with
the planned direct transfer of EGS–LA
to New EGS–LA to the extent affected in
order to support transfer of the Entergy
transmission assets as described in the
application, is otherwise consistent with
the applicable provisions of law,
regulations, and orders issued by the
NRC, pursuant thereto, subject to the
conditions set forth below. The findings
set forth above are supported by a safety
evaluation dated the same day as this
Order.
III
Accordingly, pursuant to Sections
161b, 161i, 161o, and 184 of the Atomic
Energy Act of 1954, as amended, 42
U.S.C. 2201(b), 2201(i), 2201(o), and
2234; and 10 CFR 50.80, It is hereby
ordered that the application regarding
the indirect and direct license transfers
related to the proposed corporate
restructuring in connection with the
VerDate Mar<15>2010
16:13 May 10, 2013
Jkt 229001
separation of the Entergy transmission
system is approved, subject to the
following conditions:
1. Before completion of the proposed
transaction, EOI shall provide the
Director of the Office of Nuclear Reactor
Regulation satisfactory documentary
evidence that New EGS–LA has
obtained the appropriate amount of
insurance required of the licensees
under 10 CFR part 140 of the
Commission’s regulations.
It is further ordered that after receipt
of all required regulatory approvals of
the proposed direct transfer action, EOI
shall inform the Director of the Office of
Nuclear Reactor Regulation in writing of
such receipt, and of the date of closing,
no later than 1 business day before the
closing of the direct transfer. Should the
proposed direct transfer not be
completed within 1 year of this Order’s
date of issuance, this Order shall
become null and void, provided,
however, upon written application and
good cause shown, such date may be
extended by Order.
This Order is effective upon issuance.
For further details with respect to this
Order, see the initial application dated
September 27, 2012 (Agencywide
Documents Access and Management
System (ADAMS) Accession No.
ML12275A013), as supplemented by
letters dated January 29 and April 16,
2013 (ADAMS Accession Nos.
ML13030A204 and ML13107A010,
respectively), and the safety evaluation
dated the same date as this Order
(ADAMS Accession No. ML13077A237),
which are available for public
inspection at the Commission’s Public
Document Room (PDR), located at One
White Flint North, Public File Area 01
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly
available documents created or received
at the NRC are accessible electronically
through ADAMS in the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR reference staff by telephone at
1–800–397–4209, or 301–415–4737, or
by email to PDR.Resource@nrc.gov.
Dated at Rockville, Maryland, this 3rd day
of May 2013.
For the Nuclear Regulatory Commission.
Eric J. Leeds,
Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2013–11262 Filed 5–10–13; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0319; Docket No. 50–416;
License No. NPF–29]
In the Matter of South Mississippi
Electric Power Association, System
Energy Resources, Inc., Grand Gulf
Nuclear Station, Units No. 1; Order
Approving Direct and Indirect
Transfers of License and Approving
Conforming Amendment
I
South Mississippi Electric Power
Association, System Energy Resources,
Inc. (SERI), Entergy Mississippi, Inc.
(EMI), and Entergy Operations, Inc.
(EOI) (the licensees), are co-holders of
Facility Operating License No. NPF–29.
South Mississippi Electric Power
Association and SERI are the owners
and EOI is authorized to possess, use,
and operate Grand Gulf Nuclear Station,
Unit No. 1 (GGNS). The EMI has antitrust responsibilities imposed in the
license. The GGNS is located in
Claiborne County, Mississippi.
II
By application dated September 27,
2012, as supplemented by letters dated
January 29 and April 16, 2013, EOI
requested on behalf of itself, SERI, and
their parent companies (together, the
applicants), pursuant to § 50.80 of Title
10 of the Code of Federal Regulations
(10 CFR), that the U.S. Nuclear
Regulatory Commission (NRC) consent
to certain license transfers to permit the
direct transfer of GGNS, and associated
Independent Spent Fuel Storage
Installation, to a new limited liability
company, System Energy Resource, LLC
(SERL). The applicants also requested
approval of a conforming license
amendment that would replace
references to SERI in the license with
references to SERL to reflect the transfer
of ownership. The EMI has anti-trust
responsibilities in the license and the
application requested references to EMI
in the license be replaced with the new
limited liability company, Entergy
Mississippi, LLC (EML). In addition, the
applicants requested the NRC’s consent
to approve associated indirect license
transfers to the extent such would be
affected by the formation of a new
intermediary holding company. Entergy
Corporation (Entergy) will remain as the
ultimate parent company, but a new
intermediate company, Entergy Utilities
Holdings, LLC, a Delaware limited
liability company, will be created,
which will be the direct parent
company of SERL, EML, and EOI.
