Public Hearing, 24785-24786 [2013-09887]

Download as PDF Federal Register / Vol. 78, No. 81 / Friday, April 26, 2013 / Notices SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on May 23, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for June 20, 2013, which will be noticed separately. The Commission will also hear testimony on amending its Regulatory Program Fee Schedule. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects and other items. The deadline for the submission of written comments is June 3, 2013. DATES: The public hearing will convene on May 23, 2013, at 2:30 p.m. The public hearing will end at 5:00 p.m. or at the conclusion of public testimony, whichever is sooner. The deadline for the submission of written comments is June 3, 2013. ADDRESSES: The public hearing will be conducted at the Pennsylvania State Capitol, Room 8E–B, East Wing, Commonwealth Avenue, Harrisburg, Pa. FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, telephone: (717) 238–0423, ext. 306; fax: (717) 238–2436. Information concerning the applications for these projects is available at the SRBC Water Resource Portal at www.srbc.net/wrp. Materials and supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/pubinfo/docs/ 2009-02%20Access%20to%20 Records%20Policy%209-10-09.PDF. erowe on DSK2VPTVN1PROD with NOTICES SUMMARY: Opportunity To Appear and Comment Interested parties may appear at the hearing to offer comments to the Commission on any project listed below. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Ground rules will be posted on the Commission’s Web site, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such rules at the hearing. Written comments on any project listed VerDate Mar<15>2010 14:46 Apr 25, 2013 Jkt 229001 below may also be mailed to Mr. Richard Cairo, General Counsel, Susquehanna River Basin Commission, 1721 North Front Street, Harrisburg, Pa. 17102–2391, or submitted electronically through https://www.srbc.net/pubinfo/ publicparticipation.htm. Comments mailed or electronically submitted must be received by the Commission on or before June 3, 2013, to be considered. SUPPLEMENTARY INFORMATION: The public hearing will cover amendment to its Regulatory Program Fee Schedule. Each June before the start of the next fiscal year on July 1, the Commission considers amendments to fee schedules. The public hearing will also cover the following projects: Project Scheduled for Rescission Action 1. Project Sponsor and Facility: Chevron Appalachia, LLC (Chest Creek), Chest Township, Clearfield County, Pa. (Docket No. 20100603). Projects Scheduled for Action 1. Project Sponsor and Facility: Aqua Infrastructure, LLC (Clearfield Creek), Boggs Township, Clearfield County, Pa. Application for renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20081202). 2. Project Sponsor and Facility: Aqua Infrastructure, LLC (Tioga River), Hamilton Township, Tioga County, Pa. Application for surface water withdrawal of up to 2.500 mgd (peak day). 3. Project Sponsor and Facility: Michael and Sandra Buhler (Bennett Branch Sinnemahoning Creek), Huston Township, Clearfield County, Pa. Application for surface water withdrawal of up to 1.000 mgd (peak day). 4. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Susquehanna River), Athens Township, Bradford County, Pa. Application for renewal of surface water withdrawal of up to 1.440 mgd (peak day) (Docket No. 20080906). 5. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, Town of Columbus, Chenango County, N.Y. Application for groundwater withdrawal of up to 0.720 mgd (30-day average) from Well 1. 6. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, Town of Columbus, Chenango County, N.Y. Application for groundwater withdrawal of up to 0.720 mgd (30-day average) from Well 2. 7. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, Town of Columbus, Chenango County, N.Y. Application for groundwater PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 24785 withdrawal of up to 0.720 mgd (30-day average) from Well 3. 8. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, Town of Columbus, Chenango County, N.Y. Application for consumptive water use of up to 0.283 mgd (peak day). 9. Project Sponsor: Delta Borough Municipal Authority. Project Facility: Delta Borough Water System, Peach Bottom Township, York County, Pa. Application for groundwater withdrawal of up to 0.073 mgd (30-day average) from Well 5. 