El Paso Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization, 21934 [2013-08600]

Download as PDF mstockstill on DSK6TPTVN1PROD with NOTICES 21934 Federal Register / Vol. 78, No. 71 / Friday, April 12, 2013 / Notices interconnection study would be required to determine the exact transmission that would be used. The proposed project would have a total installed capacity of 20 megawatts and generate an estimated average annual energy production of 145 gigawatthours. Applicant Contact: Mr. Paul Grist, Archon Energy 1, Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602, phone: (403) 618–2018. FERC Contact: Corey Vezina; phone: (202) 502–8598, email: Corey.vezina@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14481) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08585 Filed 4–11–13; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:47 Apr 11, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–112–000] El Paso Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on March 26, 2013, El Paso Natural Gas Company, L.L.C. (El Paso), P.O. Box 1087, Colorado Springs, CO 80944, filed in Docket No. CP13– 112–000, an application pursuant to sections 157.205, 157.208 (b) and 157.210 of the Commission’s Regulations under the Natural Gas Act (NGA) as amended, to construct and operate loop line facilities on the Willcox Lateral located in Cochise County, Arizona, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Francisco Tarin, Director, Regulatory Affairs Department, El Paso Natural Gas Company, L.L.C., P.O. Box 1087, Colorado Springs, CO 80944, (719) 667– 7517. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: April 3, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08600 Filed 4–11–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD12–12–000] Coordination Between Natural Gas and Electricity Markets; Supplemental Notice of Technical Conference As announced in the Notice issued on March 5, 2013,1 the Federal Energy Regulatory Commission (Commission) staff will hold a technical conference on Thursday, April 25, 2013 from 9:00 a.m. to approximately 5:00 p.m. to discuss natural gas and electric scheduling, and issues related to whether and how natural gas and electric industry schedules and practices could be harmonized in order to achieve the most efficient scheduling systems for both industries. The conference will be held at the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The agenda and list of roundtable participants for this conference are attached. This conference is free of charge and open to 1 Coordination between Natural Gas and Electricity Markets, Docket No. AD12–12–000 (Mar. 5, 2013) (Notice of Technical Conference) (https:// elibrary.ferc.gov/idmws/ File_list.asp?document_id=14095482). E:\FR\FM\12APN1.SGM 12APN1

Agencies

[Federal Register Volume 78, Number 71 (Friday, April 12, 2013)]
[Notices]
[Page 21934]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08600]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-112-000]


El Paso Natural Gas Company, L.L.C.; Notice of Request Under 
Blanket Authorization

    Take notice that on March 26, 2013, El Paso Natural Gas Company, 
L.L.C. (El Paso), P.O. Box 1087, Colorado Springs, CO 80944, filed in 
Docket No. CP13-112-000, an application pursuant to sections 157.205, 
157.208 (b) and 157.210 of the Commission's Regulations under the 
Natural Gas Act (NGA) as amended, to construct and operate loop line 
facilities on the Willcox Lateral located in Cochise County, Arizona, 
all as more fully set forth in the application which is on file with 
the Commission and open to public inspection. The filing may also be 
viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 
208-3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Francisco Tarin, Director, Regulatory Affairs Department, El Paso 
Natural Gas Company, L.L.C., P.O. Box 1087, Colorado Springs, CO 80944, 
(719) 667-7517.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: April 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-08600 Filed 4-11-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.