Commission Information Collection Activities (FERC Form 580); Comment Request; Revision, 26766-26768 [2013-10946]
Download as PDF
26766
Federal Register / Vol. 78, No. 89 / Wednesday, May 8, 2013 / Notices
from electric utilities and other entities
within the United States. The existing
international transmission facilities to
be utilized by Minnesota Power have
previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments on the Minnesota Power
application to export electric energy to
Canada should be clearly marked with
OE Docket No. EA–196–D. An
additional copy is to be provided
directly to Christopher D. Anderson,
Associate General Counsel, ALLETE,
Inc, 30 West Superior Street, Duluth,
MN 55802. A final decision will be
made on this application after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
a determination is made by DOE that the
proposed action will not have an
adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
mstockstill on DSK4VPTVN1PROD with NOTICES
Issued in Washington, DC, on May 2, 2013.
Jon Worthington,
Deputy Assistant Secretary, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2013–10918 Filed 5–7–13; 8:45 am]
BILLING CODE 6450–01–P
VerDate Mar<15>2010
17:56 May 07, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC13–13–000]
Commission Information Collection
Activities (FERC Form 580); Comment
Request; Revision
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 USC
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the currently approved information
collection, FERC Form No. 580
(Interrogatory on Fuel and Energy
Purchase Practices).
DATES: Comments on the collections of
information are due July 8, 2013.
ADDRESSES: You may submit comments
(identified by Docket No. IC13–13–000)
by either of the following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: Interrogatory on Fuel and
Energy Purchase Practices (FERC Form
No. 580).
OMB Control No.: 1902–0131.
Type of Request: Three-year approval
of the FERC Form No. 580.
Abstract: FERC Form No. 580 is
collected in even numbered years. The
Public Utility Regulatory Policies Act
SUMMARY:
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
(PURPA) 1 amended the Federal Power
Act (FPA) and directed the Commission
to make comprehensive biennial
reviews of certain matters related to
automatic adjustment clauses (AACs) in
wholesale rate schedules used by public
utilities subject to the Commission’s
jurisdiction. Specifically, the
Commission is required to examine
whether the clauses effectively provide
the incentives for efficient use of
resources and whether the clauses
reflect only those costs that are either
‘‘subject to periodic fluctuations’’ or
‘‘not susceptible to precise
determinations’’ in rate cases prior to
the time the costs are incurred.
The Commission is also required to
review the practices of each public
utility under AACs ‘‘to insure efficient
use of resources under such clauses.’’ 2
In response to the PURPA directive, the
Commission (Docket Number IN79–6–
000) established an investigation.
Beginning in 1982, the Commission
collected ‘‘Interrogatory on Fuel and
Energy Purchase Practices’’ data every
other year.
In 2010, the Commission redesigned
the form to collect the information
electronically through use of a standard
form. Based on filer comments in
response to the new electronic form
used in the 2010 and 2012 collections,
FERC recommends the following
changes to the form:
Question 1
—Repair the email field to eliminate
error messages.
Question 2
—Add a column labeled ‘‘Is this AAC a
fuel adjustment clause?’’
—Add a column labeled ‘‘Tariff volume
number containing’’. This information
will aid staff in locating AACs.
—Remove the column and, thus, the
request for information titled:
Æ ‘‘Type/s of AAC’’
Æ ‘‘Type of costs that were passed
through the AAC—if fuel, state fuel
type’’
There has been an increasing number
of AAC-related cost types. This field
makes it difficult for Commission staff
to repopulate the dropdowns for this
column without additional OMB
approval. The information otherwise
gained from respondents supplying the
information collected in these columns
will not be lost. Staff will locate and
1 Enacted
November 8, 1978
review requirement is set forth in two
paragraphs of Section 208 of PURPA, 49 Stat. 851;
16 U.S.C. 824d.
2 The
E:\FR\FM\08MYN1.SGM
08MYN1
Federal Register / Vol. 78, No. 89 / Wednesday, May 8, 2013 / Notices
recover the information from
Commission rate filings by using the
AAC identification information given by
respondents in the first three columns of
Question 2.
