Public Hearing, 24785-24786 [2013-09887]
Download as PDF
Federal Register / Vol. 78, No. 81 / Friday, April 26, 2013 / Notices
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on May 23, 2013, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for June 20, 2013, which will be noticed
separately. The Commission will also
hear testimony on amending its
Regulatory Program Fee Schedule. The
public should take note that this public
hearing will be the only opportunity to
offer oral comment to the Commission
for the listed projects and other items.
The deadline for the submission of
written comments is June 3, 2013.
DATES: The public hearing will convene
on May 23, 2013, at 2:30 p.m. The
public hearing will end at 5:00 p.m. or
at the conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
June 3, 2013.
ADDRESSES: The public hearing will be
conducted at the Pennsylvania State
Capitol, Room 8E–B, East Wing,
Commonwealth Avenue, Harrisburg, Pa.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436.
Information concerning the
applications for these projects is
available at the SRBC Water Resource
Portal at www.srbc.net/wrp. Materials
and supporting documents are available
to inspect and copy in accordance with
the Commission’s Access to Records
Policy at www.srbc.net/pubinfo/docs/
2009-02%20Access%20to%20
Records%20Policy%209-10-09.PDF.
erowe on DSK2VPTVN1PROD with NOTICES
SUMMARY:
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any project listed
below. The presiding officer reserves the
right to limit oral statements in the
interest of time and to otherwise control
the course of the hearing. Ground rules
will be posted on the Commission’s
Web site, www.srbc.net, prior to the
hearing for review. The presiding officer
reserves the right to modify or
supplement such rules at the hearing.
Written comments on any project listed
VerDate Mar<15>2010
14:46 Apr 25, 2013
Jkt 229001
below may also be mailed to Mr.
Richard Cairo, General Counsel,
Susquehanna River Basin Commission,
1721 North Front Street, Harrisburg, Pa.
17102–2391, or submitted electronically
through https://www.srbc.net/pubinfo/
publicparticipation.htm. Comments
mailed or electronically submitted must
be received by the Commission on or
before June 3, 2013, to be considered.
SUPPLEMENTARY INFORMATION: The
public hearing will cover amendment to
its Regulatory Program Fee Schedule.
Each June before the start of the next
fiscal year on July 1, the Commission
considers amendments to fee schedules.
The public hearing will also cover the
following projects:
Project Scheduled for Rescission Action
1. Project Sponsor and Facility:
Chevron Appalachia, LLC (Chest Creek),
Chest Township, Clearfield County, Pa.
(Docket No. 20100603).
Projects Scheduled for Action
1. Project Sponsor and Facility: Aqua
Infrastructure, LLC (Clearfield Creek),
Boggs Township, Clearfield County, Pa.
Application for renewal of surface water
withdrawal of up to 2.000 mgd (peak
day) (Docket No. 20081202).
2. Project Sponsor and Facility: Aqua
Infrastructure, LLC (Tioga River),
Hamilton Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 2.500 mgd (peak
day).
3. Project Sponsor and Facility:
Michael and Sandra Buhler (Bennett
Branch Sinnemahoning Creek), Huston
Township, Clearfield County, Pa.
Application for surface water
withdrawal of up to 1.000 mgd (peak
day).
4. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River), Athens Township,
Bradford County, Pa. Application for
renewal of surface water withdrawal of
up to 1.440 mgd (peak day) (Docket No.
20080906).
5. Project Sponsor: Chobani, Inc.
Project Facility: South Edmeston, Town
of Columbus, Chenango County, N.Y.
Application for groundwater
withdrawal of up to 0.720 mgd (30-day
average) from Well 1.
6. Project Sponsor: Chobani, Inc.
Project Facility: South Edmeston, Town
of Columbus, Chenango County, N.Y.
Application for groundwater
withdrawal of up to 0.720 mgd (30-day
average) from Well 2.
7. Project Sponsor: Chobani, Inc.
Project Facility: South Edmeston, Town
of Columbus, Chenango County, N.Y.
Application for groundwater
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
24785
withdrawal of up to 0.720 mgd (30-day
average) from Well 3.
8. Project Sponsor: Chobani, Inc.
Project Facility: South Edmeston, Town
of Columbus, Chenango County, N.Y.