10. Project Sponsor: Delta Borough Municipal Authority. Project Facility: Delta Borough Water System, Peach Bottom Township, York County, Pa. Application for groundwater withdrawal of up to 0.043 mgd (30-day average) from Well 6. 11. Project Sponsor: Delta Borough Municipal Authority. Project Facility: Delta Borough Water System, Peach Bottom Township, York County, Pa. Application for groundwater withdrawal of up to 0.064 mgd (30-day average) from Well 7. 12. Project Sponsor and Facility: Equipment Transport, LLC (Pine Creek), Gaines Township, Tioga County, Pa. Application for surface water withdrawal of up to 0.467 mgd (peak day). 13. Project Sponsor and Facility: Equipment Transport, LLC (Susquehanna River), Great Bend Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 0.999 mgd (peak day). 14. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Application for consumptive water use of up to 0.900 mgd (peak day). 15. Project Sponsor and Facility: LDG Innovation, LLC (Tioga River), Lawrenceville Borough, Tioga County, Pa. Modification to low flow protection requirements of the surface water withdrawal approval (Docket No. 20100311). 16. Project Sponsor and Facility: Municipal Authority of the Borough of Mansfield, Richmond Township, Tioga County, Pa. Application for groundwater withdrawal of up to 0.079 mgd (30-day average) from Well 3, and authorization for interconnection with Mansfield University as a supplemental source. 17. Project Sponsor and Facility: Martinsburg Municipal Authority, North Woodbury Township, Blair County, Pa. Application for groundwater withdrawal of up to 0.288 mgd (30-day average) from Wineland Well RW–1. E:\FR\FM\26APN1.SGM 26APN1 erowe on DSK2VPTVN1PROD with NOTICES 24786 Federal Register / Vol. 78, No. 81 / Friday, April 26, 2013 / Notices 18. Project Sponsor and Facility: Navitus, LLC (North Spring, Logan Branch Watershed), Spring Township, Centre County, Pa. Application for surface water withdrawal of up to 1.440 mgd (peak day). 19. Project Sponsor: New Morgan Landfill Company, Inc. Project Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa. Application for groundwater withdrawal of up to 0.007 mgd (30-day average) from Well SW–4. 20. Project Sponsor: New Oxford Municipal Authority. Project Facility: Oxen Country Meadows, Oxford Township, Adams County, Pa. Application for groundwater withdrawal of up to 0.144 mgd (30-day average) from Oxen Country Meadows (OCM) Well 1. 21. Project Sponsor and Facility: Somerset Regional Water Resources, LLC (Salt Lick Creek), New Milford Township, Susquehanna County, Pa. Modification to project features of the surface water withdrawal approval (Docket No. 20100905). 22. Project Sponsor and Facility: Southwestern Energy Production Company (Middle Lake), New Milford Township, Susquehanna County, Pa. Modification to low flow protection requirements of the surface water withdrawal approval (Docket No. 20121223). 23. Project Sponsor and Facility: State College Borough Water Authority, Ferguson Township, Centre County, Pa. Application for renewal of groundwater withdrawal of up to 0.432 mgd (30-day average) from Well 41 (Docket No. 19820501). 24. Project Sponsor and Facility: State College Borough Water Authority, Ferguson Township, Centre County, Pa. Application for renewal of groundwater withdrawal of up to 1.440 mgd (30-day average) from Well 43 (Docket No. 19820501). 25. Project Sponsor and Facility: State College Borough Water Authority, Ferguson Township, Centre County, Pa. Application for renewal of groundwater withdrawal of up to 1.720 mgd (30-day average) from Well 53 (Docket No. 19820501). 26. Project Sponsor: SWEPI LP (Tioga River), Richmond Township, Tioga County, Pa. Application for renewal of surface water withdrawal with modification to increase by an additional 0.843 mgd (peak day), for a total of 0.950 mgd (peak day) (Docket No. 20090612). 27. Project Sponsor and Facility: WPX Energy Appalachia, LLC (Susquehanna River), Great Bend Township, Susquehanna County, Pa. Application VerDate Mar<15>2010 17:39 Apr 25, 2013 Jkt 229001 for renewal of surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 20090303). 28. Project Sponsor and Facility: York County Solid Waste and Refuse Authority, Hopewell Township, York County, Pa. Modification to metering requirements of the groundwater withdrawal approval (Docket No. 20121226). Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806–808. Dated: April 19, 2013. Paul O. Swartz, Executive Director. [FR Doc. 2013–09887 Filed 4–25–13; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Office of the Secretary of Transportation [Docket No. DOT–OST–2013–XXXX] Notice of Funding Availability for the Department of Transportation’s National Infrastructure Investments Under the Consolidated and Further Continuing Appropriations Act, 2013 Office of the Secretary of Transportation, DOT. ACTION: Notice of Funding Availability. AGENCY: This notice announces the availability of funding and requests proposals for the Department of Transportation’s National Infrastructure Investments. This notice is addressed to organizations that are interested in applying and provides guidance on selection criteria and application requirements for the National Infrastructure Investments. Title VIII of The Further Continuing Appropriations Act, 2013 (Division F of the Consolidated and Further Continuing Appropriations Act, 2013, Public Law 113–6, March 26, 2013) (‘‘FY 2013 Appropriations Act’’) appropriated $473.847 million to be awarded by the Department of Transportation (‘‘DOT’’) for National Infrastructure Investments. DOT will continue to refer to the program as ‘‘TIGER Discretionary Grants,’’ as this is the title with which most stakeholders are familiar. As with previous rounds of TIGER, funds for the FY 2013 TIGER program are to be awarded on a competitive basis for projects that will have a significant impact on the Nation, a metropolitan area or a region. Through this notice, DOT is soliciting applications for TIGER Discretionary Grants. In the event that this solicitation does not result in the award and SUMMARY: PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 obligation of all available funds, DOT may decide to publish an additional solicitation(s) or provide additional funds to selected projects. DATES: You must submit final applications through Grants.gov by June 3, 2013, at 5:00 p.m. EDT (the ‘‘Application Deadline’’). The Grants.gov ‘‘Apply’’ function will open on April 29, 2013, allowing applicants to submit final applications. You are strongly encouraged to submit applications in advance of the deadline. ADDRESSES: You must submit applications electronically through Grants.gov. Only applications received electronically through Grants.gov will be deemed properly filed. Instructions for submitting applications through Grants.gov can be found on the TIGER Web site (www.dot.gov/TIGER). FOR FURTHER INFORMATION CONTACT: For further information concerning this notice please contact the TIGER Discretionary Grant program staff via email at TIGERGrants@dot.gov, or call Howard Hill at 202–366–0301. A TDD is available for individuals who are deaf or hard of hearing at 202–366–3993. In addition, DOT will regularly post answers to questions and requests for clarifications on DOT’s Web site at www.dot.gov/TIGER. Applicants are encouraged to contact DOT directly rather than rely on third parties to prepare application materials or otherwise receive information about TIGER Discretionary Grants. SUPPLEMENTARY INFORMATION: This notice is substantially similar to the final notice published for the FY 2012 TIGER Discretionary Grant program in the Federal Register on January 31, 2012. However, there are a few significant differences: 1. Given the date of enactment of the final year-long FY 2013 Appropriations Act, the statutory timeframe for DOT to obligate funds under this round of TIGER Discretionary Grants is the shortest of all of the rounds to date. In order to meet this deadline, your application must demonstrate that that the project can meet all local, State, and federal requirements by June 30, 2014, in order for DOT to obligate funding in advance of September 30, 2014. Each application must include a detailed statement of work, detailed project schedule, and detailed project budget. Due to the short timeframe for obligation, project readiness and the risk of delays will be treated as primary selection criteria in DOT’s evaluation process. You must identify risks and mitigation strategies in your project narratives. If your application is submitted without a sufficiently E:\FR\FM\26APN1.SGM 26APN1

