Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 79 / Wednesday, April 24, 2013 / Notices replacement of the portions of existing Lines 1–B–1 and 1–B–2 underlying the Schuylkill River in Montgomery County, Pennsylvania. Texas Eastern proposes to perform these activities under its blanket certificate issued in Docket No. CP82–535–000 [21 FERC ¶ 62,199 (1982)], all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Berk Donaldson, Director, Rates & Certificates, Texas Eastern Transmission, LP, P.O. Box 1642, Houston, Texas, 77251–1642, or by calling (713) 627–4488 (telephone) or (713) 627–5947 (fax), bdonaldson@spectraenergy.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: April 17, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–09610 Filed 4–23–13; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 18:05 Apr 23, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection, L.L.C. (PJM), Independent System Operator New England, Inc. (ISO–NE), and New York Independent System Operator, Inc. (NYISO): Inter-Regional Planning Stakeholder Advisory Committee—New York/New England April 24, 2013, 8:00 a.m.—10:00 a.m., Local Time The above-referenced meeting will be held over conference call. The above-referenced meeting is open to stakeholders. Further information may be found at www.pjm.com/committees-and-groups/ stakeholder-meetings/stakeholdergroups/ipsac-ny-ne.aspx. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER08–1281, New York Independent System Operator, Inc. Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. ER10–253 and EL10–14, Primary Power, L.L.C. Docket No. EL12–69, Primary Power LLC v. PJM Interconnection, L.L.C. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1178, PJM Interconnection, L.L.C. Docket No. ER13–90, Public Service Electric and Gas Company and PJM Interconnection, L.L.C. Docket No. ER13–102–000, New York Independent System Operator, Inc. Docket No. ER13–193–000, ISO New England Inc. Docket No. ER13–195, Indicated PJM Transmission Owners Docket No. ER13–196–000, ISO New England Inc. Docket No. ER13–198, PJM Interconnection, L.L.C. Docket No. ER13–397, PJM Interconnection, L.L.C. Docket No. ER13–673, PJM Interconnection, L.L.C. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 24193 Docket No. ER13–703, PJM Interconnection, L.L.C. Docket No. ER13–887, PJM Interconnection, L.L.C. Docket No. ER13–1052, PJM Interconnection, L.L.C. and the Midwest Independent Transmission System Operator, Inc. Docket No. ER13–1054, PJM Interconnection, L.L.C. and the Midwest Independent Transmission System Operator, Inc. For more information, contact Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6604 or jonathan.fernandez@ferc.gov. Dated: April 17, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–09613 Filed 4–23–13; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2012–0695; FRL–9530–4] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Site Remediation (Renewal), EPA ICR Number 2062.05 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost. DATES: Additional comments may be submitted on or before May 24, 2013. ADDRESSES: Submit your comments, referencing docket ID number EPA–HQ– OECA–2012–0695, to: (1) EPA online, using www.regulations.gov (our preferred method), or by email to: docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 28221T, 1200 Pennsylvania Avenue NW., Washington, DC 20460; and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget SUMMARY: E:\FR\FM\24APN1.SGM 24APN1 24194 Federal Register / Vol. 78, No. 79 / Wednesday, April 24, 2013 / Notices (OMB), Attention: Desk Officer for EPA, 725 17th Street NW., Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Avenue NW., Washington, DC 20460; telephone number: (202) 564–4113; fax number: (202) 564–0050; email address: williams.learia@epa.gov. EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On October 17, 2012 (77 FR 63813), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional comments on this ICR should be submitted to both EPA and OMB within 30 days of this notice. EPA has established a public docket for this ICR under docket ID number EPA–HQ–OECA–2012–0695, which is available for either public viewing online at https://www.regulations.gov, or in person viewing at the Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566–1744, and the telephone number for the Enforcement and Compliance Docket is (202) 566–1752. Use EPA’s electronic docket and comment system at https:// www.regulations.gov to either submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the docket that are available electronically. Once in the system, select ‘‘docket search,’’ then key in the docket ID number identified above. Please note that EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing at https://www.regulations.gov as EPA receives them and without change, unless the comment contains copyrighted material, Confidentiality of Business Information (CBI), or other information whose public disclosure is restricted by statute. For further information about the electronic docket, go to www.regulations.gov. Title: NESHAP for Site Remediation (Renewal). tkelley on DSK3SPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: VerDate Mar<15>2010 18:05 Apr 23, 2013 Jkt 229001 ICR Numbers: EPA ICR Number 2062.05, OMB Control Number 2060– 0534. ICR Status: This ICR is scheduled to expire on June 30, 2013. Under OMB regulations, the Agency may continue to either conduct or sponsor the collection of information while this submission is pending at OMB. Abstract: The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart GGGGG. Owners or operators of the affected facilities must submit an initial notification report, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports are required semiannually at a minimum. Burden Statement: The annual public reporting and recordkeeping burden for this collection of information is estimated to average 245 hours per response. ‘‘Burden’’ means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements which have subsequently changed; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. Respondents/Affected Entities: Owners or operator of site remediation facilities. Estimated Number of Respondents: 286. Frequency of Response: Initially, occasionally, and semiannually. Estimated Total Annual Hour Burden: 140,338. Estimated Total Annual Cost: $14,302,488, which includes $13,720,488 in labor costs, no capital/ startup costs, and $582,000 in operation and maintenance (O&M) costs. Changes in the Estimates: There is an adjustment increase in labor hours and costs from the most recent ICR. This is PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 not due to any program changes. The increase in labor hours is due to a change in the burden calculation methodology. The previous ICR did not account for managerial and clerical hours for some burden activities. This ICR assumes that managerial and clerical hours are 5 percent and 10 percent of technical hours for each burden activity, respectively. The increase in costs is due to an increase in labor rates, as well as the methodology change described above. John Moses, Director, Collection Strategies Division. [FR Doc. 2013–09677 Filed 4–23–13; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–RCRA–2012–0890; FRL -9530–5] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; Solid Waste Disposal Facility Criteria (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency has submitted an information collection request (ICR), Solid Waste Disposal Facility Criteria (Renewal) (EPA ICR No. 1381.10, OMB Control No. 2050–0122) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through June 30, 2013. Public comments were previously requested via the Federal Register 78 FR 718 on January 4, 2013 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before May 24, 2013. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–RCRA–2012–0890, to (1) EPA online using www.regulations.gov (our preferred method), by email to rcradocket@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, SUMMARY: E:\FR\FM\24APN1.SGM 24APN1