Application for consumptive water use
of up to 0.283 mgd (peak day).
9. Project Sponsor: Delta Borough
Municipal Authority. Project Facility:
Delta Borough Water System, Peach
Bottom Township, York County, Pa.
Application for groundwater
withdrawal of up to 0.073 mgd (30-day
average) from Well 5.
10. Project Sponsor: Delta Borough
Municipal Authority. Project Facility:
Delta Borough Water System, Peach
Bottom Township, York County, Pa.
Application for groundwater
withdrawal of up to 0.043 mgd (30-day
average) from Well 6.
11. Project Sponsor: Delta Borough
Municipal Authority. Project Facility:
Delta Borough Water System, Peach
Bottom Township, York County, Pa.
Application for groundwater
withdrawal of up to 0.064 mgd (30-day
average) from Well 7.
12. Project Sponsor and Facility:
Equipment Transport, LLC (Pine Creek),
Gaines Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 0.467 mgd (peak
day).
13. Project Sponsor and Facility:
Equipment Transport, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 0.999 mgd (peak
day).
14. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, Pa.
Application for consumptive water use
of up to 0.900 mgd (peak day).
15. Project Sponsor and Facility: LDG
Innovation, LLC (Tioga River),
Lawrenceville Borough, Tioga County,
Pa. Modification to low flow protection
requirements of the surface water
withdrawal approval (Docket No.
20100311).
16. Project Sponsor and Facility:
Municipal Authority of the Borough of
Mansfield, Richmond Township, Tioga
County, Pa. Application for
groundwater withdrawal of up to 0.079
mgd (30-day average) from Well 3, and
authorization for interconnection with
Mansfield University as a supplemental
source.
17. Project Sponsor and Facility:
Martinsburg Municipal Authority, North
Woodbury Township, Blair County, Pa.
Application for groundwater
withdrawal of up to 0.288 mgd (30-day
average) from Wineland Well RW–1.
E:\FR\FM\26APN1.SGM
26APN1
erowe on DSK2VPTVN1PROD with NOTICES
24786
Federal Register / Vol. 78, No. 81 / Friday, April 26, 2013 / Notices
18. Project Sponsor and Facility:
Navitus, LLC (North Spring, Logan
Branch Watershed), Spring Township,
Centre County, Pa. Application for
surface water withdrawal of up to 1.440
mgd (peak day).
19. Project Sponsor: New Morgan
Landfill Company, Inc. Project Facility:
Conestoga Landfill, New Morgan
Borough, Berks County, Pa. Application
for groundwater withdrawal of up to
0.007 mgd (30-day average) from Well
SW–4.
20. Project Sponsor: New Oxford
Municipal Authority. Project Facility:
Oxen Country Meadows, Oxford
Township, Adams County, Pa.
Application for groundwater
withdrawal of up to 0.144 mgd (30-day
average) from Oxen Country Meadows
(OCM) Well 1.
21. Project Sponsor and Facility:
Somerset Regional Water Resources,
LLC (Salt Lick Creek), New Milford
Township, Susquehanna County, Pa.
Modification to project features of the
surface water withdrawal approval
(Docket No. 20100905).
22. Project Sponsor and Facility:
Southwestern Energy Production
Company (Middle Lake), New Milford
Township, Susquehanna County, Pa.
Modification to low flow protection
requirements of the surface water
withdrawal approval (Docket No.
20121223).
23. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Well 41 (Docket No.
19820501).
24. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, Pa.
Application for renewal of groundwater
withdrawal of up to 1.440 mgd (30-day
average) from Well 43 (Docket No.
19820501).
25. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, Pa.
Application for renewal of groundwater
withdrawal of up to 1.720 mgd (30-day
average) from Well 53 (Docket No.
19820501).
26. Project Sponsor: SWEPI LP (Tioga
River), Richmond Township, Tioga
County, Pa. Application for renewal of
surface water withdrawal with
modification to increase by an
additional 0.843 mgd (peak day), for a
total of 0.950 mgd (peak day) (Docket
No. 20090612).
