Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21933-21934 [2013-08585]
Download as PDF
Federal Register / Vol. 78, No. 71 / Friday, April 12, 2013 / Notices
mstockstill on DSK6TPTVN1PROD with NOTICES
• potential spills from debrining the
caverns and potential impact to
groundwater and surface water quality;
and
• cumulative environmental impacts
from existing natural gas and LPG
storage in the region.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the Project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before May 3,
2013.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the Project
docket number (CP13–83–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. An eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; environmental and
public interest groups; other interested
VerDate Mar<15>2010
16:47 Apr 11, 2013
Jkt 229001
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who own
homes within certain distances of
aboveground facilities, and anyone who
submitted comments on the project. We
have made every effort to include all
commentors on the mailing list;
however, we are unable to include
commentors that did not include a
physical address with their comments.
We will update the environmental
mailing list as the analysis proceeds to
ensure that we send the information
related to this environmental review to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
Once the EA is published for
distribution, copies will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request
(Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket number
field (i.e., CP13–83). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
21933
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: April 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–08598 Filed 4–11–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14481–000]
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 15, 2013, Archon Energy
1, Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Palo Verde Diversion Dam Hydroelectric
Project (Palo Verde Diversion Dam
Project or project) to be located on the
Colorado River, near the city of
Mayflower, Riverside County,
California. The project would be located
on a small portion of Bureau of Land
Management lands. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A gated water intake
canal adjacent to the existing dam; (2)
fish screens; (3) a 200-foot by 50-foot by
70-foot turbine structure enclosing four
Kaplan turbine generators; and (4)
appurtenant facilities. The project
would require interconnection to a
Southern California Edison transmission
line located approximately one mile
west of the Palo Verde Dam. An
E:\FR\FM\12APN1.SGM
12APN1
mstockstill on DSK6TPTVN1PROD with NOTICES
21934
Federal Register / Vol. 78, No. 71 / Friday, April 12, 2013 / Notices
interconnection study would be
required to determine the exact
transmission that would be used. The
proposed project would have a total
installed capacity of 20 megawatts and
generate an estimated average annual
energy production of 145 gigawatthours.
Applicant Contact: Mr. Paul Grist,
Archon Energy 1, Inc., 101 E. Kennedy
Blvd., Suite 2800, Tampa, Florida
33602, phone: (403) 618–2018.
FERC Contact: Corey Vezina; phone:
(202) 502–8598, email:
Corey.vezina@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14481) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–08585 Filed 4–11–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:47 Apr 11, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–112–000]
El Paso Natural Gas Company, L.L.C.;
Notice of Request Under Blanket
Authorization
Take notice that on March 26, 2013,
El Paso Natural Gas Company, L.L.C. (El
Paso), P.O. Box 1087, Colorado Springs,
CO 80944, filed in Docket No. CP13–
112–000, an application pursuant to
sections 157.205, 157.208 (b) and
157.210 of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, to construct and
operate loop line facilities on the
Willcox Lateral located in Cochise
County, Arizona, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to
Francisco Tarin, Director, Regulatory
Affairs Department, El Paso Natural Gas
Company, L.L.C., P.O. Box 1087,
Colorado Springs, CO 80944, (719) 667–
7517.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: April 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–08600 Filed 4–11–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD12–12–000]
Coordination Between Natural Gas and
Electricity Markets; Supplemental
Notice of Technical Conference
As announced in the Notice issued on
March 5, 2013,1 the Federal Energy
Regulatory Commission (Commission)
staff will hold a technical conference on
Thursday, April 25, 2013 from 9:00 a.m.
to approximately 5:00 p.m. to discuss
natural gas and electric scheduling, and
issues related to whether and how
natural gas and electric industry
schedules and practices could be
harmonized in order to achieve the most
efficient scheduling systems for both
industries. The conference will be held
at the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. The agenda and
list of roundtable participants for this
conference are attached. This
conference is free of charge and open to
1 Coordination between Natural Gas and
Electricity Markets, Docket No. AD12–12–000 (Mar.
5, 2013) (Notice of Technical Conference) (https://
elibrary.ferc.gov/idmws/
File_list.asp?document_id=14095482).
E:\FR\FM\12APN1.SGM
12APN1
Agencies
[Federal Register Volume 78, Number 71 (Friday, April 12, 2013)]
[Notices]
[Pages 21933-21934]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08585]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14481-000]
Archon Energy 1, Inc.; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On January 15, 2013, Archon Energy 1, Inc. filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Palo Verde Diversion
Dam Hydroelectric Project (Palo Verde Diversion Dam Project or project)
to be located on the Colorado River, near the city of Mayflower,
Riverside County, California. The project would be located on a small
portion of Bureau of Land Management lands. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A gated
water intake canal adjacent to the existing dam; (2) fish screens; (3)
a 200-foot by 50-foot by 70-foot turbine structure enclosing four
Kaplan turbine generators; and (4) appurtenant facilities. The project
would require interconnection to a Southern California Edison
transmission line located approximately one mile west of the Palo Verde
Dam. An
[[Page 21934]]
interconnection study would be required to determine the exact
transmission that would be used. The proposed project would have a
total installed capacity of 20 megawatts and generate an estimated
average annual energy production of 145 gigawatt-hours.
Applicant Contact: Mr. Paul Grist, Archon Energy 1, Inc., 101 E.
Kennedy Blvd., Suite 2800, Tampa, Florida 33602, phone: (403) 618-2018.
FERC Contact: Corey Vezina; phone: (202) 502-8598, email:
Corey.vezina@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14481) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-08585 Filed 4-11-13; 8:45 am]
BILLING CODE 6717-01-P