Download as PDF Federal Register / Vol. 78, No. 71 / Friday, April 12, 2013 / Notices Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. p. Public notice of the filing of the initial development application was made under P–12970–001 and established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. q. The license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. r. Procedural schedule: The application will be processed according to the following procedural schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of the availability of the EA. August 2013. Dated: April 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08584 Filed 4–11–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11402–074] mstockstill on DSK6TPTVN1PROD with NOTICES City of Crystal Falls, MI; Notice of Application for Temporary Variance of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance of license. b. Project No: 11402–074. c. Date Filed: March 11, 2013. d. Applicant: City of Crystal Falls, MI. e. Name of Project: Crystal Falls Project. VerDate Mar<15>2010 16:47 Apr 11, 2013 Jkt 229001 f. Location: The project is located on the Paint River in the City of Crystal Falls, Iron County, Michigan. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Dave Graff, City of Crystal Falls, 401 Superior Avenue, Crystal Falls, Mi 49920, (906) 875–6650. i. FERC Contact: Rebecca Martin, (202) 502–6012, Rebecca.martin@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: May 3, 2013. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–11402–074) on any comments or motions filed. k. Description of Application: The City of Crystal Falls is requesting a variance of articles 401, 402, and 405 of its license. The City of Crystal Falls intends to complete non-safety related maintenance at its low hazard hydroelectric dam in the summer of 2013. In order to complete the project, drawdown of the impoundment would begin on June 27, 2013 at a rate of 1.0 foot per day for the first four days then the drawdown rate would switch to 1.5 feet per day until a 20 foot drawdown is reached. The impoundment would be filled as the inflow allows, while maintaining 150 cubic feet per second outflow. The reservoir would be filled no later than November 1, 2013. During the drawdown the City will conduct surveys for stranded mussels and fish. Additionally, recreational access will be limited to canoes, kayaks, and small boats during the drawdown. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 21923 the docket number field (P–11402) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this E:\FR\FM\12APN1.SGM 12APN1 21924 Federal Register / Vol. 78, No. 71 / Friday, April 12, 2013 / Notices application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: April 3, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08595 Filed 4–11–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 618–195] mstockstill on DSK6TPTVN1PROD with NOTICES Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No.: 618–195. c. Date Filed: March 21, 2013. d. Applicant: Alabama Power Company. e. Name of Project: Jordan Dam Project. f. Location: The project is located on the Coosa River in Chilton, Coosa, and Elmore Counties, Alabama. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. James F. Crew, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291–8180, (205) 257–4265. i. FERC Contact: Christopher Chaney, (202) 502–6778, christopher.chaney@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 18, 2013. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents VerDate Mar<15>2010 16:47 Apr 11, 2013 Jkt 229001 may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Application: Alabama Power Company seeks approval to replace the Unit 4 turbine at the Jordan Dam Project. Specifically, the licensee proposes the following work: complete turbine replacement, wicket gate system rehabilitation or replacement, gate stem bushing replacement, turbine and generator bearing refurbishment, and related component replacement. The turbine unit modifications are expected to increase the turbine rating by approximately 3 megawatts (MW), as well as increase efficiency and annual generation; however, since the unit is generator-limited, the installed capacity will not change. The unit replacement would result in a maximum hydraulic capacity increase of approximately 4.6 percent for Unit 4, and 1.2 percent for the Project. No change in project operations is proposed. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number (P–618–195) excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Any filings must bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘PROTEST,’’ or ‘‘MOTION TO INTERVENE,’’ as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. o. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: April 3, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–08594 Filed 4–11–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG13–23–000. Applicants: RE Rosamond One LLC. Description: RE Rosamond One LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 4/3/13. Accession Number: 20130403–5061. Comments Due: 5 p.m. ET 4/24/13. Docket Numbers: EG13–24–000. Applicants: RE Rosamond Two LLC. Description: RE Rosamond Two LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 4/3/13. Accession Number: 20130403–5062. Comments Due: 5 p.m. ET 4/24/13. E:\FR\FM\12APN1.SGM 12APN1

Agencies

[Federal Register Volume 78, Number 71 (Friday, April 12, 2013)]
[Notices]
[Pages 21923-21924]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08595]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11402-074]


City of Crystal Falls, MI; Notice of Application for Temporary 
Variance of License and Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Temporary variance of license.
    b. Project No: 11402-074.
    c. Date Filed: March 11, 2013.
    d. Applicant: City of Crystal Falls, MI.
    e. Name of Project: Crystal Falls Project.
    f. Location: The project is located on the Paint River in the City 
of Crystal Falls, Iron County, Michigan.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Dave Graff, City of Crystal Falls, 401 
Superior Avenue, Crystal Falls, Mi 49920, (906) 875-6650.
    i. FERC Contact: Rebecca Martin, (202) 502-6012, 
Rebecca.martin@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: May 3, 2013.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. Please include the 
project number (P-11402-074) on any comments or motions filed.
    k. Description of Application: The City of Crystal Falls is 
requesting a variance of articles 401, 402, and 405 of its license. The 
City of Crystal Falls intends to complete non-safety related 
maintenance at its low hazard hydroelectric dam in the summer of 2013. 
In order to complete the project, drawdown of the impoundment would 
begin on June 27, 2013 at a rate of 1.0 foot per day for the first four 
days then the drawdown rate would switch to 1.5 feet per day until a 20 
foot drawdown is reached. The impoundment would be filled as the inflow 
allows, while maintaining 150 cubic feet per second outflow. The 
reservoir would be filled no later than November 1, 2013. During the 
drawdown the City will conduct surveys for stranded mussels and fish. 
Additionally, recreational access will be limited to canoes, kayaks, 
and small boats during the drawdown.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-11402) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment application. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this

[[Page 21924]]

application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: April 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-08595 Filed 4-11-13; 8:45 am]