Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Site Remediation (Renewal), EPA ICR Number 2062.05, 24193-24194 [2013-09677]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 79 / Wednesday, April 24, 2013 / Notices
replacement of the portions of existing
Lines 1–B–1 and 1–B–2 underlying the
Schuylkill River in Montgomery
County, Pennsylvania. Texas Eastern
proposes to perform these activities
under its blanket certificate issued in
Docket No. CP82–535–000 [21 FERC ¶
62,199 (1982)], all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection.
The filing may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Berk
Donaldson, Director, Rates &
Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642,
Houston, Texas, 77251–1642, or by
calling (713) 627–4488 (telephone) or
(713) 627–5947 (fax),
bdonaldson@spectraenergy.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 14 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: April 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–09610 Filed 4–23–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:05 Apr 23, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following joint stakeholder meeting
related to the transmission planning
activities of PJM Interconnection, L.L.C.
(PJM), Independent System Operator
New England, Inc. (ISO–NE), and New
York Independent System Operator, Inc.
(NYISO):
Inter-Regional Planning Stakeholder
Advisory Committee—New York/New
England
April 24, 2013, 8:00 a.m.—10:00 a.m.,
Local Time
The above-referenced meeting will be
held over conference call.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.pjm.com/committees-and-groups/
stakeholder-meetings/stakeholdergroups/ipsac-ny-ne.aspx.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–102–000, New York
Independent System Operator, Inc.
Docket No. ER13–193–000, ISO New
England Inc.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–196–000, ISO New
England Inc.
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER13–397, PJM
Interconnection, L.L.C.
Docket No. ER13–673, PJM
Interconnection, L.L.C.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
24193
Docket No. ER13–703, PJM
Interconnection, L.L.C.
Docket No. ER13–887, PJM
Interconnection, L.L.C.
Docket No. ER13–1052, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER13–1054, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
For more information, contact
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: April 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–09613 Filed 4–23–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2012–0695; FRL–9530–4]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NESHAP for Site
Remediation (Renewal), EPA ICR
Number 2062.05
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before May 24, 2013.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2012–0695, to: (1) EPA online,
using www.regulations.gov (our
preferred method), or by email to:
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 28221T, 1200
Pennsylvania Avenue NW., Washington,
DC 20460; and (2) OMB at: Office of
Information and Regulatory Affairs,
Office of Management and Budget
SUMMARY:
E:\FR\FM\24APN1.SGM
24APN1
24194
Federal Register / Vol. 78, No. 79 / Wednesday, April 24, 2013 / Notices
(OMB), Attention: Desk Officer for EPA,
725 17th Street NW., Washington, DC
20503.
FOR FURTHER INFORMATION CONTACT:
Learia Williams, Monitoring,
Assistance, and Media Programs
Division, Office of Compliance, Mail
Code 2227A, Environmental Protection
Agency, 1200 Pennsylvania Avenue
NW., Washington, DC 20460; telephone
number: (202) 564–4113; fax number:
(202) 564–0050; email address:
williams.learia@epa.gov.
EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On October 17, 2012 (77 FR 63813), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments. Any additional comments on
this ICR should be submitted to both
EPA and OMB within 30 days of this
notice.
EPA has established a public docket
for this ICR under docket ID number
EPA–HQ–OECA–2012–0695, which is
available for either public viewing
online at https://www.regulations.gov, or
in person viewing at the Enforcement
and Compliance Docket in the EPA
Docket Center (EPA/DC), EPA West,
Room 3334, 1301 Constitution Avenue
NW., Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket is
(202) 566–1752.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov to either submit or
view public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov
as EPA receives them and without
change, unless the comment contains
copyrighted material, Confidentiality of
Business Information (CBI), or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: NESHAP for Site Remediation
(Renewal).
tkelley on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Mar<15>2010
18:05 Apr 23, 2013
Jkt 229001
ICR Numbers: EPA ICR Number
2062.05, OMB Control Number 2060–
0534.
