Alaska Electric Light & Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 26357-26358 [2013-10646]

Download as PDF Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices All participants planning to attend the Conowingo Project site review should RSVP to Robert Judge at (610) 765–5331 or Rober.Judge2@exeloncorp.com. Schedule for the Muddy Run Pumped Storage Project Site Review Date and Time: Thursday, May 23, 2013, 9:00 a.m. Location: Visitor’s Center at Muddy Run Recreation Park, Muddy Run Pumped Storage Project, 172 Bethesda Church Rd W, Holtwood, Pennsylvania. All participants planning to attend the Muddy Run Project site review should RSVP to Robert Judge at (610) 765–5331 or Rober.Judge2@exeloncorp.com. If you have any questions please contact Emily Carter at (202) 502–6512 or emily.carter@ferc.gov. Dated: April 30, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10641 Filed 5–3–13; 8:45 am] interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on Wednesday, May 8, 2013. Dated: April 26, 2013. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2013–10623 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P [Docket Nos. PR13–47–000; PR13–19–000] DEPARTMENT OF ENERGY Cranberry Pipeline Corporation; Notice of Filing mstockstill on DSK4VPTVN1PROD with NOTICES Federal Energy Regulatory Commission Federal Energy Regulatory Commission Take notice that on April 25, 2013, Cranberry Pipeline Corporation (Cranberry) submitted tariff records to reflect revisions to its transportation and storage rates, as well as fuel and lostand- unaccounted-for percentages that Cranberry proposed in its Petition for Rate Approval filed on December 18, 2012, in Docket No. PR13–19–000. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and [Project No. 2307–064] VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 Alaska Electric Light & Power Company; Notice of Intent To File License Application, Filing of PreApplication Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Procedures. b. Project No.: 2307–064. c. Date Filed: March 29, 2013. d. Submitted By: Alaska Electric Light & Power Company (AEL&P). e. Name of Project: Salmon and Annex Creek Hydroelectric Project. f. Location: On Salmon and Annex Creeks, in the City and Borough of Juneau, Alaska. The project occupies 692.6 acres of United States lands administered by the U.S. Forest Service. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: K. Scott Willis, Vice President, Generation, AEL&P, 5601 Tonsgard Court, Juneau, AK 99801; (907) 463–6396; email scott.willis@aelp.com. i. Contact: Suzanne Novak at (202) 502–6665; or email at suzanne.novak@ferc.gov. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 26357 j. AEL&P filed its request to use the Traditional Licensing Process on March 29, 2013. AEL&P provided public notice of its request on March 29, 2013. In a letter dated May 1, 2013, the Director of the Division of Hydropower Licensing approved AEL&P’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Alaska State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating AEL&P as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act, section 305 of the Magnuson-Stevens Fishery Conservation and Management Act, and section 106 of the National Historic Preservation Act. m. AEL&P filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 2307–064. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by August 31, 2016. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances E:\FR\FM\06MYN1.SGM 06MYN1 26358 Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices related to this or other pending projects. For assistance, contact FERC Online Support. Dated: April 30, 2013. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. OR13–17–000] [Docket No. OR13–18–000] TransCanada Keystone Pipeline, LP; Notice of Petition for Declaratory Order [FR Doc. 2013–10646 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–13123–002–CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a. Date and Time of Meeting: Wednesday, May 8, 2013, at 9:00 a.m. (Pacific Time). b. Location: Palm Desert Center, University of California–Riverside, Building B, Rooms 114–117, 75080 Frank Sinatra Drive, Palm Desert, CA 92211. This notice is a follow-up to a notice published on April 23, 2013, which stated that the meeting would take place in the vicinity of Palm Springs but did not include the precise location of the meeting. c. FERC Contact: Kenneth Hogan, (202) 502–8434: Kenneth.Hogan@ferc.gov. d. Purpose of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to improve agency coordination and discuss the agencies’ overlapping jurisdictions (pursuant to the Federal Land Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby invited to observe the meeting in person. f. This meeting was originally noticed on July 17, 2012, and subsequently postponed on August 3, 2012. mstockstill on DSK4VPTVN1PROD with NOTICES DEPARTMENT OF ENERGY Dated: April 29, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10615 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P Take notice that on April 26, 2013, pursuant to Rule 207(a)(2) of the Commission’s Rules of Practices and Procedure, 18 CFR 385.207(a)(2)(2012), TransCanada Keystone Pipeline, LP filed a petition seeking a declaratory order affirming the specified rate structure, rate principles and methodology in the manner described more fully in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on May 20, 2013. Dated: April 30, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2013–10639 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Marketlink, LLC; Notice of Petition for Declaratory Order Take notice that on April 26, 2013, pursuant to Rule 207(a)(2) of the Commission’s Rules of Practices and Procedure, 18 CFR 385.207(a)(2)(2012), Marketlink, LLC filed a petition seeking a declaratory order affirming the specified rate structure, cost of service calculation, rate principles and methodology, and prorationing policy in the manner described more fully in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on May 20, 2013. E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 78, Number 87 (Monday, May 6, 2013)]
[Notices]
[Pages 26357-26358]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10646]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2307-064]


Alaska Electric Light & Power Company; Notice of Intent To File 
License Application, Filing of Pre-Application Document, and Approving 
Use of the Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Procedures.
    b. Project No.: 2307-064.
    c. Date Filed: March 29, 2013.
    d. Submitted By: Alaska Electric Light & Power Company (AEL&P).
    e. Name of Project: Salmon and Annex Creek Hydroelectric Project.
    f. Location: On Salmon and Annex Creeks, in the City and Borough of 
Juneau, Alaska. The project occupies 692.6 acres of United States lands 
administered by the U.S. Forest Service.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: K. Scott Willis, Vice President, 
Generation, AEL&P, 5601 Tonsgard Court, Juneau, AK 99801; (907) 463-
6396; email scott.willis@aelp.com.
    i. Contact: Suzanne Novak at (202) 502-6665; or email at 
suzanne.novak@ferc.gov.
    j. AEL&P filed its request to use the Traditional Licensing Process 
on March 29, 2013. AEL&P provided public notice of its request on March 
29, 2013. In a letter dated May 1, 2013, the Director of the Division 
of Hydropower Licensing approved AEL&P's request to use the Traditional 
Licensing Process.
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920; and (c) the Alaska State 
Historic Preservation Officer, as required by section 106, National 
Historical Preservation Act, and the implementing regulations of the 
Advisory Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating AEL&P as the Commission's 
non-federal representative for carrying out informal consultation, 
pursuant to section 7 of the Endangered Species Act, section 305 of the 
Magnuson-Stevens Fishery Conservation and Management Act, and section 
106 of the National Historic Preservation Act.
    m. AEL&P filed a Pre-Application Document (PAD; including a 
proposed process plan and schedule) with the Commission, pursuant to 18 
CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 2307-064. Pursuant to 18 
CFR 16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by August 31, 
2016.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances

[[Page 26358]]

related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: April 30, 2013.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-10646 Filed 5-3-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.