PPL Holtwood, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 27216 [2013-11046]
Download as PDF
27216
Federal Register / Vol. 78, No. 90 / Thursday, May 9, 2013 / Notices
Milestone
Target Date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Draft EA ...................................................................................................................................................
Comments on Draft EA ...........................................................................................................................................................
Modified Terms and Conditions ...............................................................................................................................................
Commission Issues Final EA or EIS .......................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11047 Filed 5–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 487–104]
mstockstill on DSK4VPTVN1PROD with NOTICES
PPL Holtwood, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 487–104.
c. Date Filed: April 2, 2013.
d. Applicant: PPL Holtwood, LLC.
e. Name of Project: Wallenpaupack
Hydroelectric Project.
f. Location: Wallenpaupack Creek and
the Lackawaxen River in Pike and
Wayne Counties, borough of Hawley,
Pennsylvania.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Heather L.
Hopkins, Lake Wallenpaupack Policy
Supervisor, PPL Holtwood, LLC, 126
PPL Drive, P.O. Box 122, Hawley, PA
18428–0122 (570) 253–7077.
i. FERC Contact: Mary Karwoski,
(202) 502–6543, or email:
mary.karwoski@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: June
3, 2013.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
VerDate Mar<15>2010
17:18 May 08, 2013
Jkt 229001
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–487–104) on any
comments or motions filed.
k. Description of Application: PPL
Holtwood, LLC requests Commission
approval to grant Woodlyn Shores
Association, Inc. a permit to use project
lands and waters for the expansion of an
existing boat dock by adding capacity
for 10 watercraft (wave-runner type).
The proposed expansion will utilize
existing dock space and add a six foot
section to the shore side of the dock,
extending the overall dock to its
previously licensed length of 225 feet.
To accommodate the additional length,
the existing 12-foot shore side ramp will
be replaced with a 20-foot ramp. The
ladder on the existing swim dock
immediately to the north will be
relocated to the opposite side and a
safety fence and signage will be
installed on the swim dock to move
swimmers away from the boat dock.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–487) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
PO 00000
Frm 00039
Fmt 4703
Sfmt 9990
July 1, 2013.
August 28, 2013.
February 24, 2014.
March 26, 2014.
April 25, 2014.
July 24, 2014.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervener must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11046 Filed 5–8–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 78, Number 90 (Thursday, May 9, 2013)]
[Notices]
[Page 27216]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11046]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 487-104]
PPL Holtwood, LLC; Notice of Application Accepted for Filing,
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No: 487-104.
c. Date Filed: April 2, 2013.
d. Applicant: PPL Holtwood, LLC.
e. Name of Project: Wallenpaupack Hydroelectric Project.
f. Location: Wallenpaupack Creek and the Lackawaxen River in Pike
and Wayne Counties, borough of Hawley, Pennsylvania.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Heather L. Hopkins, Lake Wallenpaupack Policy
Supervisor, PPL Holtwood, LLC, 126 PPL Drive, P.O. Box 122, Hawley, PA
18428-0122 (570) 253-7077.
i. FERC Contact: Mary Karwoski, (202) 502-6543, or email:
mary.karwoski@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: June 3, 2013.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-487-104) on any comments or motions filed.
k. Description of Application: PPL Holtwood, LLC requests
Commission approval to grant Woodlyn Shores Association, Inc. a permit
to use project lands and waters for the expansion of an existing boat
dock by adding capacity for 10 watercraft (wave-runner type). The
proposed expansion will utilize existing dock space and add a six foot
section to the shore side of the dock, extending the overall dock to
its previously licensed length of 225 feet. To accommodate the
additional length, the existing 12-foot shore side ramp will be
replaced with a 20-foot ramp. The ladder on the existing swim dock
immediately to the north will be relocated to the opposite side and a
safety fence and signage will be installed on the swim dock to move
swimmers away from the boat dock.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-487) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervener must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: May 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11046 Filed 5-8-13; 8:45 am]
BILLING CODE 6717-01-P