Combined Notice of Filings #1, 22537-22538 [2013-08864]

Download as PDF Federal Register / Vol. 78, No. 73 / Tuesday, April 16, 2013 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2558–033] mstockstill on DSK4VPTVN1PROD with NOTICES Green Mountain Power Corporation; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types of Application: Non-capacity amendment of license. b. Project No.: 2558–033. c. Date Filed: March 29, 2013. d. Applicant: Green Mountain Power Corporation. e. Name of Project: Otter Creek Hydroelectric Project. f. Location: Otter Creek in Addison and Rutland Counties, Vermont. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Mike Scarzello, Green Mountain Power Corporation, 77 Grove Street, Rutland, VT 05701–3400, (802) 747–5207. i. FERC Contact: Rebecca Martin, (202) 502–6012, Rebecca.Martin@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: May 9, 2013. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–2558–033) on any comments or motions filed. k. Description of Application: Green Mountain Power Corporation is requesting a non-capacity license amendment to realign the intake at the Proctor development. The licensee would also remove inoperable generating equipment from the Proctor powerhouse to facilitate installation of new turbine generator equipment that is proposed under the Project’s application for subsequent license currently being VerDate Mar<15>2010 17:58 Apr 15, 2013 Jkt 229001 processed by the Commission. The proposed intake realignment construction includes demolition of portions of the existing intake, limited removal of bedrock, deepening and widening the intake channel and orienting the opening more directly to river flow. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–2558) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 22537 basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: April 9, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08820 Filed 4–15–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG13–25–000. Applicants: NRG Energy, Inc. Description: Self-Certification of EG or FC of NRG Energy, Inc for Petra Nova Power I LLC. Filed Date: 4/4/13. Accession Number: 20130404–5131. Comments Due: 5 p.m. ET 4/25/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–817–002. Applicants: Midwest Independent Transmission System Operator, Inc. Description: 04–08–2013 Resource Adequacy 2013 Comp Filing to be effective 2/27/2013. Filed Date: 4/8/13. Accession Number: 20130408–5126. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: ER13–5–001. Applicants: ITC Midwest LLC. Description: ITC Midwest LLC submits Compliance Filing of ITC Midwest LLC to be effective 3/11/2013. Filed Date: 4/9/13. E:\FR\FM\16APN1.SGM 16APN1 mstockstill on DSK4VPTVN1PROD with NOTICES 22538 Federal Register / Vol. 78, No. 73 / Tuesday, April 16, 2013 / Notices Accession Number: 20130409–5102. Comments Due: 5 p.m. ET 4/30/13. Docket Numbers: ER13–954–001. Applicants: Northern States Power Company, a Wisconsin corporation, Northern States Power Company, a Minnesota corporation. Description: 2013 Interchange Agreement Supplement to be effective 1/1/2013. Filed Date: 4/8/13. Accession Number: 20130408–5085. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: ER13–1035–001. Applicants: Palmco Power CA, LLC. Description: Palmco Power CA FERC Electric Tariff to be effective 5/9/2013. Filed Date: 4/9/13. Accession Number: 20130409–5023. Comments Due: 5 p.m. ET 4/30/13. Docket Numbers: ER13–1253–000. Applicants: Southern California Edison Company. Description: Revised Formula Rate: Non-Transmission Depreciation Rates to be effective 1/1/2012. Filed Date: 4/8/13. Accession Number: 20130408–5144. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: ER13–1254–000. Applicants: Duke Energy Carolinas, LLC. Description: Duke Energy Carolinas, LLC submits Joint OATT Real Power Loss (2013) to be effective 5/1/2013. Filed Date: 4/9/13. Accession Number: 20130409–5051. Comments Due: 5 p.m. ET 4/30/13. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH13–15–000. Applicants: Centerbridge Partners, L.P. Description: Centerbridge Partners, L.P. submits FERC–65–B Waiver Notification. Filed Date: 4/8/13. Accession Number: 20130408–5191. Comments Due: 5 p.m. ET 4/29/13. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR13–3–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Revisions to Appendix 2 and Appendix 4D of the NERC Rules of Procedure. Filed Date: 4/8/13. Accession Number: 20130408–5193. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: RR13–4–000. Applicants: North American Electric Reliability Corporation. VerDate Mar<15>2010 17:58 Apr 15, 2013 Jkt 229001 Description: Petition of North American Electric Reliability Corporation for Approval of Amendments to the Delegation Agreement with Texas Reliability Entity, Inc.—Amendments to Texas Reliability Entity, Inc.’s Bylaws. Filed Date: 4/9/13. Accession Number: 20130409–5096. Comments Due: 5 p.m. ET 4/30/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 9, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–08864 Filed 4–15–13; 8:45 am] BILLING CODE 6717–01–P and transportation assets of Eagle Point Power Generation LLC, et al. Filed Date: 4/5/13. Accession Number: 20130405–5175. Comments Due: 5 p.m. ET 4/26/13. Docket Numbers: ER12–2145–003; ER10–2834–003; ER11–2905–002; ER11– 2904–002; ER10–2821–003; ER12–1329– 001. Applicants: EC&R O&M, LLC, Munnsville Wind Farm, LLC, Pioneer Trail Wind Farm, LLC, Settlers Trail Wind Farm, LLC, Stony Creek Wind Farm, LLC, Wildcat Wind Farm I, LLC. Description: EC&R O&M, LLC, et. al. submits Notice of Change in Status. Filed Date: 4/8/13. Accession Number: 20130408–5078. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: ER13–666–002. Applicants: Public Service Company of Colorado. Description: 2013–04–05–NSP–SPNRTran-to Load-548 to be effective 1/1/ 2013. Filed Date: 4/8/13. Accession Number: 20130408–5000. Comments Due: 5 p.m. ET 4/29/13. Docket Numbers: ER13–1138–001. Applicants: Duke Energy Indiana, Inc. Description: Correction Filing ER13– 1138 to be effective 7/1/2012. Filed Date: 4/8/13. Accession Number: 20130408–5001. Comments Due: 5 p.m. ET 4/29/13. DEPARTMENT OF ENERGY The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Combined Notice of Filings #1 Any person desiring to intervene or protest in any of the above proceedings Take notice that the Commission must file in accordance with Rules 211 received the following electric rate and 214 of the Commission’s filings: Regulations (18 CFR 385.211 and Docket Numbers: ER11–2970–005. 385.214) on or before 5:00 p.m. Eastern Applicants: Peetz Logan Interconnect, time on the specified comment date. LLC. Protests may be considered, but Description: Peetz Logan Interconnect, intervention is necessary to become a LLC Amendment to Comp Filing and party to the proceeding. Motion for Leave to be effective 11/13/ eFiling is encouraged. More detailed 2011. information relating to filing Filed Date: 4/5/13. requirements, interventions, protests, Accession Number: 20130405–5105. service, and qualifying facilities filings Comments Due: 5 p.m. ET 4/26/13. can be found at: https://www.ferc.gov/ Docket Numbers: ER12–1436–004; docs-filing/efiling/filing-req.pdf. For ER10–3300–003; ER10–3099–004; ER12– other information, call (866) 208–3676 1260–003. (toll free). For TTY, call (202) 502–8659. Applicants: Eagle Point Power Dated: April 8, 2013. Generation LLC, La Paloma Generating Nathaniel J. Davis, Sr., Company, LLC, RC Cape May Holdings, Deputy Secretary. LLC, Stephentown Spindle, LLC. [FR Doc. 2013–08863 Filed 4–15–13; 8:45 am] Description: Update to Asset Appendices of generation, transmission BILLING CODE 6717–01–P Federal Energy Regulatory Commission PO 00000 Frm 00028 Fmt 4703 Sfmt 9990 E:\FR\FM\16APN1.SGM 16APN1

