Southern Energy, Inc.; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 26347-26348 [2013-10614]

Download as PDF Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices All filings must (1) bear in all capital letters the title ‘‘PROTEST,’’ ‘‘MOTION TO INTERVENE,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions, or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone mstockstill on DSK4VPTVN1PROD with NOTICES Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Reply comments due Commission issues draft EA. Comments on draft EA. Modified terms and conditions. Commission issues final EA. Target Date June 28, 2013. August 12, 2013. December 26, 2013. January 24, 2014. March 25, 2014. June 23, 2014. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. q. A license applicant must file no later than 60 days following the date of issuance of this notice of acceptance and ready for environmental analysis provided for in 5.22: (1) a copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 agency received the request; or (3) evidence of waiver of water quality certification. Dated: April 29, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10620 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI13–4–000] Southern Energy, Inc.; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention b. Docket No: DI13–4–000 c. Date Filed: March 1, 2013 d. Applicant: Southern Energy, Inc. e. Name of Project: Walker Lake Hydroelectric Project f. Location: The proposed Walker Lake Hydroelectric Project will be located on Walker Lake near the City of Haines, in Haines Borough, Alaska. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Darrell Maple, President, Lynn Canal Professional Services, 660 S. Oregon Street, Jacksonville, OR 97530 telephone: (541) 702–2190; email: sdkmaple@mind.net i. FERC Contact: Any questions on this notice should be addressed to Ashish Desai, (202) 502–8370, or Email address: Ashish.Desai@ferc.gov j. Deadline for filing comments, protests, and/or motions is: 30 days from the issuance of this notice by the Commission. Comments, Motions to Intervene, and Protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 26347 Please include the docket number (DI13–4–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Walker Lake Hydroelectric Project would consist of: (1) Two rockfilled 15-foot-wide dams, making usable capacity of Walker Lake to be 4,300 acre-feet at a nomal maximum operating elevation of 1,195 feet mean sea level; (2) a concrete spillway and diversion channel for controlled releases to Walker Creek; (3) a freestanding concrete intake and reservoir outlet works at elevation 1,170 feet mean sea level diverting flow from the southeast dam into the penstock; (4) a 24-inch-diameter, 12,000-foot-long penstock, of which approximately 10,000 feet will be buried and 2,000 feet will be aboveground; (5) a powerhouse containing one generating unit rated at 1 megawatt at 780 feet of net head; (6) a 50-foot-long tailrace connecting the powerhouse with the Little Salmon River; (7) an underground, 4-mile-long, 12.5 kilovolt (kV) transmission line extending from the project to a point of interconnection with Inside Passage Electric Cooperative’s power grid; and (4) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the Docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOlineSupport@ferc.gov for TTY, call (202) 502–8659. A copy is also available for inspection and E:\FR\FM\06MYN1.SGM 06MYN1 26348 Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—All filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: April 26, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10614 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC13–98–000. Applicants: SWG Colorado, LLC, SWG Arapahoe, LLC. Description: Application under Section 203 of the Federal Power Act of SWG Colorado, LLC, et al. Filed Date: 4/26/13. VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 Accession Number: 20130426–5259. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: EC13–99–000. Applicants: Wabash Valley Power Association, Inc. Description: Joint Application of Wabash Valley Power Association, Inc. for Authorization under Section 203 of the Federal Power Act. Filed Date: 4/29/13. Accession Number: 20130429–5051. Comments Due: 5 p.m. e.t. 5/20/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2179–018; ER10–2181–018; ER10–2182–018. Applicants: R.E. Ginna Nuclear Power Plant, LLC, Nine Mile Point Nuclear Station, LLC, Calvert Cliffs Nuclear Power Plant, LLC. Description: Notice of Change in Status of Calvert Cliffs Nuclear Power Plant, LLC, et al. Filed Date: 4/26/13. Accession Number: 20130426–5252. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER12–281–003. Applicants: Northampton Generating Company, L.P. Description: Notice of Non-Material Change in Status of Northampton Generating Company, L.P. Filed Date: 4/29/13. Accession Number: 20130429–5213. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER12–2068–003; ER10–2460–005; ER10–2461–005; ER12–682–006; ER10–2463–005; ER11– 2201–009; ER12–1311–005; ER10–2466– 006; ER11–4029–005; ER13–17–003. Applicants: Blue Sky East, LLC, Canandaigua Power Partners I, LLC, Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC, Evergreen Wind Power III, LLC, Niagara Wind Power, LLC, Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC. Description: Notice of Change in Status of Blue Sky East, LLC, et al. Filed Date: 4/29/13. Accession Number: 20130429–5085. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER12–2178–006; ER10–2172–017; ER12–2311–006; ER11–2016–012; ER10–2184–017; ER10–2183–014; ER10–1048–014 ER10– 2176–018; ER10–2192–017; ER11–2056– 011; ER10–2178–017; ER10–2174–017; ER11–2014–014; ER11–2013–014 ER10– 3308–016; ER10–1020–013; ER10–1145– 013; ER10–1144–012; ER10–1078–013; ER10–1080–013; ER11–2010–014 ER10– 1081–013; ER10–2180–017; ER11–2011– 013; ER12–2201–006; ER12–2528–005; ER11–2009–013; ER11–3989–011 ER10– 1143–013; ER11–2780–012; ER12–1829– PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 006; ER11–2007–012; ER12–1223–011; ER11–2005–014. Applicants: AV Solar Ranch 1, LLC, Baltimore Gas and Electric Company, Beebe Renewable Energy, LLC, Cassia Gulch Wind Park, LLC, CER Generation II, LLC, CER Generation, LLC, Commonwealth Edison Company, Constellation Energy Commodities Group, Inc., Constellation Energy Commodities Group Maine, LLC, Constellation Mystic Power, LLC, Constellation NewEnergy, Inc., Constellation Power Source Generation Inc., Cow Branch Wind Power, L.L.C.,CR Clearing, LLC, Criterion Power Partners, LLC, Exelon Framingham, LLC,cExelon Generation Company, LLC, Exelon New Boston, LLC, Exelon West Medway, LLC, Exelon Wind 4, LLC, Exelon Wyman, LLC, Handsome Lake Energy, LLC, Harvest Windfarm, LLC, Harvest II Windfarm, LLC, High Mesa Energy, LLC, Michigan Wind 1, LLC, Michigan Wind 2, LLC, PECO Energy Company, Safe Harbor Water Power Corporation, Shooting Star Wind Project, LLC, Tuana Springs Energy, LLC, Wildcat Wind, LLC, Wind Capital Holdings, LLC. Description: Notice of Change in Status of AV Solar Ranch 1, LLC, et al. Filed Date: 4/26/13. Accession Number: 20130426–5265. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–665–001. Applicants: Midcontinent Independent System Operator, Inc. Description: 2013–04–29 LTTR ARR Compliance Filing to be effective 3/29/ 2013. Filed Date: 4/29/13. Accession Number: 20130429–5114. Comments Due: 5 p.m. e.t. 5/20/13. Docket Numbers: ER13–834–001. Applicants: Southwest Power Pool, Inc. Description: Registration Freeze Compliance to be effective 4/1/2013. Filed Date: 4/26/13. Accession Number: 20130426–5234. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1352–000. Applicants: Massachusetts Electric Company. Description: Interconnection Agreement Between Massachusetts Electric Co. and Ameresco to be effective 6/26/2013. Filed Date: 4/26/13. Accession Number: 20130426–5231. Comments Due: 5 p.m. e.t. 5/17/13. Docket Numbers: ER13–1353–000. Applicants: PJM Interconnection, L.L.C. Description: Revisions to the OATT & OA re Demand Response M&V Procedure Revisions to be effective 6/ 25/2013. E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 78, Number 87 (Monday, May 6, 2013)]
[Notices]
[Pages 26347-26348]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10614]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI13-4-000]