Agencies

[Federal Register Volume 78, Number 81 (Friday, April 26, 2013)]
[Notices]
[Pages 24785-24786]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09887]



[[Page 24785]]

-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on May 23, 2013, in Harrisburg, Pennsylvania. At this public 
hearing, the Commission will hear testimony on the projects listed in 
the Supplementary Information section of this notice. Such projects are 
intended to be scheduled for Commission action at its next business 
meeting, tentatively scheduled for June 20, 2013, which will be noticed 
separately. The Commission will also hear testimony on amending its 
Regulatory Program Fee Schedule. The public should take note that this 
public hearing will be the only opportunity to offer oral comment to 
the Commission for the listed projects and other items. The deadline 
for the submission of written comments is June 3, 2013.

DATES: The public hearing will convene on May 23, 2013, at 2:30 p.m. 
The public hearing will end at 5:00 p.m. or at the conclusion of public 
testimony, whichever is sooner. The deadline for the submission of 
written comments is June 3, 2013.

ADDRESSES: The public hearing will be conducted at the Pennsylvania 
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg, 
Pa.

FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, 
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436.
    Information concerning the applications for these projects is 
available at the SRBC Water Resource Portal at www.srbc.net/wrp. 
Materials and supporting documents are available to inspect and copy in 
accordance with the Commission's Access to Records Policy at 
www.srbc.net/pubinfo/docs/2009-02%20Access%20to%20Records%20Policy%209-10-09.PDF.

Opportunity To Appear and Comment

    Interested parties may appear at the hearing to offer comments to 
the Commission on any project listed below. The presiding officer 
reserves the right to limit oral statements in the interest of time and 
to otherwise control the course of the hearing. Ground rules will be 
posted on the Commission's Web site, www.srbc.net, prior to the hearing 
for review. The presiding officer reserves the right to modify or 
supplement such rules at the hearing. Written comments on any project 
listed below may also be mailed to Mr. Richard Cairo, General Counsel, 
Susquehanna River Basin Commission, 1721 North Front Street, 
Harrisburg, Pa. 17102-2391, or submitted electronically through https://www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or 
electronically submitted must be received by the Commission on or 
before June 3, 2013, to be considered.

SUPPLEMENTARY INFORMATION: The public hearing will cover amendment to 
its Regulatory Program Fee Schedule. Each June before the start of the 
next fiscal year on July 1, the Commission considers amendments to fee 
schedules. The public hearing will also cover the following projects:

Project Scheduled for Rescission Action

    1. Project Sponsor and Facility: Chevron Appalachia, LLC (Chest 
Creek), Chest Township, Clearfield County, Pa. (Docket No. 20100603).

Projects Scheduled for Action

    1. Project Sponsor and Facility: Aqua Infrastructure, LLC 
(Clearfield Creek), Boggs Township, Clearfield County, Pa. Application 
for renewal of surface water withdrawal of up to 2.000 mgd (peak day) 
(Docket No. 20081202).
    2. Project Sponsor and Facility: Aqua Infrastructure, LLC (Tioga 
River), Hamilton Township, Tioga County, Pa. Application for surface 
water withdrawal of up to 2.500 mgd (peak day).
    3. Project Sponsor and Facility: Michael and Sandra Buhler (Bennett 
Branch Sinnemahoning Creek), Huston Township, Clearfield County, Pa. 
Application for surface water withdrawal of up to 1.000 mgd (peak day).
    4. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Susquehanna River), Athens Township, Bradford County, Pa. Application 
for renewal of surface water withdrawal of up to 1.440 mgd (peak day) 
(Docket No. 20080906).
    5. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, 
Town of Columbus, Chenango County, N.Y. Application for groundwater 
withdrawal of up to 0.720 mgd (30-day average) from Well 1.
    6. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, 
Town of Columbus, Chenango County, N.Y. Application for groundwater 
withdrawal of up to 0.720 mgd (30-day average) from Well 2.
    7. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, 
Town of Columbus, Chenango County, N.Y. Application for groundwater 
withdrawal of up to 0.720 mgd (30-day average) from Well 3.
    8. Project Sponsor: Chobani, Inc. Project Facility: South Edmeston, 
Town of Columbus, Chenango County, N.Y. Application for consumptive 
water use of up to 0.283 mgd (peak day).
    9. Project Sponsor: Delta Borough Municipal Authority. Project 
Facility: Delta Borough Water System, Peach Bottom Township, York 
County, Pa. Application for groundwater withdrawal of up to 0.073 mgd 
(30-day average) from Well 5.
    10. Project Sponsor: Delta Borough Municipal Authority. Project 
Facility: Delta Borough Water System, Peach Bottom Township, York 
County, Pa. Application for groundwater withdrawal of up to 0.043 mgd 
(30-day average) from Well 6.
    11. Project Sponsor: Delta Borough Municipal Authority. Project 
Facility: Delta Borough Water System, Peach Bottom Township, York 
County, Pa. Application for groundwater withdrawal of up to 0.064 mgd 
(30-day average) from Well 7.
    12. Project Sponsor and Facility: Equipment Transport, LLC (Pine 
Creek), Gaines Township, Tioga County, Pa. Application for surface 
water withdrawal of up to 0.467 mgd (peak day).
    13. Project Sponsor and Facility: Equipment Transport, LLC 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 0.999 mgd (peak day).
    14. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Application for consumptive water 
use of up to 0.900 mgd (peak day).
    15. Project Sponsor and Facility: LDG Innovation, LLC (Tioga 
River), Lawrenceville Borough, Tioga County, Pa. Modification to low 
flow protection requirements of the surface water withdrawal approval 
(Docket No. 20100311).
    16. Project Sponsor and Facility: Municipal Authority of the 
Borough of Mansfield, Richmond Township, Tioga County, Pa. Application 
for groundwater withdrawal of up to 0.079 mgd (30-day average) from 
Well 3, and authorization for interconnection with Mansfield University 
as a supplemental source.
    17. Project Sponsor and Facility: Martinsburg Municipal Authority, 
North Woodbury Township, Blair County, Pa. Application for groundwater 
withdrawal of up to 0.288 mgd (30-day average) from Wineland Well RW-1.