Ultimately, SERL and South Mississippi
E:\FR\FM\13MYN1.SGM
13MYN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 92 / Monday, May 13, 2013 / Notices
Electric Power Association will acquire
ownership of the facility and EOI will
remain responsible for the operation
and maintenance of GGNS. The license
transfers are necessary to support a
proposed separation of the Entergy
transmission system in Arkansas,
Louisiana, Mississippi, Missouri, and
Texas. Currently, the utility operating
company subsidiaries of Entergy (e.g.
EMI) own the transmission assets.
Following the proposed transactions,
each of the Entergy subsidiaries will
become a new limited liability company
with the same assets except that the
transmission assets will be owned by
ITC Holdings Corp. and operated by
Midwest Independent Transmission
System Operator, Inc.
No physical changes to the facilities
or operational changes are being
proposed in the application. The
interconnections that provide offsite
power to GGNS do not change as a
result of the proposed direct and
indirect license transfers.
Approval of the direct and indirect
transfers of the facility operating license
was requested by EOI, acting on behalf
of SERI, as well as their parent
companies and itself. A notice entitled,
‘‘Consideration of Approval of
Application Regarding Proposed
Creation of a Holding Company and
Transfer of Facility Operating License
and Conforming Amendment and
Opportunity for a Hearing,’’ was
published in the Federal Register on
January 3, 2013 (78 FR 325). No
comments or hearing requests were
received.
Under 10 CFR 50.80, no license, or
any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the NRC shall give its
consent in writing. Upon review of the
information in the licensees’
application, and other information
before the Commission, the NRC staff
has determined that the proposed
indirect license transfer of control of the
subject license held by the licensees to
the extent such will result from the
proposed formation of the intermediary
holding company in conjunction with
the planned direct transfer of SERI to
SERL, and EMI to EML, to the extent
affected in order to support transfer of
the Entergy transmission assets as
described in the application, is
otherwise consistent with the applicable
provisions of law, regulations, and
orders issued by the NRC, pursuant
thereto, subject to the conditions set
forth below. The NRC staff has further
found that the application for the
proposed license amendment complies
with the standards and requirements of
VerDate Mar<15>2010
16:13 May 10, 2013
Jkt 229001
the Atomic Energy Act of 1954, as
amended (the Act), and the
Commission’s rules and regulations set
forth in 10 CFR Chapter I; the facilities
will operate in conformity with the
application, the provisions of the Act
and the rules and regulations of the
Commission; there is reasonable
assurance that the activities authorized
by the proposed license amendment can
be conducted without endangering the
health and safety of the public and that
such activities will be conducted in
compliance with the Commission’s
regulations; the issuance of the
proposed license amendment will not
be inimical to the common defense and
security or to the health and safety of
the public; and the issuance of the
proposed amendment will be in
accordance with 10 CFR Part 51 of the
Commission’s regulations and all
applicable requirements have been
satisfied. The findings set forth above
are supported by a safety evaluation
dated the same day as this Order.
III
Accordingly, pursuant to Sections
161b, 161i, 161o, and 184 of the Atomic
Energy Act of 1954, as amended, 42
U.S.C. 2201(b), 2201(i), 2201(o), and
2234; and 10 CFR 50.80, it is hereby
ordered that the application regarding
the indirect and direct license transfers
related to the proposed corporate
restructuring in connection with the
separation of the Entergy transmission
systems is approved, subject to the
following conditions:
1. Before completion of the proposed
transaction, EOI shall provide the
Director of the Office of Nuclear Reactor
Regulation satisfactory documentary
evidence that SERL has obtained the
appropriate amount of insurance
required of the licensees under 10 CFR
part 140 of the Commission’s
regulations.
It is further ordered that consistent
with 10 CFR 2.1315(b), the license
amendment that makes a change, as
indicated in Enclosure 5 to the cover
letter forwarding this Order
(Agencywide Documents Access and
Management System (ADAMS)
Accession No. ML13077A237), to reflect
the subject direct transfer, is approved.
The amendment shall be issued and
made effective at the time the proposed
direct transfer action is completed.
It is further ordered that after receipt
of all required regulatory approvals of
the proposed direct transfer action, EOI
shall inform the Director of the Office of
Nuclear Reactor Regulation in writing of
such receipt, and of the date of closing,
no later than 1 business day before the
closing of the direct transfer. Should the
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
28003
proposed direct transfer not be
completed within 1 year of this Order’s
date of issuance, this Order shall
become null and void, provided,
however, upon written application and
good cause shown, such date may be
extended by Order.
