Duke Energy Carolinas, LLC; Notice of Availability of Environmental Assessment, 25262 [2013-10133]
Download as PDF
25262
Federal Register / Vol. 78, No. 83 / Tuesday, April 30, 2013 / Notices
35.13(a)(2)(iii: SGIA 1988 between
Niagara Mohawk and WM Renewable
Energy to be effective 6/23/2013.
Filed Date: 4/23/13.
Accession Number: 20130423–5044.
Comments Due: 5 p.m. ET 5/14/13.
Docket Numbers: ER13–1321–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
04–23–2013 SA 2490 Tower-Embarrass
T–T IA to be effective 4/24/2013.
Filed Date: 4/23/13.
Accession Number: 20130423–5131.
Comments Due: 5 p.m. ET 5/14/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Development, which is located on the
Catawba River in McDowell and Burke
counties, North Carolina. The project is
located in nine counties in North
Carolina and five counties in South
Carolina.
As planned by the project licensee,
Duke Energy Carolinas, LLC (Duke
Energy), the ESSI work would involve
the installation of a counterweight
stability berm against the downstream
face of Linville Dam. The ESSI work is
necessary because it has been
determined that Linville Dam could fail
during a seismic event (identified as an
earthquake of approximately magnitude
5.4). Accordingly, the Commission is
requiring remediation under Part 12 of
its regulations. In the environmental
assessment (EA), Commission staff has
analyzed the probable environmental
effects of the planned work and has
concluded that approval of the work,
with appropriate environmental
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment.
A copy of the EA is available at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number (P–2232) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free at 1–866–208–3372, or for TTY,
(202) 502–8659.
Dated: April 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–10090 Filed 4–29–13; 8:45 am].
BILLING CODE 6717–01–P.
[FR Doc. 2013–10133 Filed 4–29–13; 8:45 am]
BILLING CODE 6717–01–P
Dated: April 24, 2013.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
[Project No. 2232–581]
Federal Energy Regulatory
Commission
Duke Energy Carolinas, LLC; Notice of
Availability of Environmental
Assessment
pmangrum on DSK3VPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
[Docket Nos. PR13–16–002; PR13–17–002;
Not Consolidated]
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR Part 380),
Commission staff has reviewed plans,
filed April 2011, and supplemented
February 14, 2012, to perform
embankment seismic stability
improvement (ESSI) work at Linville
Dam, part of the Catawba-Wateree
Hydroelectric Project’s Bridgewater
VerDate Mar<15>2010
13:22 Apr 29, 2013
Jkt 229001
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Tuesday, April 30, 2013.
[FR Doc. 2013–10132 Filed 4–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
TexStar Transmission, LP; TEAK
Texana Transmission Company, LP;
Notice of Filings
Federal Energy Regulatory
Commission
Take notice that on April 23, 2013,
the applicants listed above submitted an
amendment to the December 6, 2012,
baseline filing of their Statement of
Operating Conditions for services
provided under Section 311 of the
Natural Gas Policy Act of 1978 (NGPA).
Any person desiring to participate in
this rate filing must file in accordance
Mega Energy Holdings, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
[Docket No. ER13–1298–000]
This is a supplemental notice in the
above-referenced proceeding, of Mega
Energy Holdings, LLC’s application for
E:\FR\FM\30APN1.SGM
30APN1
Agencies
[Federal Register Volume 78, Number 83 (Tuesday, April 30, 2013)]
[Notices]
[Page 25262]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10133]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2232-581]
Duke Energy Carolinas, LLC; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR Part 380), Commission staff has reviewed plans,
filed April 2011, and supplemented February 14, 2012, to perform
embankment seismic stability improvement (ESSI) work at Linville Dam,
part of the Catawba-Wateree Hydroelectric Project's Bridgewater
Development, which is located on the Catawba River in McDowell and
Burke counties, North Carolina. The project is located in nine counties
in North Carolina and five counties in South Carolina.
As planned by the project licensee, Duke Energy Carolinas, LLC
(Duke Energy), the ESSI work would involve the installation of a
counterweight stability berm against the downstream face of Linville
Dam. The ESSI work is necessary because it has been determined that
Linville Dam could fail during a seismic event (identified as an
earthquake of approximately magnitude 5.4). Accordingly, the Commission
is requiring remediation under Part 12 of its regulations. In the
environmental assessment (EA), Commission staff has analyzed the
probable environmental effects of the planned work and has concluded
that approval of the work, with appropriate environmental measures,
would not constitute a major Federal action significantly affecting the
quality of the human environment.
A copy of the EA is available at the Commission's Public Reference
Room, located at 888 First Street NE., Room 2A, Washington, DC 20426.
The EA may also be viewed on the Commission's Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number (P-
2232) in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or call toll-free at 1-866-208-3372, or for TTY, (202) 502-8659.
Dated: April 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-10133 Filed 4-29-13; 8:45 am]
BILLING CODE 6717-01-P