Southern Energy, Inc.; Notice of Declaration of Intention and 
Soliciting Comments, Protests, and/or Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention
    b. Docket No: DI13-4-000
    c. Date Filed: March 1, 2013
    d. Applicant: Southern Energy, Inc.
    e. Name of Project: Walker Lake Hydroelectric Project
    f. Location: The proposed Walker Lake Hydroelectric Project will be 
located on Walker Lake near the City of Haines, in Haines Borough, 
Alaska.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Darrell Maple, President, Lynn Canal 
Professional Services, 660 S. Oregon Street, Jacksonville, OR 97530 
telephone: (541) 702-2190; email: sdkmaple@mind.net
    i. FERC Contact: Any questions on this notice should be addressed 
to Ashish Desai, (202) 502-8370, or Email address: 
Ashish.Desai@ferc.gov
    j. Deadline for filing comments, protests, and/or motions is: 30 
days from the issuance of this notice by the Commission.
    Comments, Motions to Intervene, and Protests may be filed 
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the 
instructions on the Commission's Web site under the ``eFiling'' link. 
If unable to be filed electronically, documents may be paper-filed. To 
paper-file, an original and eight copies should be mailed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. For more information on how to submit 
these types of filings, please go to the Commission's Web site located 
at https://www.ferc.gov/filing-comments.asp.
    Please include the docket number (DI13-4-000) on any comments, 
protests, and/or motions filed.
    k. Description of Project: The proposed Walker Lake Hydroelectric 
Project would consist of: (1) Two rockfilled 15-foot-wide dams, making 
usable capacity of Walker Lake to be 4,300 acre-feet at a nomal maximum 
operating elevation of 1,195 feet mean sea level; (2) a concrete 
spillway and diversion channel for controlled releases to Walker Creek; 
(3) a freestanding concrete intake and reservoir outlet works at 
elevation 1,170 feet mean sea level diverting flow from the southeast 
dam into the penstock; (4) a 24-inch-diameter, 12,000-foot-long 
penstock, of which approximately 10,000 feet will be buried and 2,000 
feet will be aboveground; (5) a powerhouse containing one generating 
unit rated at 1 megawatt at 780 feet of net head; (6) a 50-foot-long 
tailrace connecting the powerhouse with the Little Salmon River; (7) an 
underground, 4-mile-long, 12.5 kilovolt (kV) transmission line 
extending from the project to a point of interconnection with Inside 
Passage Electric Cooperative's power grid; and (4) appurtenant 
facilities.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the interests of interstate or foreign 
commerce would be affected by the project. The Commission also 
determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the Docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also 
available for inspection and

[[Page 26348]]

reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--All filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
Motion to Intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: April 26, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-10614 Filed 5-3-13; 8:45 am]
BILLING CODE 6717-01-P