Agencies

[Federal Register Volume 78, Number 73 (Tuesday, April 16, 2013)]
[Notices]
[Pages 22537-22538]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08864]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG13-25-000.
    Applicants: NRG Energy, Inc.
    Description: Self-Certification of EG or FC of NRG Energy, Inc for 
Petra Nova Power I LLC.
    Filed Date: 4/4/13.
    Accession Number: 20130404-5131.
    Comments Due: 5 p.m. ET 4/25/13.
    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-817-002.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: 04-08-2013 Resource Adequacy 2013 Comp Filing to be 
effective 2/27/2013.
    Filed Date: 4/8/13.
    Accession Number: 20130408-5126.
    Comments Due: 5 p.m. ET 4/29/13.

    Docket Numbers: ER13-5-001.
    Applicants: ITC Midwest LLC.
    Description: ITC Midwest LLC submits Compliance Filing of ITC 
Midwest LLC to be effective 3/11/2013.
    Filed Date: 4/9/13.

[[Page 22538]]

    Accession Number: 20130409-5102.
    Comments Due: 5 p.m. ET 4/30/13.

    Docket Numbers: ER13-954-001.
    Applicants: Northern States Power Company, a Wisconsin corporation, 
Northern States Power Company, a Minnesota corporation.
    Description: 2013 Interchange Agreement Supplement to be effective 
1/1/2013.
    Filed Date: 4/8/13.
    Accession Number: 20130408-5085.
    Comments Due: 5 p.m. ET 4/29/13.

    Docket Numbers: ER13-1035-001.
    Applicants: Palmco Power CA, LLC.
    Description: Palmco Power CA FERC Electric Tariff to be effective 
5/9/2013.
    Filed Date: 4/9/13.
    Accession Number: 20130409-5023.
    Comments Due: 5 p.m. ET 4/30/13.

    Docket Numbers: ER13-1253-000.
    Applicants: Southern California Edison Company.
    Description: Revised Formula Rate: Non-Transmission Depreciation 
Rates to be effective 1/1/2012.
    Filed Date: 4/8/13.
    Accession Number: 20130408-5144.
    Comments Due: 5 p.m. ET 4/29/13.

    Docket Numbers: ER13-1254-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Duke Energy Carolinas, LLC submits Joint OATT Real 
Power Loss (2013) to be effective 5/1/2013.
    Filed Date: 4/9/13.
    Accession Number: 20130409-5051.
    Comments Due: 5 p.m. ET 4/30/13.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH13-15-000.
    Applicants: Centerbridge Partners, L.P.
    Description: Centerbridge Partners, L.P. submits FERC-65-B Waiver 
Notification.
    Filed Date: 4/8/13.
    Accession Number: 20130408-5191.
    Comments Due: 5 p.m. ET 4/29/13.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR13-3-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Petition of the North American Electric Reliability 
Corporation for Approval of Revisions to Appendix 2 and Appendix 4D of 
the NERC Rules of Procedure.
    Filed Date: 4/8/13.
    Accession Number: 20130408-5193.
    Comments Due: 5 p.m. ET 4/29/13.

    Docket Numbers: RR13-4-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Petition of North American Electric Reliability 
Corporation for Approval of Amendments to the Delegation Agreement with 
Texas Reliability Entity, Inc.--Amendments to Texas Reliability Entity, 
Inc.'s Bylaws.
    Filed Date: 4/9/13.
    Accession Number: 20130409-5096.
    Comments Due: 5 p.m. ET 4/30/13.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-08864 Filed 4-15-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.