Agencies

[Federal Register Volume 78, Number 79 (Wednesday, April 24, 2013)]
[Notices]
[Pages 24193-24194]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09677]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2012-0695; FRL-9530-4]


Agency Information Collection Activities; Submission to OMB for 
Review and Approval; Comment Request; NESHAP for Site Remediation 
(Renewal), EPA ICR Number 2062.05

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 
et seq.), this document announces that an Information Collection 
Request (ICR) has been forwarded to the Office of Management and Budget 
(OMB) for review and approval. This is a request to renew an existing 
approved collection. The ICR which is abstracted below describes the 
nature of the collection and the estimated burden and cost.

DATES: Additional comments may be submitted on or before May 24, 2013.

ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2012-0695, to: (1) EPA online, using www.regulations.gov (our 
preferred method), or by email to: docket.oeca@epa.gov, or by mail to: 
EPA Docket Center (EPA/DC), Environmental Protection Agency, 
Enforcement and Compliance Docket and Information Center, mail code 
28221T, 1200 Pennsylvania Avenue NW., Washington, DC 20460; and (2) OMB 
at: Office of Information and Regulatory Affairs, Office of Management 
and Budget

[[Page 24194]]

(OMB), Attention: Desk Officer for EPA, 725 17th Street NW., 
Washington, DC 20503.

FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Avenue 
NW., Washington, DC 20460; telephone number: (202) 564-4113; fax 
number: (202) 564-0050; email address: williams.learia@epa.gov.

