Drawbridge Operation Regulations; Newtown Creek, New York City, NY, 23846 [2013-09551]
Download as PDF
23846
Federal Register / Vol. 78, No. 78 / Tuesday, April 23, 2013 / Rules and Regulations
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC, 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
FOR FURTHER INFORMATION CONTACT:
The Smith
Point Bridge, mile 6.1, across Narrow
Bay, between Smith Point and Fire
Island, New York, has a vertical
clearance in the closed position of 16
feet at mean high water and 18 feet at
mean low water. The drawbridge
operation regulations are listed at 33
CFR 117.799.
The waterway users are recreational
vessels of various sizes.
The owner of the bridge, Suffolk
County Department of Public Works,
requested a temporary deviation from
the regulations to allow the bridge to
remain closed for two hours to facilitate
public safety during a public event, the
Smith Point Triathlon.
Under this temporary deviation the
Smith Point Bridge, mile 6.1, across
Narrow Bay between Smith Point and
Fire Island, will remain in the closed
position between 7 a.m. and 9 a.m. on
August 4, 2013.
Vessels that can pass under the bridge
in the closed position may do so at any
time. There are no alternate routes;
however, the bridge can open in an
emergency. Vessel operators will be
notified of the bridge closure through a
Safety Marine Information Broadcast
(SMIB) issued by the Coast Guard.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
tkelley on DSK3SPTVN1PROD with RULES
SUPPLEMENTARY INFORMATION:
Dated: April 10, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–09550 Filed 4–22–13; 8:45 am]
BILLING CODE 9110–04–P
VerDate Mar<15>2010
14:43 Apr 22, 2013
Jkt 229001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0229]
Drawbridge Operation Regulations;
Newtown Creek, New York City, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Greenpoint Avenue
Bridge across Newtown Creek, mile 1.3,
at New York City, New York. The
deviation is necessary to facilitate
bridge painting operations. Under this
temporary deviation, the bridge may
remain in the closed position for various
times up to six days at a time during a
four month period.
DATES: This deviation is effective from
May 1, 2013 through September 30,
2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0229] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Greenpoint Avenue Bridge has a vertical
clearance of 26 feet at mean high water
and 31 feet at mean low water in the
closed position. The existing
drawbridge operating regulations are
found at 33 CFR 117.801(g).
The bridge owner, New York City
Department of Transportation, requested
multiple six day closure periods
between May 1, 2013 and September 30,
2013, to facilitate bridge painting
operation at the Greenpoint Avenue
Bridge. Each six day closure period will
SUMMARY:
PO 00000
Frm 00018
Fmt 4700
Sfmt 4700
be followed with four days of normal
bridge operations. The exact time and
dates of each six day closure period will
be announced in the Local Notice to
Mariners and also with a Broadcast
Notice to Mariners at least two weeks in
advance of each closure period. This
temporary deviation will be in effect
from May 1, 2013 through September
30, 2013.
The waterway users are commercial
oil and barge vessels. The oil facilities
were all contacted and advised of the
closures and no objections were
received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated repair period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: April 10, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–09551 Filed 4–22–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0244]
Drawbridge Operation Regulations;
Saugatuck River, Westport, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 136 Bridge
across the Saugatuck River, mile 1.3, at
Westport, Connecticut. The deviation is
necessary to facilitate emergency
repairs. Under this temporary deviation,
the bridge owner requires a 24 hour
advance notice for bridge openings
through June 1, 2013.
DATES: This deviation is effective from
May 4, 2013 through June 1, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0244] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
SUMMARY:
E:\FR\FM\23APR1.SGM
23APR1
Agencies
[Federal Register Volume 78, Number 78 (Tuesday, April 23, 2013)]
[Rules and Regulations]
[Page 23846]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09551]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0229]
Drawbridge Operation Regulations; Newtown Creek, New York City,
NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Greenpoint Avenue Bridge across Newtown Creek, mile 1.3, at New York
City, New York. The deviation is necessary to facilitate bridge
painting operations. Under this temporary deviation, the bridge may
remain in the closed position for various times up to six days at a
time during a four month period.
DATES: This deviation is effective from May 1, 2013 through September
30, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0229] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Barbara
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Greenpoint Avenue Bridge has a vertical
clearance of 26 feet at mean high water and 31 feet at mean low water
in the closed position. The existing drawbridge operating regulations
are found at 33 CFR 117.801(g).
The bridge owner, New York City Department of Transportation,
requested multiple six day closure periods between May 1, 2013 and
September 30, 2013, to facilitate bridge painting operation at the
Greenpoint Avenue Bridge. Each six day closure period will be followed
with four days of normal bridge operations. The exact time and dates of
each six day closure period will be announced in the Local Notice to
Mariners and also with a Broadcast Notice to Mariners at least two
weeks in advance of each closure period. This temporary deviation will
be in effect from May 1, 2013 through September 30, 2013.
The waterway users are commercial oil and barge vessels. The oil
facilities were all contacted and advised of the closures and no
objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
repair period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 10, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-09551 Filed 4-22-13; 8:45 am]
BILLING CODE 9110-04-P