Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Non-capacity
amendment of license.
b. Project No.: 2558–033.
c. Date Filed: March 29, 2013.
d. Applicant: Green Mountain Power
Corporation.
e. Name of Project: Otter Creek
Hydroelectric Project.
f. Location: Otter Creek in Addison
and Rutland Counties, Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Mike
Scarzello, Green Mountain Power
Corporation, 77 Grove Street, Rutland,
VT 05701–3400, (802) 747–5207.
i. FERC Contact: Rebecca Martin,
(202) 502–6012,
Rebecca.Martin@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
9, 2013.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2558–033) on any
comments or motions filed.
k. Description of Application: Green
Mountain Power Corporation is
requesting a non-capacity license
amendment to realign the intake at the
Proctor development. The licensee
would also remove inoperable
generating equipment from the Proctor
powerhouse to facilitate installation of
new turbine generator equipment that is
proposed under the Project’s application
for subsequent license currently being
VerDate Mar<15>2010
17:58 Apr 15, 2013
Jkt 229001
processed by the Commission. The
proposed intake realignment
construction includes demolition of
portions of the existing intake, limited
removal of bedrock, deepening and
widening the intake channel and
orienting the opening more directly to
river flow.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2558) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
22537
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: April 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–08820 Filed 4–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG13–25–000.
Applicants: NRG Energy, Inc.
Description: Self-Certification of EG or
FC of NRG Energy, Inc for Petra Nova
Power I LLC.
Filed Date: 4/4/13.
Accession Number: 20130404–5131.
Comments Due: 5 p.m. ET 4/25/13.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–817–002.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: 04–08–2013 Resource
Adequacy 2013 Comp Filing to be
effective 2/27/2013.
Filed Date: 4/8/13.
Accession Number: 20130408–5126.
Comments Due: 5 p.m. ET 4/29/13.
Docket Numbers: ER13–5–001.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits Compliance Filing of ITC
Midwest LLC to be effective 3/11/2013.
Filed Date: 4/9/13.
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 78, Number 73 (Tuesday, April 16, 2013)]
[Notices]
[Page 22537]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08820]
[[Page 22537]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2558-033]
Green Mountain Power Corporation; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Non-capacity amendment of license.
b. Project No.: 2558-033.
c. Date Filed: March 29, 2013.
d. Applicant: Green Mountain Power Corporation.
e. Name of Project: Otter Creek Hydroelectric Project.
f. Location: Otter Creek in Addison and Rutland Counties, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Mike Scarzello, Green Mountain Power
Corporation, 77 Grove Street, Rutland, VT 05701-3400, (802) 747-5207.
i. FERC Contact: Rebecca Martin, (202) 502-6012,
Rebecca.Martin@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: May 9, 2013.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-2558-033) on any comments or motions filed.
k. Description of Application: Green Mountain Power Corporation is
requesting a non-capacity license amendment to realign the intake at
the Proctor development. The licensee would also remove inoperable
generating equipment from the Proctor powerhouse to facilitate
installation of new turbine generator equipment that is proposed under
the Project's application for subsequent license currently being
processed by the Commission. The proposed intake realignment
construction includes demolition of portions of the existing intake,
limited removal of bedrock, deepening and widening the intake channel
and orienting the opening more directly to river flow.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-2558) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: April 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-08820 Filed 4-15-13; 8:45 am]
BILLING CODE 6717-01-P