Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL, 21537 [2013-08404]
Download as PDF
Federal Register / Vol. 78, No. 70 / Thursday, April 11, 2013 / Rules and Regulations
21537
SUPPLEMENT NO. 1 TO PART 126*—Continued
USML Category
(CA)
§ 126.5
Exclusion
(AS)
§ 126.16
(UK)
§ 126.17
4. Each explosive submunition is equipped with an electronic self-destruction mechanism; and
5. Each explosive submunition is equipped with an electronic self-deactivating feature.
Pursuant to U.S. law (Pub. L. 111–117, section 7055(b)), no military assistance shall be furnished for cluster munitions, no defense export license for cluster munitions may be issued, and no cluster munitions or cluster munitions technology shall be sold or transferred, unless:
(a) The submunitions of the cluster munitions, after arming, do not result in more than 1 percent unexploded ordnance across the range of
intended operational environments; and
(b) The agreement applicable to the assistance, transfer or sale of such cluster munitions or cluster munitions technology specifies that the
cluster munitions will only be used against clearly defined military targets and will not be used where civilians are known to be present or
in areas normally inhabited by civilians.
Note 17: The radar systems described are controlled in USML Category XI(a)(3)(i) through (v). As used in this entry, the term ‘‘systems’’ includes equipment, devices, software, assemblies, modules, components, practices, processes, methods, approaches, schema, frameworks,
and models.
* An ‘‘X’’ in the chart indicates that the item is excluded from use under the exemption referenced in the top of the column. An item excluded
in any one row is excluded regardless of whether other rows may contain a description that would include the item.
Dated: April 5, 2013.
Rose E. Gottemoeller,
Acting Under Secretary, Arms Control and
International Security, Department of State.
[FR Doc. 2013–08506 Filed 4–10–13; 8:45 am]
BILLING CODE 4710–25–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0183]
Drawbridge Operation Regulations;
Upper Mississippi River, Rock Island,
IL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Rock Island
Railroad and Highway Drawbridge
across the Upper Mississippi River, mile
482.9, at Rock Island, Illinois. The
deviation is necessary to allow the Front
Street 5K Run to cross the bridge. This
deviation allows the bridge to be
maintained in the closed-to-navigation
position for one hour.
DATES: This deviation is effective from
7 p.m. to 8 p.m. on June 15, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0183] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
TKELLEY on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
18:35 Apr 10, 2013
Jkt 229001
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email
Eric.Washburn@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The U.S.
Army Rock Island Arsenal requested a
temporary deviation for the Rock Island
Railroad and Highway Drawbridge,
across the Upper Mississippi River, mile
482.9, at Rock Island, Illinois to remain
in the closed-to-navigation position for
a one hour period from 7 p.m. to 8 p.m.,
June 15, 2013, while a 5K run is held
between the cities of Davenport, IA and
Rock Island, IL. The Rock Island
Railroad and Highway Drawbridge
currently operates in accordance with
33 CFR 117.5, which states the general
requirement that drawbridges shall open
promptly and fully for the passage of
vessels when a request to open is given
in accordance with the subpart.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
The Rock Island Railroad and
Highway Drawbridge, in the closed-tonavigation position, provides a vertical
clearance of 23.8 feet above normal
pool. Navigation on the waterway
consists primarily of commercial tows
and recreational watercraft. This
temporary deviation has been
coordinated with waterway users. No
objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 21, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013–08404 Filed 4–10–13; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R09–OAR–2013–0103; FRL–9794–4]
Revisions to the California State
Implementation Plan, Santa Barbara
and San Diego County Air Pollution
Control Districts
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
AGENCY:
EPA is taking direct final
action to approve revisions to the Santa
Barbara County Air Pollution Control
District (SBCAPCD) and San Diego
County Air Pollution Control District
(SDCAPCD) portions of the California
State Implementation Plan (SIP). These
revisions concern volatile organic
compound (VOC) emissions from
surface coating of aerospace vehicles
and components and from wood
products coating operations. We are
approving local rules that regulate these
emission sources under the Clean Air
Act as amended in 1990 (CAA or the
Act).
SUMMARY:
This rule is effective on June 10,
2013 without further notice, unless EPA
receives adverse comments by May 13,
2013. If we receive such comments, we
will publish a timely withdrawal in the
Federal Register to notify the public
DATES:
E:\FR\FM\11APR1.SGM
11APR1
Agencies
[Federal Register Volume 78, Number 70 (Thursday, April 11, 2013)]
[Rules and Regulations]
[Page 21537]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-08404]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0183]
Drawbridge Operation Regulations; Upper Mississippi River, Rock
Island, IL
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Rock Island Railroad and Highway
Drawbridge across the Upper Mississippi River, mile 482.9, at Rock
Island, Illinois. The deviation is necessary to allow the Front Street
5K Run to cross the bridge. This deviation allows the bridge to be
maintained in the closed-to-navigation position for one hour.
DATES: This deviation is effective from 7 p.m. to 8 p.m. on June 15,
2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0183] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378,
email Eric.Washburn@uscg.mil. If you have questions on viewing the
docket, call Barbara Hairston, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested
a temporary deviation for the Rock Island Railroad and Highway
Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock
Island, Illinois to remain in the closed-to-navigation position for a
one hour period from 7 p.m. to 8 p.m., June 15, 2013, while a 5K run is
held between the cities of Davenport, IA and Rock Island, IL. The Rock
Island Railroad and Highway Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that
drawbridges shall open promptly and fully for the passage of vessels
when a request to open is given in accordance with the subpart.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
The Rock Island Railroad and Highway Drawbridge, in the closed-to-
navigation position, provides a vertical clearance of 23.8 feet above
normal pool. Navigation on the waterway consists primarily of
commercial tows and recreational watercraft. This temporary deviation
has been coordinated with waterway users. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 21, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013-08404 Filed 4-10-13; 8:45 am]
BILLING CODE 9110-04-P