26767
—Rename Question 2 columns as
follows to correct typographical
errors:
From
To
Identify service agreement within rate schedule containing AAC ............
Identify service schedule, if any, where the AAC is located within the
rate schedule.
Was rate schedule superseded or abandoned during 2012–2013?
If rate schedule superseded or abandoned during 2012–2013 ...............
Additional changes to Question 2
table:
—Add a check box to enable the utility
to indicate that it had no nontransmission related AACs during the
reporting years, if the situation
applies. This box, when checked,
clearly indicates that there were no
AACs to report.
—Add a ‘‘Copy Row’’ button to facilitate
data entry.
We are further reducing the amount of
information required for AACs that are
not fuel adjustment clauses. Utilities
with no fuel adjustment clauses only
need to respond to questions 1 and 2.
Utilities with a FAC will continue to
complete the entire form.
Question 3
—Reword the question from:
From
To
If during the 2010 and 2011 period, the Utility had any contracts or
agreements for the purchase of either energy or capacity under
which all or any portion of the purchase costs were passed through
the AAC, for each purchase provide the information requested in the
table below. Provide the information separately for each reporting
year 2010 and 2011. Do not report purchased power where none of
the costs were recovered through an AAC.
If during the 2012–2013 period, the Utility had any contracts or agreements for the purchase of either energy or capacity under which all
or any portion of the purchase costs were passed through a fuel adjustment clause (FAC), for each purchase from a PURPA Qualifying
Facility (QF) or Independent Power Producer (IPP) provide the information requested in the non-shaded columns of the table below.
Provide the information separately for each reporting year 2012 and
2013. Do not report purchased power where none of the costs were
recovered through an FAC. For each purchase where costs were
flowed through an FAC, fill-in the non-shaded columns and either
‘‘Only energy charges’’ or ‘‘The total cost of the purchase of economic power’’ columns, whichever apply.
The Commission is only interested in
QF and IPP information here and not
every power purchase contracts/
agreement. The language will be similar
to what was used in Form No. 580
interrogatories prior to 2010.
—Remove the request for information
and thus the columns titled:
Æ Was an after-the-fact comparison
made of actual avoided costs against the
purchase costs?
Æ Were purchases made on an hourly
economic dispatch basis?
From the information provided in the
2010 and 2012 filings the Commission
has found that it can fully evaluate
regulatory compliance without this
information.
Question 6
Change the question as follows:
To
For each fuel supply contract, where costs were subject to 18 CFR
35.14, (including informal agreements with associated companies), in
force at any time during 2012 and/or 2013, of longer than one year
in duration, provide the requested information. Report the data individually, for each contract, for each calendar year. [No response to
any part of Question 6 for fuel oil no. 2 is necessary.] Report all fuels
consumed for electric power generation and thermal energy associated with the production of electricity. Information for only coal, natural gas, and oil should be reported. Information for ALL FUELS e.g.
fossil fuels, wood chips), EXCEPT URANIUM, should be reported.
mstockstill on DSK4VPTVN1PROD with NOTICES
From
For each fuel supply contract, of longer than one year in duration, in
force at any time during 2012 and/or 2013, where costs were subject
to 18 CFR 35.14, (including informal agreements with associated
companies), provide the requested information. Report the data individually for each contract for each calendar year. No response to
any part of Question 6 for fuel oil no. 2 is necessary. Report all fuels
consumed for electric power generation and thermal energy associated with the production of electricity. Information for only coal, natural gas, and oil should be reported.
—As with the request for transportation
information that was eliminated in
2010, the Commission has found
alternative information sources and
analytical approaches sufficient to
eliminate the request for fuels other
than coal, natural gas and oil.
