Combined Notice of Filings #1, 26348-26349 [2013-10635]

Download as PDF 26348 Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—All filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: April 26, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10614 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC13–98–000. Applicants: SWG Colorado, LLC, SWG Arapahoe, LLC. Description: Application under Section 203 of the Federal Power Act of SWG Colorado, LLC, et al. Filed Date: 4/26/13. VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 Accession Number: 20130426–5259. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: EC13–99–000. Applicants: Wabash Valley Power Association, Inc. Description: Joint Application of Wabash Valley Power Association, Inc. for Authorization under Section 203 of the Federal Power Act. Filed Date: 4/29/13. Accession Number: 20130429–5051. Comments Due: 5 p.m. e.t. 5/20/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2179–018; ER10–2181–018; ER10–2182–018. Applicants: R.E. Ginna Nuclear Power Plant, LLC, Nine Mile Point Nuclear Station, LLC, Calvert Cliffs Nuclear Power Plant, LLC. Description: Notice of Change in Status of Calvert Cliffs Nuclear Power Plant, LLC, et al. Filed Date: 4/26/13. Accession Number: 20130426–5252. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER12–281–003. Applicants: Northampton Generating Company, L.P. Description: Notice of Non-Material Change in Status of Northampton Generating Company, L.P. Filed Date: 4/29/13. Accession Number: 20130429–5213. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER12–2068–003; ER10–2460–005; ER10–2461–005; ER12–682–006; ER10–2463–005; ER11– 2201–009; ER12–1311–005; ER10–2466– 006; ER11–4029–005; ER13–17–003. Applicants: Blue Sky East, LLC, Canandaigua Power Partners I, LLC, Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC, Evergreen Wind Power III, LLC, Niagara Wind Power, LLC, Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC. Description: Notice of Change in Status of Blue Sky East, LLC, et al. Filed Date: 4/29/13. Accession Number: 20130429–5085. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER12–2178–006; ER10–2172–017; ER12–2311–006; ER11–2016–012; ER10–2184–017; ER10–2183–014; ER10–1048–014 ER10– 2176–018; ER10–2192–017; ER11–2056– 011; ER10–2178–017; ER10–2174–017; ER11–2014–014; ER11–2013–014 ER10– 3308–016; ER10–1020–013; ER10–1145– 013; ER10–1144–012; ER10–1078–013; ER10–1080–013; ER11–2010–014 ER10– 1081–013; ER10–2180–017; ER11–2011– 013; ER12–2201–006; ER12–2528–005; ER11–2009–013; ER11–3989–011 ER10– 1143–013; ER11–2780–012; ER12–1829– PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 006; ER11–2007–012; ER12–1223–011; ER11–2005–014. Applicants: AV Solar Ranch 1, LLC, Baltimore Gas and Electric Company, Beebe Renewable Energy, LLC, Cassia Gulch Wind Park, LLC, CER Generation II, LLC, CER Generation, LLC, Commonwealth Edison Company, Constellation Energy Commodities Group, Inc., Constellation Energy Commodities Group Maine, LLC, Constellation Mystic Power, LLC, Constellation NewEnergy, Inc., Constellation Power Source Generation Inc., Cow Branch Wind Power, L.L.C.,CR Clearing, LLC, Criterion Power Partners, LLC, Exelon Framingham, LLC,cExelon Generation Company, LLC, Exelon New Boston, LLC, Exelon West Medway, LLC, Exelon Wind 4, LLC, Exelon Wyman, LLC, Handsome Lake Energy, LLC, Harvest Windfarm, LLC, Harvest II Windfarm, LLC, High Mesa Energy, LLC, Michigan Wind 1, LLC, Michigan Wind 2, LLC, PECO Energy Company, Safe Harbor Water Power Corporation, Shooting Star Wind Project, LLC, Tuana Springs Energy, LLC, Wildcat Wind, LLC, Wind Capital Holdings, LLC. Description: Notice of Change in Status of AV Solar Ranch 1, LLC, et al. Filed Date: 4/26/13. Accession Number: 20130426–5265. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–665–001. Applicants: Midcontinent Independent System Operator, Inc. Description: 2013–04–29 LTTR ARR Compliance Filing to be effective 3/29/ 2013. Filed Date: 4/29/13. Accession Number: 20130429–5114. