Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management, 26358 [2013-10615]
Download as PDF
26358
Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 30, 2013.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. OR13–17–000]
[Docket No. OR13–18–000]
TransCanada Keystone Pipeline, LP;
Notice of Petition for Declaratory Order
[FR Doc. 2013–10646 Filed 5–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13123–002–CA]
Eagle Mountain Pumped Storage
Hydroelectric Project, Eagle Crest
Energy; Notice of Meeting With the
Bureau of Land Management
a. Date and Time of Meeting:
Wednesday, May 8, 2013, at 9:00 a.m.
(Pacific Time).
b. Location: Palm Desert Center,
University of California–Riverside,
Building B, Rooms 114–117, 75080
Frank Sinatra Drive, Palm Desert, CA
92211. This notice is a follow-up to a
notice published on April 23, 2013,
which stated that the meeting would
take place in the vicinity of Palm
Springs but did not include the precise
location of the meeting.
c. FERC Contact: Kenneth Hogan,
(202) 502–8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting:
Commission staff will meet with the
staff of the Bureau of Land Management
to improve agency coordination and
discuss the agencies’ overlapping
jurisdictions (pursuant to the Federal
Land Policy and Management Act and
the Federal Power Act), on the Eagle
Mountain Pumped Storage
Hydroelectric Project.
e. All local, state, and federal
agencies, tribes, and interested parties,
are hereby invited to observe the
meeting in person.
f. This meeting was originally noticed
on July 17, 2012, and subsequently
postponed on August 3, 2012.
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Dated: April 29, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10615 Filed 5–3–13; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on April 26, 2013,
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2012),
TransCanada Keystone Pipeline, LP
filed a petition seeking a declaratory
order affirming the specified rate
structure, rate principles and
methodology in the manner described
more fully in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on May 20, 2013.
Dated: April 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10639 Filed 5–3–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:06 May 03, 2013
Jkt 229001
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Marketlink, LLC; Notice of Petition for
Declaratory Order
Take notice that on April 26, 2013,
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2012),
Marketlink, LLC filed a petition seeking
a declaratory order affirming the
specified rate structure, cost of service
calculation, rate principles and
methodology, and prorationing policy in
the manner described more fully in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on May 20, 2013.
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 78, Number 87 (Monday, May 6, 2013)]
[Notices]
[Page 26358]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10615]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-13123-002-CA]
Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest
Energy; Notice of Meeting With the Bureau of Land Management
a. Date and Time of Meeting: Wednesday, May 8, 2013, at 9:00 a.m.
(Pacific Time).
b. Location: Palm Desert Center, University of California-
Riverside, Building B, Rooms 114-117, 75080 Frank Sinatra Drive, Palm
Desert, CA 92211. This notice is a follow-up to a notice published on
April 23, 2013, which stated that the meeting would take place in the
vicinity of Palm Springs but did not include the precise location of
the meeting.
c. FERC Contact: Kenneth Hogan, (202) 502-8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting: Commission staff will meet with the
staff of the Bureau of Land Management to improve agency coordination
and discuss the agencies' overlapping jurisdictions (pursuant to the
Federal Land Policy and Management Act and the Federal Power Act), on
the Eagle Mountain Pumped Storage Hydroelectric Project.
e. All local, state, and federal agencies, tribes, and interested
parties, are hereby invited to observe the meeting in person.
f. This meeting was originally noticed on July 17, 2012, and
subsequently postponed on August 3, 2012.
Dated: April 29, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-10615 Filed 5-3-13; 8:45 am]
BILLING CODE 6717-01-P