—Add a ‘‘Copy Contract’’ button.
Question 6a
—Add a column labeled ‘‘Is contract
evergreen?’’.
VerDate Mar<15>2010
17:56 May 07, 2013
Jkt 229001
—Add a column labeled ‘‘Pipeline
quality? (Y/N)’’.
Question 6b
—Add a new column to the fuel
quantity section labeled: ‘‘Coal
(x103tons) not delivered by end of
contract year.’’
—Add a column labeled ‘‘Pipeline
quality? (Y/N)’’.
Questions 7 and 8. There are no
proposed changes.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Glossary: Define Evergreen contracts
as follows: Evergreen contract: a
contract that is renewed automatically
or by notice from year to year until
canceled by either party.
Access to the Revised Materials: A
copy of the form, desk reference, and
glossary are attached to this docket, but
they are not included in the Federal
E:\FR\FM\08MYN1.SGM
08MYN1
26768
Federal Register / Vol. 78, No. 89 / Wednesday, May 8, 2013 / Notices
Register.3 Interested parties can see the
form electronically as part of this notice
in FERC’s eLibrary (https://www.ferc.gov/
docs-filing/elibrary.asp) by searching
Docket No. IC13–13–000. Interested
parties may also request paper or
electronic copies of the form and desk
reference by contacting Ellen Brown, by
telephone at (202) 502–8663, by fax at
(202) 273–0873, or by email at
DataClearance@ferc.gov.
Type of Respondents: Large FERCjurisdictional electric public utilities.
Estimate of Annual Burden: 4 The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC FORM NO. 580 (IC13–13–000):
INTERROGATORY ON FUEL AND ENERGY PURCHASE PRACTICES
Number of
respondents
(A)
Number of
responses per
respondent
(B)
Total Number of
responses
(A) × (B) = (C)
Average
burden hours
per response
(D)
Estimated total
annual burden
(C) × (D)
37
10
35
0.5
0.5
0.5
18.5
5
17.5
103
20
2
1,905.5
100
35
Total ..........................................................................
mstockstill on DSK4VPTVN1PROD with NOTICES
Respondents with FACs ..................................................
Respondents with AACs, but no FACs ...........................
Respondents with no AACs nor FACs ............................
........................
........................
..........................
........................
2,040.5
Despite the changes to the Form 580,
burden estimates per response for each
entity will not change from previously
approved amounts. The burden estimate
may vary by utility depending on
whether the utility has or does not have
an automatic adjustment clause and
depending on whether or not those
utilities with adjustment clauses allow
automatic adjustment of fuel cost.
The total estimated annual cost
burden to respondents is $142,835.
[2040.5 hours * $70/hour 5 = $142,835]
The estimated annual cost of filing the
FERC Form 580 per response is $1,742.
[$142,835 ÷ 82 responses = $1,742/
response]
Comments: The Commission seeks
public comment on and subsequent
OMB approval of the proposed revised
information collection. Also, the
Commission invites comments on: (1)
Whether the collection of information is
necessary for the proper performance of
the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden and
cost of the collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information collection; and
(4) ways to minimize the burden of the
collection of information on those who
are to respond, including the use of
automated collection techniques or
other forms of information technology.
Dated: May 2, 2013.
Kimberly D. Bose,
Secretary.
3 The attached form is for illustrative purposes
only and does not include all the interactive
features of the actual form. For a copy of the actual
form, please contact Ellen Brown as indicated in
this notice.
4 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
VerDate Mar<15>2010
17:56 May 07, 2013
Jkt 229001
DEPARTMENT OF ENERGY
[FR Doc. 2013–10946 Filed 5–7–13; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 2520–072]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–1252–000]
California Power Exchange
Corporation; Notice Setting Deadline
To File Reply Comments
On April 29, 2013, the California
Power Exchange Corporation filed a
motion requesting the Commission to
set the date by which it may file reply
comments in the above-referenced
proceeding. Notice is hereby given that
the deadline for submitting such reply
comments is set as May 10, 2013.
