Download as PDF 25068 Federal Register / Vol. 78, No. 82 / Monday, April 29, 2013 / Notices i. FERC Contact: Kelly Wolcott; phone: (202) 502–6480; email: kelly.wolcott@ferc.gov j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: June 14, 2013. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. m. The application is not ready for environmental analysis at this time. n. The proposed project would utilize the existing U.S. Bureau of Reclamation’s Warm Springs dam and reservoir, and would consist of the following new facilities: (1) An 8-footdiameter, 32-foot-long cylindrical intake; (2) a 190-foot-long, 8-footdiameter steel penstock; (3) a powerhouse containing one 2.7megawatt Francis or Kaplan turbine; (4) a 2.2-mile-long, 25-kilovolt (kV) transmission line; and (5) appurtenant facilities. The average annual generation is estimated to be 7.442 gigawatt-hours. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. With this notice, we are initiating consultation with the Oregon State Historic Preservation Officer (SHPO), as required by section 106 of the National Historic Preservation Act and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. q. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Adequacy or Deficiency Letter (if needed) .................................................................................................................... Issue Acceptance Letter .......................................................................................................................................................... Issue Scoping Document 1 for Comments ............................................................................................................................. Comments on Scoping Document 1 ....................................................................................................................................... Issue Scoping Document 2 ..................................................................................................................................................... Issue notice of ready for environmental analysis .................................................................................................................... Issue draft Environmental Assessment (EA) ........................................................................................................................... Comments on draft EA ............................................................................................................................................................ Issue final EA ........................................................................................................................................................................... Dated: April 19, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–09981 Filed 4–26–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission emcdonald on DSK67QTVN1PROD with NOTICES [Docket No. CP13–125–000] Columbia Gas Transmission, LLC; Notice of Application Take notice that on April 5, 2013, Columbia Gas Transmission, LLC (Columbia), 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed an application pursuant to section 7(c) of VerDate Mar<15>2010 14:16 Apr 26, 2013 Jkt 229001 the Natural Gas Act to construct approximately 12.6 miles of 8-inch diameter looping pipeline connected to its existing transmission system and appurtenant facilities in Summers and Monroe Counties, West Virginia and Giles County, Virginia to provide transportation service, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 June 2013. August 2013. September 2013. October 2013. December 2013. December 2013. June 2014. July 2014. October 2014. Any questions regarding this application should be directed to Fredric J. George, Lead Counsel, Columbia Gas Transmission, LLC, P.O. Box 1273, Charleston, West Virginia 25325–1273, or call 304–357–2359, or fax 304–357–3206, or by email fgeorge@nisource.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final E:\FR\FM\29APN1.SGM 29APN1 emcdonald on DSK67QTVN1PROD with NOTICES Federal Register / Vol. 78, No. 82 / Monday, April 29, 2013 / Notices environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be VerDate Mar<15>2010 14:16 Apr 26, 2013 Jkt 229001 required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: May 10, 2013. Dated: April 19, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–09983 Filed 4–26–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 516–474] South Carolina Electric & Gas Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-project use of project lands and waters. b. Project No: 516–474. c. Date Filed: November 29, 2012 and March 19, 2013. d. Applicant: South Carolina Electric & Gas Company. e. Name of Project: Saluda Hydroelectric Project. f. Location: The project is located on the Saluda River in Lexington, Newberry, Richland, and Saluda counties, South Carolina. The proposed action would occur on Lake Murray in Lexington County, South Carolina. g. Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Tommy Boozer, Manager, Lake Management Programs, South Carolina Electric & Gas Company, 6248 Bush River Road, Columbia, SC 29212, telephone 803– 217–9007. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 25069 i. FERC Contact: Mr. Lorance Yates at 678–245–3084 or email: lorance.yates@ferc.gov. j. Deadline for filing comments and/ or motions: May 20, 2013. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P–516–474) on any comments, motions, or recommendations filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Application: South Carolina Electric and Gas Company proposes to permit Lake Murray Docks, Inc./Windward Point Yacht Club to use project waters to expand an existing boat dock facility through the addition of an 8-slip floating dock to accommodate a maximum of 12 additional boats. The proposed new structures would be for the private use of members of the Windward Point Yacht Club. The new work would consist of attaching the proposed addition to the existing floating facility. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling 202–502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits E:\FR\FM\29APN1.SGM 29APN1

Agencies

[Federal Register Volume 78, Number 82 (Monday, April 29, 2013)]
[Notices]
[Pages 25068-25069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09983]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-125-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on April 5, 2013, Columbia Gas Transmission, LLC 
(Columbia), 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed an 
application pursuant to section 7(c) of the Natural Gas Act to 
construct approximately 12.6 miles of 8-inch diameter looping pipeline 
connected to its existing transmission system and appurtenant 
facilities in Summers and Monroe Counties, West Virginia and Giles 
County, Virginia to provide transportation service, all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection. The filing may also be viewed on the web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Fredric J. George, Lead Counsel, Columbia Gas Transmission, LLC, P.O. 
Box 1273, Charleston, West Virginia 25325-1273, or call 304-357-2359, 
or fax 304-357-3206, or by email fgeorge@nisource.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final

[[Page 25069]]

environmental impact statement (FEIS) or EA for this proposal. The 
filing of the EA in the Commission's public record for this proceeding 
or the issuance of a Notice of Schedule for Environmental Review will 
serve to notify federal and state agencies of the timing for the 
completion of all necessary reviews, and the subsequent need to 
complete all federal authorizations within 90 days of the date of 
issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: May 10, 2013.

    Dated: April 19, 2013.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-09983 Filed 4-26-13; 8:45 am]
BILLING CODE 6717-01-P