FFP Project 111, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 26359-26360 [2013-10610]

Download as PDF Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices Dated: April 30, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10640 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14514–000] Community of Elfin Cove, DBA Elfin Cove Utility Commission; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications mstockstill on DSK4VPTVN1PROD with NOTICES On April 24, 2013, the Community of Elfin Cove, DBA Elfin Cove Utility Commission County (Elfin Cove) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Crooked Creek and Jim’s Lake Hydroelectric Project (project) to be located on Crooked Creek and Jim’s Lake, 70 miles east of Juneau, in the unincorporated Sitka Recording District, Alaska. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of two developments, the Upper System and the Lower System. Upper System (1) A 40-foot-long, 4-foot-wide, 4-footwide diversion structure to divert up to five cubic feet per second (cfs) from Crooked Creek; (2) a 1,450-foot-long, 1foot-diameter penstock extending between the diversion structure and the powerhouse; (3) a powerhouse containing a 35-kilowatt (kW) power recovery turbine; (4) a 25-foot-long, 8foot-wide, 3-foot-deep cobble-lined tailrace discharging flows into Jim’s Lake; (5) an underground 7,300-footlong, 7.2/12.47-kilovolt (kV) transmission line extending from both of the project powerhouses to Elfin Cove’s existing 7.2/12.47-kV transmission line; and (6) appurtenant facilities. Lower System (1) A siphon intake located in Jim’s Lake to divert seven cfs from Jim’s Lake; (2) a 1,800-foot-long, 1.2-foot-diameter VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 penstock extending between the siphon intake and the powerhouse; (3) a powerhouse containing a 125-kW Pelton or impulse turbine; (4) a 150-foot-long, 8-foot-wide, 3-foot-deep cobble-lined tailrace discharging flows into Port Althorp; and (5) appurtenant facilities. The estimated annual generation of the project would be 672.7 gigawatthours. The project would be partially located on 60 acres of federal lands managed by the U.S. Forest Service in the Tongass National Forest. Applicant Contact: Mr. Joel Groves, Polarconsult Alaska, Inc., 1503 W. 33rd Avenue, #310, Anchorage, Alaska 99503; phone: (907) 258–2420 ext. 204. FERC Contact: Kim Nguyen; phone: (202) 502–6105. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14514) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 30, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10637 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 26359 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14474–000] FFP Project 111, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 111, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Newt Graham Lock and Dam, located on the Verdigris River near the town of Inola in Wagoner County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 770-foot-long, 300foot-wide intake channel with a 85-footlong retaining wall; (2) a 100-foot-long overflow bank extension connecting the dam to the powerhouse; (3) a 140-footlong, 90-foot-wide powerhouse, containing two generating units with a total capacity of 10.1 megawatts; (4) a 1,000-foot-long, 220-foot-wide tailrace with a 40-foot-long retaining wall; (5) a 4.16/99 kilo-Volt (kV) substation; (6) a 0.9 mile-long, 99 kV transmission line. The project would have an average annual generation of 32, 300 megawatthours, and utilize surplus water from the Newt Graham Lock and Dam as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Chris Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web E:\FR\FM\06MYN1.SGM 06MYN1 26360 Federal Register / Vol. 78, No. 87 / Monday, May 6, 2013 / Notices site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14474) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 26, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10610 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14473–000] mstockstill on DSK4VPTVN1PROD with NOTICES FFP Project 112, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 112, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Chouteau Lock and Dam, located on the Verdigris River near the town of Okay in Wagoner County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. VerDate Mar<15>2010 17:06 May 03, 2013 Jkt 229001 The proposed project would consist of the following: (1) A 180-foot-long, 80foot-wide intake channel with a 120foot-long retaining wall; (2) a 130-footlong, 90-foot-wide powerhouse, located on the east side of the dam, containing two generating units with a total capacity of 11.6 MW; (3) a 100-foot-long, 175-foot-wide tailrace with a 50-footlong retaining wall; (4) a 4.16/69 kiloVolt (kV) substation; and (5) a 0.3-milelong, 69 kV transmission line. The proposed project would have an average annual generation of 36,900 megawatthours, and utilize surplus water from the Chouteau Lock and Dam, as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Chris Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14473) in the docket number field to access the document. For assistance, contact FERC Online Support. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Dated: April 26, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–10625 Filed 5–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–215–000] Dominion Transmission Inc.; Prior Notice Activity Under Blanket Certificate On April 19, 2013, Dominion Transmission Inc. (Dominion), filed a prior notice request pursuant to Sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act, and Dominion’s blanket certificate issued in Docket No. G–1391. Dominion seeks authorization to replace pipeline facilities constructed in the early 1950s, located in Westmoreland County, Pennsylvania. Upgraded facilities will comply with current federal pipeline safety standards. Questions regarding this application may be directed to Brad Knisley, Regulatory and Certificates Analyst, Dominion Transmission, Inc., 701 East Cary Street, Richmond, VA 23219, or by calling 804 771–4412, by faxing 804 771–4804, or by emailing Brad.A.Knisley@dom.com . Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such motions or protests must be filed on or before the comment date. Anyone filing a motion to E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 78, Number 87 (Monday, May 6, 2013)]
[Notices]
[Pages 26359-26360]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10610]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14474-000]


FFP Project 111, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On January 1, 2013, FFP Project 111, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project 
located at the U.S. Army Corps of Engineers' (Corps) Newt Graham Lock 
and Dam, located on the Verdigris River near the town of Inola in 
Wagoner County, Oklahoma. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) A 770-
foot-long, 300-foot-wide intake channel with a 85-foot-long retaining 
wall; (2) a 100-foot-long overflow bank extension connecting the dam to 
the powerhouse; (3) a 140-foot-long, 90-foot-wide powerhouse, 
containing two generating units with a total capacity of 10.1 
megawatts; (4) a 1,000-foot-long, 220-foot-wide tailrace with a 40-
foot-long retaining wall; (5) a 4.16/99 kilo-Volt (kV) substation; (6) 
a 0.9 mile-long, 99 kV transmission line. The project would have an 
average annual generation of 32, 300 megawatt-hours, and utilize 
surplus water from the Newt Graham Lock and Dam as directed by the 
Corps.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power 
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 
283-2822.
    FERC Contact: Chris Casey, christiane.casey@ferc.gov, (202) 502-
8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web

[[Page 26360]]

site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14474) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 26, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-10610 Filed 5-3-13; 8:45 am]
BILLING CODE 6717-01-P