Dated: May 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10950 Filed 5–7–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00022
Fmt 4703
Federal Energy Regulatory
Commission
Sfmt 4703
Great Lakes Hydro America, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document (PAD), Commencement of
Pre-Filing Process, and Scoping;
Request for Comments on the Pad and
Scoping Document, and Identification
of Issues and Associated Study
Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2520–072.
c. Dated Filed: March 1, 2013.
d. Submitted By: Great Lakes Hydro
America, LLC.
e. Name of Project: Mattaceunk
Hydroelectric Project.
f. Location: On the Penobscot River in
Aroostook and Penobscot counties,
Maine, within the towns of Medway,
Woodville, Mattawamkeag, and the
unorganized township of Molunkus. No
federal lands are located within the
project boundary.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Kevin
Bernier, Manager, Licensing &
Compliance, Brookfield Renewable
Energy Group, New England Regional
Operations Center, 1024 Central Street,
Millinocket, Maine 04462.
explanation of what is included in the information
collection burden, reference 5 CFR 1320.3.
5 FY2013 Estimated Average Hourly Cost per
FERC FTE, including salary + benefits.
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 78, Number 89 (Wednesday, May 8, 2013)]
[Notices]
[Pages 26766-26768]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10946]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC13-13-000]
Commission Information Collection Activities (FERC Form 580);
Comment Request; Revision
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, 44 USC 3506(c)(2)(A), the Federal Energy Regulatory
Commission (Commission or FERC) is soliciting public comment on the
currently approved information collection, FERC Form No. 580
(Interrogatory on Fuel and Energy Purchase Practices).
DATES: Comments on the collections of information are due July 8, 2013.
ADDRESSES: You may submit comments (identified by Docket No. IC13-13-
000) by either of the following methods:
eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202)
273-0873.
SUPPLEMENTARY INFORMATION:
Title: Interrogatory on Fuel and Energy Purchase Practices (FERC
Form No. 580).
OMB Control No.: 1902-0131.
Type of Request: Three-year approval of the FERC Form No. 580.
Abstract: FERC Form No. 580 is collected in even numbered years.
The Public Utility Regulatory Policies Act (PURPA) \1\ amended the
Federal Power Act (FPA) and directed the Commission to make
comprehensive biennial reviews of certain matters related to automatic
adjustment clauses (AACs) in wholesale rate schedules used by public
utilities subject to the Commission's jurisdiction. Specifically, the
Commission is required to examine whether the clauses effectively
provide the incentives for efficient use of resources and whether the
clauses reflect only those costs that are either ``subject to periodic
fluctuations'' or ``not susceptible to precise determinations'' in rate
cases prior to the time the costs are incurred.
---------------------------------------------------------------------------
\1\ Enacted November 8, 1978.
---------------------------------------------------------------------------
The Commission is also required to review the practices of each
public utility under AACs ``to insure efficient use of resources under
such clauses.'' \2\ In response to the PURPA directive, the Commission
(Docket Number IN79-6-000) established an investigation. Beginning in
1982, the Commission collected ``Interrogatory on Fuel and Energy
Purchase Practices'' data every other year.
---------------------------------------------------------------------------
\2\ The review requirement is set forth in two paragraphs of
Section 208 of PURPA, 49 Stat. 851; 16 U.S.C. 824d.
---------------------------------------------------------------------------
In 2010, the Commission redesigned the form to collect the
information electronically through use of a standard form. Based on
filer comments in response to the new electronic form used in the 2010
and 2012 collections, FERC recommends the following changes to the
form:
Question 1
--Repair the email field to eliminate error messages.
Question 2
--Add a column labeled ``Is this AAC a fuel adjustment clause?''
--Add a column labeled ``Tariff volume number containing''. This
information will aid staff in locating AACs.