SUPPLEMENTARY INFORMATION:  EPA has submitted the following ICR to OMB 
for review and approval according to the procedures prescribed in 5 CFR 
1320.12. On October 17, 2012 (77 FR 63813), EPA sought comments on this 
ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any 
additional comments on this ICR should be submitted to both EPA and OMB 
within 30 days of this notice.
    EPA has established a public docket for this ICR under docket ID 
number EPA-HQ-OECA-2012-0695, which is available for either public 
viewing online at https://www.regulations.gov, or in person viewing at 
the Enforcement and Compliance Docket in the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301 Constitution Avenue NW., Washington, DC. 
The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 
4:30 p.m., Monday through Friday, excluding legal holidays. The 
telephone number for the Reading Room is (202) 566-1744, and the 
telephone number for the Enforcement and Compliance Docket is (202) 
566-1752.
    Use EPA's electronic docket and comment system at https://www.regulations.gov to either submit or view public comments, access 
the index listing of the contents of the docket, and to access those 
documents in the docket that are available electronically. Once in the 
system, select ``docket search,'' then key in the docket ID number 
identified above. Please note that EPA's policy is that public 
comments, whether submitted electronically or in paper, will be made 
available for public viewing at https://www.regulations.gov as EPA 
receives them and without change, unless the comment contains 
copyrighted material, Confidentiality of Business Information (CBI), or 
other information whose public disclosure is restricted by statute. For 
further information about the electronic docket, go to 
www.regulations.gov.
    Title: NESHAP for Site Remediation (Renewal).
    ICR Numbers: EPA ICR Number 2062.05, OMB Control Number 2060-0534.
    ICR Status: This ICR is scheduled to expire on June 30, 2013. Under 
OMB regulations, the Agency may continue to either conduct or sponsor 
the collection of information while this submission is pending at OMB.
    Abstract: The affected entities are subject to the General 
Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, 
or additions to the Provisions specified at 40 CFR part 63, subpart 
GGGGG.
    Owners or operators of the affected facilities must submit an 
initial notification report, performance tests, and periodic reports 
and results. Owners or operators are also required to maintain records 
of the occurrence and duration of any startup, shutdown, or malfunction 
in the operation of an affected facility, or any period during which 
the monitoring system is inoperative. Reports are required semiannually 
at a minimum.
    Burden Statement: The annual public reporting and recordkeeping 
burden for this collection of information is estimated to average 245 
hours per response. ``Burden'' means the total time, effort, or 
financial resources expended by persons to generate, maintain, retain, 
or disclose or provide information to or for a Federal agency. This 
includes the time needed to review instructions; develop, acquire, 
install, and utilize technology and systems for the purposes of 
collecting, validating, and verifying information, processing and 
maintaining information, and disclosing and providing information; 
adjust the existing ways to comply with any previously applicable 
instructions and requirements which have subsequently changed; train 
personnel to be able to respond to a collection of information; search 
data sources; complete and review the collection of information; and 
transmit or otherwise disclose the information.
    Respondents/Affected Entities: Owners or operator of site 
remediation facilities.
    Estimated Number of Respondents: 286.
    Frequency of Response: Initially, occasionally, and semiannually.
    Estimated Total Annual Hour Burden: 140,338.
    Estimated Total Annual Cost: $14,302,488, which includes 
$13,720,488 in labor costs, no capital/startup costs, and $582,000 in 
operation and maintenance (O&M) costs.
    Changes in the Estimates: There is an adjustment increase in labor 
hours and costs from the most recent ICR. This is not due to any 
program changes. The increase in labor hours is due to a change in the 
burden calculation methodology. The previous ICR did not account for 
managerial and clerical hours for some burden activities. This ICR 
assumes that managerial and clerical hours are 5 percent and 10 percent 
of technical hours for each burden activity, respectively. The increase 
in costs is due to an increase in labor rates, as well as the 
methodology change described above.

John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013-09677 Filed 4-23-13; 8:45 am]