Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 22871-22872 [2013-09016]
Download as PDF
22871
Federal Register / Vol. 78, No. 74 / Wednesday, April 17, 2013 / Notices
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–09011 Filed 4–16–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 2004–289]
sroberts on DSK5SPTVN1PROD with NOTICES
The City of Holyoke Gas & Electric
Department; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2004–289.
c. Date Filed: March 4, 2013.
d. Applicant: The City of Holyoke Gas
& Electric Department (HG&E).
e. Name of Project: Holyoke
Hydroelectric Project.
f. Location: Connecticut River in
Hampden, Hampshire, and Franklin
Counties, Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Paul S.
Ducheney, Superintendent-Electric
Production, HG&E, 99 Suffolk Street,
Holyoke, MA 01040, (413) 536–9300.
i. FERC Contact: Ms. Mary Karwoski
at (202) 502–6543, or email:
mary.karwoski @ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
13, 2013.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
VerDate Mar<15>2010
16:50 Apr 16, 2013
Jkt 229001
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Please include the project
number (P–2004–289) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: HG&E
requests Commission approval to grant
a non-project use of project lands and
waters for the Holyoke Canal System,
located in the City of Holyoke, for the
testing of new technologies for
hydropower generation and to assess
potential environmental impacts
associated with those technologies.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2004) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–09017 Filed 4–16–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
Docket Nos.
Carson Cogeneration Company, LP ..........................
Delano Energy Center, LLC
Alpaugh 50, LLC .................
Alpaugh North, LLC ............
Niagara Wind Power, LLC ..
Conestogo Wind, LP ..........
EG13–11–000
EG13–12–000
EG13–13–000
EG13–14–000
EG13–15–000
FC13–7–000
Take notice that during the month of
March 2013, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
E:\FR\FM\17APN1.SGM
17APN1
22872
Federal Register / Vol. 78, No. 74 / Wednesday, April 17, 2013 / Notices
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Thursday, April 18, 2013.
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[Docket No. PR13–16–001; Docket No.
PR13–17–001; Not Consolidated]
sroberts on DSK5SPTVN1PROD with NOTICES
TexStar Transmission, LP; TEAK
Texana Transmission Company, LP;
Notice of Filings
Take notice that on April 5, 2013, the
applicants listed above submitted an
amendment to the December 6, 2012,
baseline filing of their Statement of
Operating Conditions for services
provided under Section 311 of the
Natural Gas Policy Act of 1978
(‘‘NGPA’’).
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
VerDate Mar<15>2010
16:50 Apr 16, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
[FR Doc. 2013–09018 Filed 4–16–13; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–09010 Filed 4–16–13; 8:45 am]
[FR Doc. 2013–09016 Filed 4–16–13; 8:45 am]
should contact W. Doug Foster at (202)
502–6118 (via email at
doug.foster@ferc.gov), or Norman
Richardson at (202) 502–6219 (via email
at norman.richardson@ferc.gov).
Federal Energy Regulatory
Commission
[Docket No. AD13–1–000]
[Project No. 14499–000]
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
Requesting Questions and Comments
on Fiscal Year 2012 Other Federal
Agency Cost Submissions
Hamilton Street Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
In its Order On Rehearing
Consolidating Administrative Annual
Charges Bill Appeals And Modifying
Annual Charges Billing Procedures, 109
FERC ¶ 61,040 (2004) (October 8 Order)
the Commission set forth an annual
process for Other Federal Agencies
(OFAs) to submit their costs related to
Administering Part I of the Federal
Power Act. Pursuant to the established
process, the Director of the Financial
Management Division, Office of the
Executive Director, on October 10, 2012,
issued a letter requesting the OFAs to
submit their costs by January 8, 2013
using the OFA Cost Submission Form.
Upon receipt of the agency
submissions, the Commission posted
the information in eLibrary, and issued,
on March 13, 2013, a notice announcing
the date for a technical conference to
review the submitted costs. On March
28, 2013, the Commission held the
technical conference. Technical
conference transcripts, submitted cost
forms, and detailed supporting
documents are all available for review
under Docket No. AD13–1. These
documents are accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and are available for
review in the Commission’s Public
Reference Room in Washington, DC.
Interested parties may file specific
questions and comments on the FY 2012
OFA cost submissions with the
Commission under Docket No. AD13–1,
no later than April 25, 2013. Once filed,
the Commission will forward the
questions and comments to the OFAs
for response.
Anyone with questions pertaining to
the technical conference or this notice
On February 19, 2013, Hamilton
Street Hydro, LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of hydropower at the existing Chain
Dam located on the Lehigh River in
Northampton County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Chain Dam
Hydroelectric Project would consist of
the following: (1) An existing 20-foothigh concrete gravity dam with a 690foot-long spillway; (2) an existing
impoundment having a surface area of
300 acres and a storage capacity of 1,197
acre-feet at an elevation of 190 feet
mean sea level (msl); (3) a new 70-footlong by 40-foot-wide by 35-foot-high
powerhouse with three new identical
turbine-generator units with an installed
capacity of 1,368 kilowatts each, and
three identical 20-foot-wide, 10-foothigh, 5-foot-long direct intakes; (4) a
new tailrace consisting of a 300-footlong, 5-foot-high concrete wing wall; (5)
a new 4,160-kilovolt transmission line
extending 245 feet from the powerhouse
to an existing distribution line; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 18.3 gigawatt-hours.
Applicant Contact: Mark
Boumansour, Hamilton Street Hydro,
LLC, 1401 Walnut Street, Suite 301,
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 78, Number 74 (Wednesday, April 17, 2013)]
[Notices]
[Pages 22871-22872]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-09016]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator or Foreign
Utility Company Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Carson Cogeneration Company, LP........................ EG13-11-000
Delano Energy Center, LLC.............................. EG13-12-000
Alpaugh 50, LLC........................................ EG13-13-000
Alpaugh North, LLC..................................... EG13-14-000
Niagara Wind Power, LLC................................ EG13-15-000
Conestogo Wind, LP..................................... FC13-7-000
------------------------------------------------------------------------
Take notice that during the month of March 2013, the status of the
above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
[[Page 22872]]
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-09016 Filed 4-16-13; 8:45 am]