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER13–834–001. Applicants: Southwest Power Pool, Inc. Description: Registration Freeze Compliance to be effective 4/1/2013. Filed Date: 4/26/13. Accession Number: 20130426–5234. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1352–000. Applicants: Massachusetts Electric Company. Description: Interconnection Agreement Between Massachusetts Electric Co. and Ameresco to be effective 6/26/2013. Filed Date: 4/26/13. Accession Number: 20130426–5231. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1353–000. Applicants: PJM Interconnection, L.L.C. Description: Revisions to the OATT & OA re Demand Response M&V Procedure Revisions to be effective 6/ 25/2013. E:\FR\FM\06MYN1.SGM 06MYN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices Filed Date: 4/26/13. Accession Number: 20130426–5232. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1354–000. Applicants: Massachusetts Electric Company. Description: Interconnection Agreement Between Mass. Electric Co. and Casella Waste Systems to be effective 6/26/2013. Filed Date: 4/26/13. Accession Number: 20130426–5235. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1355–000. Applicants: PacifiCorp. Description: Termination of PacifiCorp Rate Schedule No. 611, the Northern Tier Transmission Group Second Amended and Restated 2007 Funding Agreement. Filed Date: 4/26/13. Accession Number: 20130426–5245. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1356–000. Applicants: Duke Energy Florida, Inc. Description: Annual update of cost factors for Florida Power Corp. Interchange Agreements to be effective 5/1/2013. Filed Date: 4/29/13. Accession Number: 20130429–5028. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER13–1357–000. Applicants: Duke Energy Progress, Inc. Description: Notice of Succession to be effective 4/29/2013. Filed Date: 4/29/13. Accession Number: 20130429–5128. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER13–1358–000. Applicants: Duke Energy Florida, Inc. Description: Notice of Succession to be effective 4/29/2013. Filed Date: 4/29/13. Accession Number: 20130429–5139. Comments Due: 5 p.m. e.t. 5/20/13. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES13–22–000. Applicants: MDU Resources Group, Inc. Description: Application for MDU Resources Group, Inc. for authority to issues shares of common stock. Filed Date: 4/29/13. Accession Number: 20130429–5211. Comments Due: 5 p.m. e.t. 5/20/13. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD13–9–000. Applicants: North American Electric Reliability Corporation. Description: Joint Petition of North American Electric Reliability VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 Corporation and Southwest Power Pool Regional Entity for Approval of Proposed Regional Reliability Standard PRC–006–SPP–01—Underfrequency Load Shedding. Filed Date: 4/26/13. Accession Number: 20130426–5268. Comments Due: 5 p.m. e.t. 5/20/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 29, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–10635 Filed 5–3–13; 8:45 am] 26349 address matters at issue in the following Commission proceedings: Docket No. RC11–5, North American Electric Reliability Corporation Docket No. RC11–6, North American Electric Reliability Corporation Docket No. RC13–4, North American Electric Reliability Corporation Docket No. RR8–4, North American Electric Reliability Corporation Docket No. RR12–8, North American Electric Reliability Corporation Docket No. RR13–2, North American Electric Reliability Corporation Docket No. RR13–3, North American Electric Reliability Corporation Docket No. RR13–4, North American Electric Reliability Corporation Docket No. RD09–11, North American Electric Reliability Corporation Docket No. RD10–2, North American Electric Reliability Corporation Docket No. RD12–5, North American Electric Reliability Corporation Docket No. RD13–2, North American Electric Reliability Corporation Docket No. RD13–3, North American Electric Reliability Corporation Docket No. RD13–5, North American Electric Reliability Corporation Docket No. RD13–6, North American Electric Reliability Corporation Docket No. RD13–8, North American Electric Reliability Corporation For further information, please contact Jonathan First, 202–502–8529, or jonathan.first@ferc.gov. Dated: April 29, 2013. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2013–10622 Filed 5–3–13; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings DEPARTMENT OF ENERGY The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the following meetings: North American Electric Reliability Corporation Member Representatives Committee and Board of Trustees Meetings Board of Trustees Compliance Committee, Finance and Audit Committee, and Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA, 02199. May 8 (7:00 a.m.–5:00 p.m.) and May 9 (8:00 a.m.–1:00 p.m.), 2013 Further information regarding these meetings may be found at: https:// www.nerc.com/calendar.php. The discussions at the meetings, which are open to the public, may PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Project Nos. 13424–002; 14516–000] Lock+TM Hydro Friends Fund VI, LLC, FFP Iowa 2, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 2, 2013, Lock+TM Hydro Friends Fund VI, LLC (Hydro Friends) and Free Flow Power Iowa 2, LLC (FFP Iowa 2) filed preliminary permit applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower projects at the U.S. Army Corps of Engineers’ (Corps) Mississippi River Lock and Dam No. 13, located on the Mississippi River near Clinton, in Clinton County, Iowa. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 78, Number 87 (Monday, May 6, 2013)]
[Notices]
[Pages 26348-26349]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10635]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC13-98-000.
    Applicants: SWG Colorado, LLC, SWG Arapahoe, LLC.
    Description: Application under Section 203 of the Federal Power Act 
of SWG Colorado, LLC, et al.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5259.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: EC13-99-000.
    Applicants: Wabash Valley Power Association, Inc.
    Description: Joint Application of Wabash Valley Power Association, 
Inc. for Authorization under Section 203 of the Federal Power Act.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5051.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-2179-018; ER10-2181-018; ER10-2182-018.
    Applicants: R.E. Ginna Nuclear Power Plant, LLC, Nine Mile Point 
Nuclear Station, LLC, Calvert Cliffs Nuclear Power Plant, LLC.
    Description: Notice of Change in Status of Calvert Cliffs Nuclear 
Power Plant, LLC, et al.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5252.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER12-281-003.
    Applicants: Northampton Generating Company, L.P.
    Description: Notice of Non-Material Change in Status of Northampton 
Generating Company, L.P.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5213.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Docket Numbers: ER12-2068-003; ER10-2460-005; ER10-2461-005; ER12-
682-006; ER10-2463-005; ER11-2201-009; ER12-1311-005; ER10-2466-006; 
ER11-4029-005; ER13-17-003.
    Applicants: Blue Sky East, LLC, Canandaigua Power Partners I, LLC, 
Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind 
Power, LLC, Evergreen Wind Power III, LLC, Niagara Wind Power, LLC, 
Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC.
    Description: Notice of Change in Status of Blue Sky East, LLC, et 
al.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5085.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Docket Numbers: ER12-2178-006; ER10-2172-017; ER12-2311-006; ER11-
2016-012; ER10-2184-017; ER10-2183-014; ER10-1048-014 ER10-2176-018; 
ER10-2192-017; ER11-2056-011; ER10-2178-017; ER10-2174-017; ER11-2014-
014; ER11-2013-014 ER10-3308-016; ER10-1020-013; ER10-1145-013; ER10-
1144-012; ER10-1078-013; ER10-1080-013; ER11-2010-014 ER10-1081-013; 
ER10-2180-017; ER11-2011-013; ER12-2201-006; ER12-2528-005; ER11-2009-
013; ER11-3989-011 ER10-1143-013; ER11-2780-012; ER12-1829-006; ER11-
2007-012; ER12-1223-011; ER11-2005-014.