ICR Status: This ICR is scheduled to
expire on June 30, 2013. Under OMB
regulations, the Agency may continue to
either conduct or sponsor the collection
of information while this submission is
pending at OMB.
Abstract: The affected entities are
subject to the General Provisions of the
NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the
Provisions specified at 40 CFR part 63,
subpart GGGGG.
Owners or operators of the affected
facilities must submit an initial
notification report, performance tests,
and periodic reports and results.
Owners or operators are also required to
maintain records of the occurrence and
duration of any startup, shutdown, or
malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. Reports are required
semiannually at a minimum.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 245 hours per
response. ‘‘Burden’’ means the total
time, effort, or financial resources
expended by persons to generate,
maintain, retain, or disclose or provide
information to or for a Federal agency.
This includes the time needed to review
instructions; develop, acquire, install,
and utilize technology and systems for
the purposes of collecting, validating,
and verifying information, processing
and maintaining information, and
disclosing and providing information;
adjust the existing ways to comply with
any previously applicable instructions
and requirements which have
subsequently changed; train personnel
to be able to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
Respondents/Affected Entities:
Owners or operator of site remediation
facilities.
Estimated Number of Respondents:
286.
Frequency of Response: Initially,
occasionally, and semiannually.
Estimated Total Annual Hour Burden:
140,338.
Estimated Total Annual Cost:
$14,302,488, which includes
$13,720,488 in labor costs, no capital/
startup costs, and $582,000 in operation
and maintenance (O&M) costs.
Changes in the Estimates: There is an
adjustment increase in labor hours and
costs from the most recent ICR. This is
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
not due to any program changes. The
increase in labor hours is due to a
change in the burden calculation
methodology. The previous ICR did not
account for managerial and clerical
hours for some burden activities. This
ICR assumes that managerial and
clerical hours are 5 percent and 10
percent of technical hours for each
burden activity, respectively. The
increase in costs is due to an increase
in labor rates, as well as the
methodology change described above.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013–09677 Filed 4–23–13; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–RCRA–2012–0890; FRL -9530–5]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; Solid
Waste Disposal Facility Criteria
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), Solid Waste
Disposal Facility Criteria (Renewal)
(EPA ICR No. 1381.10, OMB Control No.
2050–0122) to the Office of Management
and Budget (OMB) for review and
approval in accordance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.). This is a proposed
extension of the ICR, which is currently
approved through June 30, 2013. Public
comments were previously requested
via the Federal Register 78 FR 718 on
January 4, 2013 during a 60-day
comment period. This notice allows for
an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An Agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before May 24, 2013.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–RCRA–2012–0890, to (1) EPA
online using www.regulations.gov (our
preferred method), by email to rcradocket@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
SUMMARY:
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 78, Number 79 (Wednesday, April 24, 2013)]
[Notices]
[Pages 24193-24194]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09677]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2012-0695; FRL-9530-4]
Agency Information Collection Activities; Submission to OMB for
Review and Approval; Comment Request; NESHAP for Site Remediation
(Renewal), EPA ICR Number 2062.05
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this document announces that an Information Collection
Request (ICR) has been forwarded to the Office of Management and Budget
(OMB) for review and approval. This is a request to renew an existing
approved collection. The ICR which is abstracted below describes the
nature of the collection and the estimated burden and cost.
DATES: Additional comments may be submitted on or before May 24, 2013.
ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2012-0695, to: (1) EPA online, using www.regulations.gov (our
preferred method), or by email to: docket.oeca@epa.gov, or by mail to:
EPA Docket Center (EPA/DC), Environmental Protection Agency,
Enforcement and Compliance Docket and Information Center, mail code
28221T, 1200 Pennsylvania Avenue NW., Washington, DC 20460; and (2) OMB
at: Office of Information and Regulatory Affairs, Office of Management
and Budget
[[Page 24194]]
(OMB), Attention: Desk Officer for EPA, 725 17th Street NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, Mail
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Avenue
NW., Washington, DC 20460; telephone number: (202) 564-4113; fax
number: (202) 564-0050; email address: williams.learia@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB
for review and approval according to the procedures prescribed in 5 CFR
1320.12. On October 17, 2012 (77 FR 63813), EPA sought comments on this
ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any
additional comments on this ICR should be submitted to both EPA and OMB
within 30 days of this notice.
