Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management, 25263 [2013-10136]
Download as PDF
pmangrum on DSK3VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 83 / Tuesday, April 30, 2013 / Notices
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is May 13, 2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10135 Filed 4–29–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
13:22 Apr 29, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13123–002—CA]
Eagle Mountain Pumped Storage
Hydroelectric Project; Eagle Crest
Energy; Notice of Meeting With the
Bureau of Land Management
a. Date and Time of Meeting:
Wednesday, May 8, 2013, at 9:00 a.m.
(Pacific Time)
b. Location: In the vicinity of Palm
Springs, California; however the precise
meeting location is still pending and
will be provided in a subsequent notice.
c. FERC Contact: Kenneth Hogan,
(202) 502–8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting:
Commission staff will meet with the
staff of the Bureau of Land Management
to improve agency coordination and
discuss the agencies’ overlapping
jurisdictions (pursuant to the Federal
Land Policy and Management Act and
the Federal Power Act), on the Eagle
Mountain Pumped Storage
Hydroelectric Project.
e. All local, state, and federal
agencies, tribes, and interested parties,
are hereby invited to observe the
meeting in person.
f. This meeting was originally noticed
on July 17, 2012, and subsequently
postponed on August 3, 2012.
Dated: April 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10136 Filed 4–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14492–000]
Hydrodynamics, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, Hydrodynamics,
Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Ruby River Reservoir Water Power
Project (project) to be located on the
Ruby River, near Alder in Madison
County, Montana. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
25263
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An 846-foot-long, 111foot-high earthen dam; (2) a reservoir
with a surface area of 970 acres and a
storage capacity of 36,663 acre-feet at a
normal water surface elevation of 5,392
feet mean sea level; (3) a 180-foot-long,
84-inch-diameter concrete with steel
liner penstock consisting of a concrete
outlet tunnel works; (4) a 20-foot-long,
84-inch-diameter penstock extending
from the tunnel to the powerhouse; (5)
a powerhouse containing two generating
units with a combined installed
capacity of 2.3 megawatts; (6) a tailrace
discharging flows into the Ruby River at
the base of the dam; (7) a new
substation; (8) a 2-mile-long, 15-kilovolt
transmission line; and (9) appurtenant
facilities. The proposed project would
have an average annual generation of 10
gigawatt-hours.
Applicant Contact: Roger Kirk and
Ben Singer, Hydrodynamics, Inc., P.O.
Box 1136, Bozeman, Montana 59771;
phone: (406) 587–5086.
FERC Contact: John Matkowski;
phone: (202) 502–8576.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
E:\FR\FM\30APN1.SGM
30APN1
Agencies
[Federal Register Volume 78, Number 83 (Tuesday, April 30, 2013)]
[Notices]
[Page 25263]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10136]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-13123-002--CA]
Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest
Energy; Notice of Meeting With the Bureau of Land Management
a. Date and Time of Meeting: Wednesday, May 8, 2013, at 9:00 a.m.
(Pacific Time)
b. Location: In the vicinity of Palm Springs, California; however
the precise meeting location is still pending and will be provided in a
subsequent notice.
c. FERC Contact: Kenneth Hogan, (202) 502-8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting: Commission staff will meet with the
staff of the Bureau of Land Management to improve agency coordination
and discuss the agencies' overlapping jurisdictions (pursuant to the
Federal Land Policy and Management Act and the Federal Power Act), on
the Eagle Mountain Pumped Storage Hydroelectric Project.
e. All local, state, and federal agencies, tribes, and interested
parties, are hereby invited to observe the meeting in person.
f. This meeting was originally noticed on July 17, 2012, and
subsequently postponed on August 3, 2012.
Dated: April 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-10136 Filed 4-29-13; 8:45 am]