[[Page 24786]]

    18. Project Sponsor and Facility: Navitus, LLC (North Spring, Logan 
Branch Watershed), Spring Township, Centre County, Pa. Application for 
surface water withdrawal of up to 1.440 mgd (peak day).
    19. Project Sponsor: New Morgan Landfill Company, Inc. Project 
Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa. 
Application for groundwater withdrawal of up to 0.007 mgd (30-day 
average) from Well SW-4.
    20. Project Sponsor: New Oxford Municipal Authority. Project 
Facility: Oxen Country Meadows, Oxford Township, Adams County, Pa. 
Application for groundwater withdrawal of up to 0.144 mgd (30-day 
average) from Oxen Country Meadows (OCM) Well 1.
    21. Project Sponsor and Facility: Somerset Regional Water 
Resources, LLC (Salt Lick Creek), New Milford Township, Susquehanna 
County, Pa. Modification to project features of the surface water 
withdrawal approval (Docket No. 20100905).
    22. Project Sponsor and Facility: Southwestern Energy Production 
Company (Middle Lake), New Milford Township, Susquehanna County, Pa. 
Modification to low flow protection requirements of the surface water 
withdrawal approval (Docket No. 20121223).
    23. Project Sponsor and Facility: State College Borough Water 
Authority, Ferguson Township, Centre County, Pa. Application for 
renewal of groundwater withdrawal of up to 0.432 mgd (30-day average) 
from Well 41 (Docket No. 19820501).
    24. Project Sponsor and Facility: State College Borough Water 
Authority, Ferguson Township, Centre County, Pa. Application for 
renewal of groundwater withdrawal of up to 1.440 mgd (30-day average) 
from Well 43 (Docket No. 19820501).
    25. Project Sponsor and Facility: State College Borough Water 
Authority, Ferguson Township, Centre County, Pa. Application for 
renewal of groundwater withdrawal of up to 1.720 mgd (30-day average) 
from Well 53 (Docket No. 19820501).
    26. Project Sponsor: SWEPI LP (Tioga River), Richmond Township, 
Tioga County, Pa. Application for renewal of surface water withdrawal 
with modification to increase by an additional 0.843 mgd (peak day), 
for a total of 0.950 mgd (peak day) (Docket No. 20090612).
    27. Project Sponsor and Facility: WPX Energy Appalachia, LLC 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 1.000 mgd 
(peak day) (Docket No. 20090303).
    28. Project Sponsor and Facility: York County Solid Waste and 
Refuse Authority, Hopewell Township, York County, Pa. Modification to 
metering requirements of the groundwater withdrawal approval (Docket 
No. 20121226).

    Authority:  Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR 
parts 806-808.

    Dated: April 19, 2013.
Paul O. Swartz,
Executive Director.
[FR Doc. 2013-09887 Filed 4-25-13; 8:45 am]
BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.