Combined Notice of Filings #1, 25260 [2013-10089]
Download as PDF
25260
Federal Register / Vol. 78, No. 83 / Tuesday, April 30, 2013 / Notices
The grantee survey will be conducted
with all 820 regular Upward Bound
projects in the spring of 2013.
Preliminary results from the survey,
which will be shared internally within
ED in late Spring 2013, will help inform
the selection of a yet-to-be determined
promising strategy or strategies for a
possible experimental study that could
be implemented in a set of UB grantees.
ED will decide whether to exercise the
option for a study of promising
strategies in Upward Bound by June
2013, based, in large part, on the
findings from the survey of UB grantees.
Additionally, IES plans to publicly
release the findings from the survey of
UB grantees through a report that will
require approval by the IES Standards
and Review Office. This report will be
of great interest to program providers
and researchers concerned about college
access programs in light of the recent
changes to the Upward Bound program
that were made in the 2012 grant
competition. One of the important
questions arising from the UB 2012
grant competition is what type of
approaches or strategies UB projects
initiated in an effort to reduce the cost
of implementing key program
components while not reducing the
number of students served. For
example, a review of 2012 UB grant
applications revealed that UB applicants
proposed introducing the use of various
technologically-based approaches to
delivering some program components.
The UB grantee survey is intended to
identify and describe the specific
strategies that UB projects actually
implement to fulfill their grant
objectives in conducting required
program components.
Dated: April 22, 2013.
Stephanie Valentine,
Acting Director, Information Collection
Clearance Division, Privacy, Information and
Records Management Services, Office of
Management.
[FR Doc. 2013–09923 Filed 4–29–13; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
pmangrum on DSK3VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3063–001.
Applicants: Green Country Energy,
LLC.
Description: Green Country Energy,
LLC submits second supplement to
VerDate Mar<15>2010
13:22 Apr 29, 2013
Jkt 229001
December 21, 2012 Triennial Market
Power Update for the Southwest Power
Pool, Inc. Region.
Filed Date: 4/19/13.
Accession Number: 20130419–5225.
Comments Due: 5 p.m. ET 5/10/13.
Docket Numbers: ER12–1179–005.
Applicants: Southwest Power Pool,
Inc.
Description: Integrated Marketplace
Compliance Filing—Docket ER12–1179–
002 to be effective 3/1/2014.
Filed Date: 4/19/13.
Accession Number: 20130419–5189.
Comments Due: 5 p.m. ET 5/10/13.
Docket Numbers: ER13–1315–000.
Applicants: Massachusetts Electric
Company.
Description: Interconnection
Agreement Between Massachusetts
Electric Co. and Pepperell Hydro to be
effective 6/19/2013.
Filed Date: 4/19/13.
Accession Number: 20130419–5220.
Comments Due: 5 p.m. ET 5/10/13.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–44–007.
Applicants: El Paso Electric Company.
Description: El Paso Electric Company
submits Report on Operational Penalty
Distributions.
Filed Date: 4/18/13.
Accession Number: 20130418–5238.
Comments Due: 5 p.m. ET 5/9/13.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RD13–8–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of an
Interpretation to Reliability Standards
TPL–003–0a and TPL–004–0.
Filed Date: 4/12/13.
Accession Number: 20130412–5227.
Comments Due: 5 p.m. ET 5/13/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 22, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–10089 Filed 4–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
April 23, 2013.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–804–000.
Applicants: Northwest Pipeline GP.
Description: Revised System Map to
be effective 5/1/2013.
Filed Date: 4/22/13.
Accession Number: 20130422–5073.
Comments Due: 5 p.m. ET 5/6/13.
Docket Numbers: RP13–805–000.
Applicants: Boardwalk Storage
Company, LLC.
Description: Revise Hub Services and
Umbrella Pro Forma Agmts to be
effective 5/22/2013.
Filed Date: 4/22/13.
Accession Number: 20130422–5074.
Comments Due: 5 p.m. ET 5/6/13.
Docket Numbers: RP13–806–000.
Applicants: Portland Natural Gas
Transmission System.
Description: Docket No. RP08–306
Compliance Filing 1 to be effective 9/
30/2010.
Filed Date: 4/22/13.
Accession Number: 20130422–5103.
Comments Due: 5 p.m. ET 5/6/13.
Docket Numbers: RP13–807–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Negotiated Rate—EDF
Trading to be effective 5/1/2013.
Filed Date: 4/22/13.
Accession Number: 20130422–5140.
Comments Due: 5 p.m. ET 5/6/13.
Docket Numbers: RP13–808–000.
Applicants: KPC.
Description: KPC Change of Address
to be effective 6/1/2013.
Filed Date: 4/22/13.
Accession Number: 20130422–5150.
Comments Due: 5 p.m. ET 5/6/13.
Docket Numbers: RP13–809–000.
Applicants: Kern River Gas
Transmission Company.
E:\FR\FM\30APN1.SGM
30APN1
Agencies
[Federal Register Volume 78, Number 83 (Tuesday, April 30, 2013)]
[Notices]
[Page 25260]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-10089]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3063-001.
Applicants: Green Country Energy, LLC.
Description: Green Country Energy, LLC submits second supplement to
December 21, 2012 Triennial Market Power Update for the Southwest Power
Pool, Inc. Region.
Filed Date: 4/19/13.
Accession Number: 20130419-5225.
Comments Due: 5 p.m. ET 5/10/13.
Docket Numbers: ER12-1179-005.
Applicants: Southwest Power Pool, Inc.
Description: Integrated Marketplace Compliance Filing--Docket ER12-
1179-002 to be effective 3/1/2014.
Filed Date: 4/19/13.
Accession Number: 20130419-5189.
Comments Due: 5 p.m. ET 5/10/13.
Docket Numbers: ER13-1315-000.
Applicants: Massachusetts Electric Company.
Description: Interconnection Agreement Between Massachusetts
Electric Co. and Pepperell Hydro to be effective 6/19/2013.
Filed Date: 4/19/13.
Accession Number: 20130419-5220.
Comments Due: 5 p.m. ET 5/10/13.
Take notice that the Commission received the following open access
transmission tariff filings:
Docket Numbers: OA07-44-007.
Applicants: El Paso Electric Company.
Description: El Paso Electric Company submits Report on Operational
Penalty Distributions.
Filed Date: 4/18/13.
Accession Number: 20130418-5238.
Comments Due: 5 p.m. ET 5/9/13.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RD13-8-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for Approval of an Interpretation to Reliability Standards
TPL-003-0a and TPL-004-0.
Filed Date: 4/12/13.
Accession Number: 20130412-5227.
Comments Due: 5 p.m. ET 5/13/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 22, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-10089 Filed 4-29-13; 8:45 am]
BILLING CODE 6717-01-P