27. Project Sponsor and Facility: WPX
Energy Appalachia, LLC (Susquehanna
River), Great Bend Township,
Susquehanna County, Pa. Application
VerDate Mar<15>2010
17:39 Apr 25, 2013
Jkt 229001
for renewal of surface water withdrawal
of up to 1.000 mgd (peak day) (Docket
No. 20090303).
28. Project Sponsor and Facility: York
County Solid Waste and Refuse
Authority, Hopewell Township, York
County, Pa. Modification to metering
requirements of the groundwater
withdrawal approval (Docket No.
20121226).
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806–808.
Dated: April 19, 2013.
Paul O. Swartz,
Executive Director.
[FR Doc. 2013–09887 Filed 4–25–13; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Office of the Secretary of
Transportation
[Docket No. DOT–OST–2013–XXXX]
Notice of Funding Availability for the
Department of Transportation’s
National Infrastructure Investments
Under the Consolidated and Further
Continuing Appropriations Act, 2013
Office of the Secretary of
Transportation, DOT.
ACTION: Notice of Funding Availability.
AGENCY:
This notice announces the
availability of funding and requests
proposals for the Department of
Transportation’s National Infrastructure
Investments. This notice is addressed to
organizations that are interested in
applying and provides guidance on
selection criteria and application
requirements for the National
Infrastructure Investments.
Title VIII of The Further Continuing
Appropriations Act, 2013 (Division F of
the Consolidated and Further
Continuing Appropriations Act, 2013,
Public Law 113–6, March 26, 2013)
(‘‘FY 2013 Appropriations Act’’)
appropriated $473.847 million to be
awarded by the Department of
Transportation (‘‘DOT’’) for National
Infrastructure Investments. DOT will
continue to refer to the program as
‘‘TIGER Discretionary Grants,’’ as this is
the title with which most stakeholders
are familiar. As with previous rounds of
TIGER, funds for the FY 2013 TIGER
program are to be awarded on a
competitive basis for projects that will
have a significant impact on the Nation,
a metropolitan area or a region.
Through this notice, DOT is soliciting
applications for TIGER Discretionary
Grants. In the event that this solicitation
does not result in the award and
SUMMARY:
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
obligation of all available funds, DOT
may decide to publish an additional
solicitation(s) or provide additional
funds to selected projects.
DATES: You must submit final
applications through Grants.gov by June
3, 2013, at 5:00 p.m. EDT (the
‘‘Application Deadline’’). The
Grants.gov ‘‘Apply’’ function will open
on April 29, 2013, allowing applicants
to submit final applications. You are
strongly encouraged to submit
applications in advance of the deadline.
ADDRESSES: You must submit
applications electronically through
Grants.gov. Only applications received
electronically through Grants.gov will
be deemed properly filed. Instructions
for submitting applications through
Grants.gov can be found on the TIGER
Web site (www.dot.gov/TIGER).
FOR FURTHER INFORMATION CONTACT: For
further information concerning this
notice please contact the TIGER
Discretionary Grant program staff via
email at TIGERGrants@dot.gov, or call
Howard Hill at 202–366–0301. A TDD is
available for individuals who are deaf or
hard of hearing at 202–366–3993. In
addition, DOT will regularly post
answers to questions and requests for
clarifications on DOT’s Web site at
www.dot.gov/TIGER. Applicants are
encouraged to contact DOT directly
rather than rely on third parties to
prepare application materials or
otherwise receive information about
TIGER Discretionary Grants.
SUPPLEMENTARY INFORMATION: This
notice is substantially similar to the
final notice published for the FY 2012
TIGER Discretionary Grant program in
the Federal Register on January 31,
2012. However, there are a few
significant differences:
1. Given the date of enactment of the
final year-long FY 2013 Appropriations
Act, the statutory timeframe for DOT to
obligate funds under this round of
TIGER Discretionary Grants is the
shortest of all of the rounds to date. In
order to meet this deadline, your
application must demonstrate that that
the project can meet all local, State, and
federal requirements by June 30, 2014,
in order for DOT to obligate funding in
advance of September 30, 2014. Each
application must include a detailed
statement of work, detailed project
schedule, and detailed project budget.