This Order is effective upon issuance.
For further details with respect to this
Order, see the initial application dated
September 27, 2012 (ADAMS Accession
No. ML12275A013), as supplemented
by letters dated January 29 and April 16,
2013 (ADAMS Accession Nos.
ML13030A204 and ML13107A010,
respectively), and the safety evaluation
dated the same date as this Order
(ADAMS Accession No. ML13077A237),
which are available for public
inspection at the Commission’s Public
Document Room (PDR), located at One
White Flint North, Public File Area 01
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly
available documents created or received
at the NRC are accessible electronically
through ADAMS in the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR reference staff by telephone at
1–800–397–4209, or 301–415–4737, or
by email to PDR.Resource@nrc.gov.
Dated at Rockville, Maryland, this 3rd day
of May 2013.
For the Nuclear Regulatory Commission.
Eric J. Leeds,
Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2013–11263 Filed 5–10–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0320; Docket Nos. 50–313 and
50–368; License Nos. DPR–51 and NPF–6]
In the Matter of Entergy Arkansas and
Entergy Operations, Arkansas Nuclear
One, Units 1 and 2; Order Approving
Direct and Indirect Transfers of
Licenses and Approving Conforming
Amendments
I
Entergy Arkansas, Inc. (EAI), and
Entergy Operations, Inc. (EOI) (the
licensees), are co-holders of Renewed
Facility Operating License Nos. DPR–51
and NPF–6. The EAI is the owner and
EOI is authorized to possess, use, and
operate Arkansas Nuclear One, Units. 1
and 2 (ANO–1 and ANO–2); located in
Pope County, Arkansas.
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 78, Number 92 (Monday, May 13, 2013)]
[Notices]
[Pages 28002-28003]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11263]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2012-0319; Docket No. 50-416; License No. NPF-29]
In the Matter of South Mississippi Electric Power Association,
System Energy Resources, Inc., Grand Gulf Nuclear Station, Units No. 1;
Order Approving Direct and Indirect Transfers of License and Approving
Conforming Amendment
I
South Mississippi Electric Power Association, System Energy
Resources, Inc. (SERI), Entergy Mississippi, Inc. (EMI), and Entergy
Operations, Inc. (EOI) (the licensees), are co-holders of Facility
Operating License No. NPF-29. South Mississippi Electric Power
Association and SERI are the owners and EOI is authorized to possess,
use, and operate Grand Gulf Nuclear Station, Unit No. 1 (GGNS). The EMI
has anti-trust responsibilities imposed in the license. The GGNS is
located in Claiborne County, Mississippi.
II
By application dated September 27, 2012, as supplemented by letters
dated January 29 and April 16, 2013, EOI requested on behalf of itself,
SERI, and their parent companies (together, the applicants), pursuant
to Sec. 50.80 of Title 10 of the Code of Federal Regulations (10 CFR),
that the U.S. Nuclear Regulatory Commission (NRC) consent to certain
license transfers to permit the direct transfer of GGNS, and associated
Independent Spent Fuel Storage Installation, to a new limited liability
company, System Energy Resource, LLC (SERL). The applicants also
requested approval of a conforming license amendment that would replace
references to SERI in the license with references to SERL to reflect
the transfer of ownership. The EMI has anti-trust responsibilities in
the license and the application requested references to EMI in the
license be replaced with the new limited liability company, Entergy
Mississippi, LLC (EML). In addition, the applicants requested the NRC's
consent to approve associated indirect license transfers to the extent
such would be affected by the formation of a new intermediary holding
company. Entergy Corporation (Entergy) will remain as the ultimate
parent company, but a new intermediate company, Entergy Utilities
Holdings, LLC, a Delaware limited liability company, will be created,
which will be the direct parent company of SERL, EML, and EOI.
Ultimately, SERL and South Mississippi
[[Page 28003]]
Electric Power Association will acquire ownership of the facility and
EOI will remain responsible for the operation and maintenance of GGNS.
The license transfers are necessary to support a proposed separation of
the Entergy transmission system in Arkansas, Louisiana, Mississippi,
Missouri, and Texas. Currently, the utility operating company
subsidiaries of Entergy (e.g. EMI) own the transmission assets.
Following the proposed transactions, each of the Entergy subsidiaries
will become a new limited liability company with the same assets except
that the transmission assets will be owned by ITC Holdings Corp. and
operated by Midwest Independent Transmission System Operator, Inc.