--Remove the column and, thus, the request for information titled:
[cir] ``Type/s of AAC''
[cir] ``Type of costs that were passed through the AAC--if fuel,
state fuel type''
There has been an increasing number of AAC-related cost types. This
field makes it difficult for Commission staff to repopulate the
dropdowns for this column without additional OMB approval. The
information otherwise gained from respondents supplying the information
collected in these columns will not be lost. Staff will locate and
[[Page 26767]]
recover the information from Commission rate filings by using the AAC
identification information given by respondents in the first three
columns of Question 2.
--Rename Question 2 columns as follows to correct typographical errors:
------------------------------------------------------------------------
From To
------------------------------------------------------------------------
Identify service agreement within rate Identify service schedule, if
schedule containing AAC. any, where the AAC is located
within the rate schedule.
If rate schedule superseded or Was rate schedule superseded or
abandoned during 2012-2013. abandoned during 2012-2013?
------------------------------------------------------------------------
Additional changes to Question 2 table:
--Add a check box to enable the utility to indicate that it had no non-
transmission related AACs during the reporting years, if the situation
applies. This box, when checked, clearly indicates that there were no
AACs to report.
--Add a ``Copy Row'' button to facilitate data entry.
We are further reducing the amount of information required for AACs
that are not fuel adjustment clauses. Utilities with no fuel adjustment
clauses only need to respond to questions 1 and 2. Utilities with a FAC
will continue to complete the entire form.
Question 3
--Reword the question from:
------------------------------------------------------------------------
From To
------------------------------------------------------------------------
If during the 2010 and 2011 period, the If during the 2012-2013 period,
Utility had any contracts or the Utility had any contracts
agreements for the purchase of either or agreements for the purchase
energy or capacity under which all or of either energy or capacity
any portion of the purchase costs were under which all or any portion
passed through the AAC, for each of the purchase costs were
purchase provide the information passed through a fuel
requested in the table below. Provide adjustment clause (FAC), for
the information separately for each each purchase from a PURPA
reporting year 2010 and 2011. Do not Qualifying Facility (QF) or
report purchased power where none of Independent Power Producer
the costs were recovered through an (IPP) provide the information
AAC. requested in the non-shaded
columns of the table below.
Provide the information
separately for each reporting
year 2012 and 2013. Do not
report purchased power where
none of the costs were
recovered through an FAC. For
each purchase where costs were
flowed through an FAC, fill-in
the non-shaded columns and
either ``Only energy charges''
or ``The total cost of the
purchase of economic power''
columns, whichever apply.
------------------------------------------------------------------------
The Commission is only interested in QF and IPP information here
and not every power purchase contracts/agreement. The language will be
similar to what was used in Form No. 580 interrogatories prior to 2010.
--Remove the request for information and thus the columns titled:
[cir] Was an after-the-fact comparison made of actual avoided costs
against the purchase costs?
[cir] Were purchases made on an hourly economic dispatch basis?
From the information provided in the 2010 and 2012 filings the
Commission has found that it can fully evaluate regulatory compliance
without this information.
Question 6
Change the question as follows:
------------------------------------------------------------------------
From To
------------------------------------------------------------------------
For each fuel supply contract, where For each fuel supply contract,
costs were subject to 18 CFR 35.14, of longer than one year in
(including informal agreements with duration, in force at any time
associated companies), in force at any during 2012 and/or 2013, where
time during 2012 and/or 2013, of costs were subject to 18 CFR
longer than one year in duration, 35.14, (including informal
provide the requested information. agreements with associated
Report the data individually, for each companies), provide the
contract, for each calendar year. [No requested information. Report
response to any part of Question 6 for the data individually for each
fuel oil no. 2 is necessary.] Report contract for each calendar
all fuels consumed for electric power year. No response to any part
generation and thermal energy of Question 6 for fuel oil no.
associated with the production of 2 is necessary. Report all
electricity. Information for only fuels consumed for electric
coal, natural gas, and oil should be power generation and thermal
reported. Information for ALL FUELS energy associated with the
e.g. fossil fuels, wood chips), EXCEPT production of electricity.