Due to the short timeframe for
obligation, project readiness and the risk
of delays will be treated as primary
selection criteria in DOT’s evaluation
process. You must identify risks and
mitigation strategies in your project
narratives. If your application is
submitted without a sufficiently
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 78, Number 81 (Friday, April 26, 2013)]
[Notices]
[Pages 24785-24786]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09887]
[[Page 24785]]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on May 23, 2013, in Harrisburg, Pennsylvania. At this public
hearing, the Commission will hear testimony on the projects listed in
the Supplementary Information section of this notice. Such projects are
intended to be scheduled for Commission action at its next business
meeting, tentatively scheduled for June 20, 2013, which will be noticed
separately. The Commission will also hear testimony on amending its
Regulatory Program Fee Schedule. The public should take note that this
public hearing will be the only opportunity to offer oral comment to
the Commission for the listed projects and other items. The deadline
for the submission of written comments is June 3, 2013.
DATES: The public hearing will convene on May 23, 2013, at 2:30 p.m.
The public hearing will end at 5:00 p.m. or at the conclusion of public
testimony, whichever is sooner. The deadline for the submission of
written comments is June 3, 2013.
ADDRESSES: The public hearing will be conducted at the Pennsylvania
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg,
Pa.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436.
Information concerning the applications for these projects is
available at the SRBC Water Resource Portal at www.srbc.net/wrp.
Materials and supporting documents are available to inspect and copy in
accordance with the Commission's Access to Records Policy at
www.srbc.net/pubinfo/docs/2009-02%20Access%20to%20Records%20Policy%209-10-09.PDF.
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any project listed below. The presiding officer
reserves the right to limit oral statements in the interest of time and
to otherwise control the course of the hearing. Ground rules will be
posted on the Commission's Web site, www.srbc.net, prior to the hearing
for review. The presiding officer reserves the right to modify or
supplement such rules at the hearing. Written comments on any project
listed below may also be mailed to Mr. Richard Cairo, General Counsel,
Susquehanna River Basin Commission, 1721 North Front Street,
Harrisburg, Pa. 17102-2391, or submitted electronically through https://www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or
electronically submitted must be received by the Commission on or
before June 3, 2013, to be considered.
SUPPLEMENTARY INFORMATION: The public hearing will cover amendment to
its Regulatory Program Fee Schedule. Each June before the start of the
next fiscal year on July 1, the Commission considers amendments to fee
schedules. The public hearing will also cover the following projects:
Project Scheduled for Rescission Action
1. Project Sponsor and Facility: Chevron Appalachia, LLC (Chest
Creek), Chest Township, Clearfield County, Pa. (Docket No. 20100603).
Projects Scheduled for Action
1. Project Sponsor and Facility: Aqua Infrastructure, LLC
(Clearfield Creek), Boggs Township, Clearfield County, Pa. Application
for renewal of surface water withdrawal of up to 2.000 mgd (peak day)
(Docket No. 20081202).
2. Project Sponsor and Facility: Aqua Infrastructure, LLC (Tioga
River), Hamilton Township, Tioga County, Pa. Application for surface
water withdrawal of up to 2.500 mgd (peak day).
3. Project Sponsor and Facility: Michael and Sandra Buhler (Bennett
Branch Sinnemahoning Creek), Huston Township, Clearfield County, Pa.
Application for surface water withdrawal of up to 1.000 mgd (peak day).
4. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River), Athens Township, Bradford County, Pa. Application
for renewal of surface water withdrawal of up to 1.440 mgd (peak day)
(Docket No. 20080906).
5. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston,
Town of Columbus, Chenango County, N.Y. Application for groundwater
withdrawal of up to 0.720 mgd (30-day average) from Well 1.
6. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston,
Town of Columbus, Chenango County, N.Y. Application for groundwater
withdrawal of up to 0.720 mgd (30-day average) from Well 2.
7. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston,
Town of Columbus, Chenango County, N.Y. Application for groundwater
withdrawal of up to 0.720 mgd (30-day average) from Well 3.
8. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston,
Town of Columbus, Chenango County, N.Y. Application for consumptive
water use of up to 0.283 mgd (peak day).
9. Project Sponsor: Delta Borough Municipal Authority. Project
Facility: Delta Borough Water System, Peach Bottom Township, York
County, Pa. Application for groundwater withdrawal of up to 0.073 mgd
(30-day average) from Well 5.