EPA has established a public docket for this ICR under docket ID
number EPA-HQ-OECA-2012-0695, which is available for either public
viewing online at https://www.regulations.gov, or in person viewing at
the Enforcement and Compliance Docket in the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301 Constitution Avenue NW., Washington, DC.
The EPA Docket Center Public Reading Room is open from 8:30 a.m. to
4:30 p.m., Monday through Friday, excluding legal holidays. The
telephone number for the Reading Room is (202) 566-1744, and the
telephone number for the Enforcement and Compliance Docket is (202)
566-1752.
Use EPA's electronic docket and comment system at https://www.regulations.gov to either submit or view public comments, access
the index listing of the contents of the docket, and to access those
documents in the docket that are available electronically. Once in the
system, select ``docket search,'' then key in the docket ID number
identified above. Please note that EPA's policy is that public
comments, whether submitted electronically or in paper, will be made
available for public viewing at https://www.regulations.gov as EPA
receives them and without change, unless the comment contains
copyrighted material, Confidentiality of Business Information (CBI), or
other information whose public disclosure is restricted by statute. For
further information about the electronic docket, go to
www.regulations.gov.
Title: NESHAP for Site Remediation (Renewal).
ICR Numbers: EPA ICR Number 2062.05, OMB Control Number 2060-0534.
ICR Status: This ICR is scheduled to expire on June 30, 2013. Under
OMB regulations, the Agency may continue to either conduct or sponsor
the collection of information while this submission is pending at OMB.
Abstract: The affected entities are subject to the General
Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes,
or additions to the Provisions specified at 40 CFR part 63, subpart
GGGGG.
Owners or operators of the affected facilities must submit an
initial notification report, performance tests, and periodic reports
and results. Owners or operators are also required to maintain records
of the occurrence and duration of any startup, shutdown, or malfunction
in the operation of an affected facility, or any period during which
the monitoring system is inoperative. Reports are required semiannually
at a minimum.
Burden Statement: The annual public reporting and recordkeeping
burden for this collection of information is estimated to average 245
hours per response. ``Burden'' means the total time, effort, or
financial resources expended by persons to generate, maintain, retain,
or disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire,
install, and utilize technology and systems for the purposes of
collecting, validating, and verifying information, processing and
maintaining information, and disclosing and providing information;
adjust the existing ways to comply with any previously applicable
instructions and requirements which have subsequently changed; train
personnel to be able to respond to a collection of information; search
data sources; complete and review the collection of information; and
transmit or otherwise disclose the information.
Respondents/Affected Entities: Owners or operator of site
remediation facilities.
Estimated Number of Respondents: 286.
Frequency of Response: Initially, occasionally, and semiannually.
Estimated Total Annual Hour Burden: 140,338.
Estimated Total Annual Cost: $14,302,488, which includes
$13,720,488 in labor costs, no capital/startup costs, and $582,000 in
operation and maintenance (O&M) costs.
Changes in the Estimates: There is an adjustment increase in labor
hours and costs from the most recent ICR. This is not due to any
program changes. The increase in labor hours is due to a change in the
burden calculation methodology. The previous ICR did not account for
managerial and clerical hours for some burden activities. This ICR
assumes that managerial and clerical hours are 5 percent and 10 percent
of technical hours for each burden activity, respectively. The increase
in costs is due to an increase in labor rates, as well as the
methodology change described above.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013-09677 Filed 4-23-13; 8:45 am]
BILLING CODE 6560-50-P