    Applicants: AV Solar Ranch 1, LLC, Baltimore Gas and Electric 
Company, Beebe Renewable Energy, LLC, Cassia Gulch Wind Park, LLC, CER 
Generation II, LLC, CER Generation, LLC, Commonwealth Edison Company, 
Constellation Energy Commodities Group, Inc., Constellation Energy 
Commodities Group Maine, LLC, Constellation Mystic Power, LLC, 
Constellation NewEnergy, Inc., Constellation Power Source Generation 
Inc., Cow Branch Wind Power, L.L.C.,CR Clearing, LLC, Criterion Power 
Partners, LLC, Exelon Framingham, LLC,cExelon Generation Company, LLC, 
Exelon New Boston, LLC, Exelon West Medway, LLC, Exelon Wind 4, LLC, 
Exelon Wyman, LLC, Handsome Lake Energy, LLC, Harvest Windfarm, LLC, 
Harvest II Windfarm, LLC, High Mesa Energy, LLC, Michigan Wind 1, LLC, 
Michigan Wind 2, LLC, PECO Energy Company, Safe Harbor Water Power 
Corporation, Shooting Star Wind Project, LLC, Tuana Springs Energy, 
LLC, Wildcat Wind, LLC, Wind Capital Holdings, LLC.
    Description: Notice of Change in Status of AV Solar Ranch 1, LLC, 
et al.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5265.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-665-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 2013-04-29 LTTR ARR Compliance Filing to be effective 
3/29/2013.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5114.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Docket Numbers: ER13-834-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Registration Freeze Compliance to be effective 4/1/
2013.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5234.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-1352-000.
    Applicants: Massachusetts Electric Company.
    Description: Interconnection Agreement Between Massachusetts 
Electric Co. and Ameresco to be effective 6/26/2013.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5231.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-1353-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Revisions to the OATT & OA re Demand Response M&V 
Procedure Revisions to be effective 6/25/2013.

[[Page 26349]]

    Filed Date: 4/26/13.
    Accession Number: 20130426-5232.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-1354-000.
    Applicants: Massachusetts Electric Company.
    Description: Interconnection Agreement Between Mass. Electric Co. 
and Casella Waste Systems to be effective 6/26/2013.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5235.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-1355-000.
    Applicants: PacifiCorp.
    Description: Termination of PacifiCorp Rate Schedule No. 611, the 
Northern Tier Transmission Group Second Amended and Restated 2007 
Funding Agreement.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5245.
    Comments Due: 5 p.m. e.t. 5/17/13.

    Docket Numbers: ER13-1356-000.
    Applicants: Duke Energy Florida, Inc.
    Description: Annual update of cost factors for Florida Power Corp. 
Interchange Agreements to be effective 5/1/2013.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5028.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Docket Numbers: ER13-1357-000.
    Applicants: Duke Energy Progress, Inc.
    Description: Notice of Succession to be effective 4/29/2013.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5128.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Docket Numbers: ER13-1358-000.
    Applicants: Duke Energy Florida, Inc.
    Description: Notice of Succession to be effective 4/29/2013.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5139.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Take notice that the Commission received the following electric 
securities filings:
    Docket Numbers: ES13-22-000.
    Applicants: MDU Resources Group, Inc.
    Description: Application for MDU Resources Group, Inc. for 
authority to issues shares of common stock.
    Filed Date: 4/29/13.
    Accession Number: 20130429-5211.
    Comments Due: 5 p.m. e.t. 5/20/13.

    Take notice that the Commission received the following electric 
reliability filings.
    Docket Numbers: RD13-9-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Joint Petition of North American Electric Reliability 
Corporation and Southwest Power Pool Regional Entity for Approval of 
Proposed Regional Reliability Standard PRC-006-SPP-01--Underfrequency 
Load Shedding.
    Filed Date: 4/26/13.
    Accession Number: 20130426-5268.
    Comments Due: 5 p.m. e.t. 5/20/13.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 29, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-10635 Filed 5-3-13; 8:45 am]
BILLING CODE 6717-01-P