10. Project Sponsor: Delta Borough Municipal Authority. Project
Facility: Delta Borough Water System, Peach Bottom Township, York
County, Pa. Application for groundwater withdrawal of up to 0.043 mgd
(30-day average) from Well 6.
11. Project Sponsor: Delta Borough Municipal Authority. Project
Facility: Delta Borough Water System, Peach Bottom Township, York
County, Pa. Application for groundwater withdrawal of up to 0.064 mgd
(30-day average) from Well 7.
12. Project Sponsor and Facility: Equipment Transport, LLC (Pine
Creek), Gaines Township, Tioga County, Pa. Application for surface
water withdrawal of up to 0.467 mgd (peak day).
13. Project Sponsor and Facility: Equipment Transport, LLC
(Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 0.999 mgd (peak day).
14. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, Pa. Application for consumptive water
use of up to 0.900 mgd (peak day).
15. Project Sponsor and Facility: LDG Innovation, LLC (Tioga
River), Lawrenceville Borough, Tioga County, Pa. Modification to low
flow protection requirements of the surface water withdrawal approval
(Docket No. 20100311).
16. Project Sponsor and Facility: Municipal Authority of the
Borough of Mansfield, Richmond Township, Tioga County, Pa. Application
for groundwater withdrawal of up to 0.079 mgd (30-day average) from
Well 3, and authorization for interconnection with Mansfield University
as a supplemental source.
17. Project Sponsor and Facility: Martinsburg Municipal Authority,
North Woodbury Township, Blair County, Pa. Application for groundwater
withdrawal of up to 0.288 mgd (30-day average) from Wineland Well RW-1.
[[Page 24786]]
18. Project Sponsor and Facility: Navitus, LLC (North Spring, Logan
Branch Watershed), Spring Township, Centre County, Pa. Application for
surface water withdrawal of up to 1.440 mgd (peak day).
19. Project Sponsor: New Morgan Landfill Company, Inc. Project
Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa.
Application for groundwater withdrawal of up to 0.007 mgd (30-day
average) from Well SW-4.
20. Project Sponsor: New Oxford Municipal Authority. Project
Facility: Oxen Country Meadows, Oxford Township, Adams County, Pa.
Application for groundwater withdrawal of up to 0.144 mgd (30-day
average) from Oxen Country Meadows (OCM) Well 1.
21. Project Sponsor and Facility: Somerset Regional Water
Resources, LLC (Salt Lick Creek), New Milford Township, Susquehanna
County, Pa. Modification to project features of the surface water
withdrawal approval (Docket No. 20100905).
22. Project Sponsor and Facility: Southwestern Energy Production
Company (Middle Lake), New Milford Township, Susquehanna County, Pa.
Modification to low flow protection requirements of the surface water
withdrawal approval (Docket No. 20121223).
23. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, Pa. Application for
renewal of groundwater withdrawal of up to 0.432 mgd (30-day average)
from Well 41 (Docket No. 19820501).
24. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, Pa. Application for
renewal of groundwater withdrawal of up to 1.440 mgd (30-day average)
from Well 43 (Docket No. 19820501).
25. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, Pa. Application for
renewal of groundwater withdrawal of up to 1.720 mgd (30-day average)
from Well 53 (Docket No. 19820501).
26. Project Sponsor: SWEPI LP (Tioga River), Richmond Township,
Tioga County, Pa. Application for renewal of surface water withdrawal
with modification to increase by an additional 0.843 mgd (peak day),
for a total of 0.950 mgd (peak day) (Docket No. 20090612).
27. Project Sponsor and Facility: WPX Energy Appalachia, LLC
(Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 1.000 mgd
(peak day) (Docket No. 20090303).
28. Project Sponsor and Facility: York County Solid Waste and
Refuse Authority, Hopewell Township, York County, Pa. Modification to
metering requirements of the groundwater withdrawal approval (Docket
No. 20121226).
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR
parts 806-808.
Dated: April 19, 2013.
Paul O. Swartz,
Executive Director.
[FR Doc. 2013-09887 Filed 4-25-13; 8:45 am]
BILLING CODE 7040-01-P