No physical changes to the facilities or operational changes are
being proposed in the application. The interconnections that provide
offsite power to GGNS do not change as a result of the proposed direct
and indirect license transfers.
Approval of the direct and indirect transfers of the facility
operating license was requested by EOI, acting on behalf of SERI, as
well as their parent companies and itself. A notice entitled,
``Consideration of Approval of Application Regarding Proposed Creation
of a Holding Company and Transfer of Facility Operating License and
Conforming Amendment and Opportunity for a Hearing,'' was published in
the Federal Register on January 3, 2013 (78 FR 325). No comments or
hearing requests were received.
Under 10 CFR 50.80, no license, or any right thereunder, shall be
transferred, directly or indirectly, through transfer of control of the
license, unless the NRC shall give its consent in writing. Upon review
of the information in the licensees' application, and other information
before the Commission, the NRC staff has determined that the proposed
indirect license transfer of control of the subject license held by the
licensees to the extent such will result from the proposed formation of
the intermediary holding company in conjunction with the planned direct
transfer of SERI to SERL, and EMI to EML, to the extent affected in
order to support transfer of the Entergy transmission assets as
described in the application, is otherwise consistent with the
applicable provisions of law, regulations, and orders issued by the
NRC, pursuant thereto, subject to the conditions set forth below. The
NRC staff has further found that the application for the proposed
license amendment complies with the standards and requirements of the
Atomic Energy Act of 1954, as amended (the Act), and the Commission's
rules and regulations set forth in 10 CFR Chapter I; the facilities
will operate in conformity with the application, the provisions of the
Act and the rules and regulations of the Commission; there is
reasonable assurance that the activities authorized by the proposed
license amendment can be conducted without endangering the health and
safety of the public and that such activities will be conducted in
compliance with the Commission's regulations; the issuance of the
proposed license amendment will not be inimical to the common defense
and security or to the health and safety of the public; and the
issuance of the proposed amendment will be in accordance with 10 CFR
Part 51 of the Commission's regulations and all applicable requirements
have been satisfied. The findings set forth above are supported by a
safety evaluation dated the same day as this Order.
III
Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the
Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i),
2201(o), and 2234; and 10 CFR 50.80, it is hereby ordered that the
application regarding the indirect and direct license transfers related
to the proposed corporate restructuring in connection with the
separation of the Entergy transmission systems is approved, subject to
the following conditions:
1. Before completion of the proposed transaction, EOI shall provide
the Director of the Office of Nuclear Reactor Regulation satisfactory
documentary evidence that SERL has obtained the appropriate amount of
insurance required of the licensees under 10 CFR part 140 of the
Commission's regulations.
It is further ordered that consistent with 10 CFR 2.1315(b), the
license amendment that makes a change, as indicated in Enclosure 5 to
the cover letter forwarding this Order (Agencywide Documents Access and
Management System (ADAMS) Accession No. ML13077A237), to reflect the
subject direct transfer, is approved. The amendment shall be issued and
made effective at the time the proposed direct transfer action is
completed.
It is further ordered that after receipt of all required regulatory
approvals of the proposed direct transfer action, EOI shall inform the
Director of the Office of Nuclear Reactor Regulation in writing of such
receipt, and of the date of closing, no later than 1 business day
before the closing of the direct transfer. Should the proposed direct
transfer not be completed within 1 year of this Order's date of
issuance, this Order shall become null and void, provided, however,
upon written application and good cause shown, such date may be
extended by Order.
This Order is effective upon issuance.
For further details with respect to this Order, see the initial
application dated September 27, 2012 (ADAMS Accession No. ML12275A013),
as supplemented by letters dated January 29 and April 16, 2013 (ADAMS
Accession Nos. ML13030A204 and ML13107A010, respectively), and the
safety evaluation dated the same date as this Order (ADAMS Accession
No. ML13077A237), which are available for public inspection at the
Commission's Public Document Room (PDR), located at One White Flint
North, Public File Area 01 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly available documents created or
received at the NRC are accessible electronically through ADAMS in the
NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do
not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS, should contact the NRC PDR reference staff
by telephone at 1-800-397-4209, or 301-415-4737, or by email to
PDR.Resource@nrc.gov.
Dated at Rockville, Maryland, this 3rd day of May 2013.
For the Nuclear Regulatory Commission.
Eric J. Leeds,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2013-11263 Filed 5-10-13; 8:45 am]