URANIUM, should be reported. Information for only coal,
natural gas, and oil should be
reported.
------------------------------------------------------------------------
--As with the request for transportation information that was
eliminated in 2010, the Commission has found alternative information
sources and analytical approaches sufficient to eliminate the request
for fuels other than coal, natural gas and oil.
--Add a ``Copy Contract'' button.
Question 6a
--Add a column labeled ``Is contract evergreen?''.
--Add a column labeled ``Pipeline quality? (Y/N)''.
Question 6b
--Add a new column to the fuel quantity section labeled: ``Coal
(x10\3\tons) not delivered by end of contract year.''
--Add a column labeled ``Pipeline quality? (Y/N)''.
Questions 7 and 8. There are no proposed changes.
Glossary: Define Evergreen contracts as follows: Evergreen
contract: a contract that is renewed automatically or by notice from
year to year until canceled by either party.
Access to the Revised Materials: A copy of the form, desk
reference, and glossary are attached to this docket, but they are not
included in the Federal
[[Page 26768]]
Register.\3\ Interested parties can see the form electronically as part
of this notice in FERC's eLibrary (https://www.ferc.gov/docs-filing/elibrary.asp) by searching Docket No. IC13-13-000. Interested parties
may also request paper or electronic copies of the form and desk
reference by contacting Ellen Brown, by telephone at (202) 502-8663, by
fax at (202) 273-0873, or by email at DataClearance@ferc.gov.
---------------------------------------------------------------------------
\3\ The attached form is for illustrative purposes only and does
not include all the interactive features of the actual form. For a
copy of the actual form, please contact Ellen Brown as indicated in
this notice.
---------------------------------------------------------------------------
Type of Respondents: Large FERC-jurisdictional electric public
utilities.
Estimate of Annual Burden: \4\ The Commission estimates the total
Public Reporting Burden for this information collection as:
---------------------------------------------------------------------------
\4\ Burden is defined as the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. For
further explanation of what is included in the information
collection burden, reference 5 CFR 1320.3.
FERC Form No. 580 (IC13-13-000):
Interrogatory on Fuel and Energy Purchase Practices
----------------------------------------------------------------------------------------------------------------
Average
Number of Number of Total Number of burden hours Estimated total
respondents responses per responses (A) per response annual burden
(A) respondent (B) x (B) = (C) (D) (C) x (D)
----------------------------------------------------------------------------------------------------------------
Respondents with FACs......... 37 0.5 18.5 103 1,905.5
Respondents with AACs, but no 10 0.5 5 20 100
FACs.........................
Respondents with no AACs nor 35 0.5 17.5 2 35
FACs.........................
---------------------------------------------------------------------------------
Total..................... .............. .............. ............... .............. 2,040.5
----------------------------------------------------------------------------------------------------------------
Despite the changes to the Form 580, burden estimates per response
for each entity will not change from previously approved amounts. The
burden estimate may vary by utility depending on whether the utility
has or does not have an automatic adjustment clause and depending on
whether or not those utilities with adjustment clauses allow automatic
adjustment of fuel cost.
The total estimated annual cost burden to respondents is $142,835.
[2040.5 hours * $70/hour \5\ = $142,835]
---------------------------------------------------------------------------
\5\ FY2013 Estimated Average Hourly Cost per FERC FTE, including
salary + benefits.
---------------------------------------------------------------------------
The estimated annual cost of filing the FERC Form 580 per response
is $1,742. [$142,835 / 82 responses = $1,742/response]
Comments: The Commission seeks public comment on and subsequent OMB
approval of the proposed revised information collection. Also, the
Commission invites comments on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
Dated: May 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-10946 Filed 5-7-13; 8:45 am]
BILLING CODE 6717-01-P