Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 20632 Federal Register / Vol. 78, No. 66 / Friday, April 5, 2013 / Notices the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: George W. Denning, Office of Emergency Management, Mail Code 5104A, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number: (202) 564–2404; fax number: (202) 564–2625; email address: Denning.George@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave., NW., Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https://www.epa.gov/ dockets. Abstract: The authority for EPA’s oil pollution prevention requirements is derived from section 311(j)(1)(C) of the Clean Water Act, as amended by the Oil Pollution Act of 1990. EPA’s regulation is codified at 40 CFR part 112. An SPCC Plan will help an owner or operator identify the necessary procedures, equipment and resources to respond to prevent an oil spill and to respond to an oil spill in a timely manner. If implemented effectively, the SPCC Plan is expected to prevent oil spills and reduce the impact and severity of oil spills. Although the owner or operator is the primary data user, EPA may also require the owner or operator to submit data to the Agency in certain situations to ensure facilities comply with the SPCC regulation and to help allocate response resources. State and local governments may use the data, which are not generally available elsewhere and can assist local emergency preparedness planning efforts. EPA does not require an owner or operator to submit SPCC Plans, but may request the SPCC Plan during a facility inspection or an oil spill incident for review. The SPCC regulation requires the owner or operator maintain a complete copy of the Plan at the facility if the facility is normally attended at least fours hours per day or at the nearest field office if the facility is not so attended. The rule also requires that the Plan be available to the Regional Administrator for on-site review during normal working hours (40 CFR 112.3(e)). Form Numbers: None. VerDate Mar<15>2010 17:14 Apr 04, 2013 Jkt 229001 Respondents/affected entities: Private facilities, State/Local/Tribal governments. Respondent’s obligation to respond: Mandatory per 40 CFR part 112. Estimated number of respondents: 670,048 (total). Frequency of response: Less than once per year. Total estimated burden: 8,798,928 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $987,220,025, includes $186,674,814 annualized capital or operation and maintenance costs. Changes in the Estimates: Differences in burden and costs from the previous ICR are attributed to adjustments for wage rates, unit costs, and the projected universe of facilities. John Moses, Director, Collection Strategies Division. Draft General Management Plan, Comment Period Ends: 06/04/2013, Contact: David Libman 404–507– 5701. EIS No. 20130084, Final EIS, USFS, CO, Black Mesa Vegetation Management Project, Rio Grande National Forest, Review Period Ends: 05/17/2013, Contact: Diana McGinn 719–852– 6241. EIS No. 20130085, Final EIS, USACE, OK, Eufaula Lake Shoreline Management Plan Revision and Master Plan Supplement, Review Period Ends: 05/06/2013, Contact: Jeff Knack 918–669–7666. Dated: April 2, 2013. Cliff Rader, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2013–07982 Filed 4–4–13; 8:45 am] BILLING CODE 6560–50–P [FR Doc. 2013–07888 Filed 4–4–13; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9008–5] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/25/2013 Through 03/29/2013 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20130080, Final EIS, BLM, CA, Clear Creek Management Area Proposed Resource Management Plan, Review Period Ends: 05/06/2013, Contact: Sky Murphy (831) 630–5039. EIS No. 20130081, Draft EIS, USFWS, IN, Fowler Ridge Wind Habitat Conservation Plan and Incidental Take Permit, Comment Period Ends: 06/04/2013, Contact: Scott Pruitt 812– 334–4261. EIS No. 20130082, Draft Supplement, FERC, ME, Downeast Liquefied Natural Gas (LNG) Project, Comment Period Ends: 05/20/2013, Contact: Shannon Crosley 202–502–8853. EIS No. 20130083, Draft EIS, NPS, NC, Fort Raleigh National Historic Site PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 [EPA–HQ–OAR–2009–0927; FRL–9799–4] Mandatory Reporting of Greenhouse Gases: Notice of Data Availability Regarding Global Warming Potential Values for Certain Fluorinated Greenhouse Gases and Fluorinated Heat Transfer Fluids Environmental Protection Agency (EPA). ACTION: Notice of data availability and request for comment. AGENCY: The EPA is announcing to the public the availability of estimated global warming potentials, as well as data and analysis submitted in support of them, for eight fluorinated heat transfer fluids. We are requesting comments on the estimated global warming potentials and the data and analysis supporting them. We are also requesting comment on the cited global warming potentials for 35 other fluorinated greenhouse gases and fluorinated heat transfer fluids for which we do not currently possess supporting data and analysis. The EPA is requesting comment on the global warming potentials of all 43 chemicals as we consider adding these global warming potentials to the Greenhouse Gas Reporting rule. DATES: Comments must be received on or before May 6, 2013. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OAR–2009–0927, by one of the following methods: SUMMARY: E:\FR\FM\05APN1.SGM 05APN1

Agencies

[Federal Register Volume 78, Number 66 (Friday, April 5, 2013)]
[Notices]
[Page 20632]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07982]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9008-5]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 03/25/2013 
Through 03/29/2013
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20130080, Final EIS, BLM, CA, Clear Creek Management Area 
Proposed Resource Management Plan, Review Period Ends: 05/06/2013, 
Contact: Sky Murphy (831) 630-5039.
EIS No. 20130081, Draft EIS, USFWS, IN, Fowler Ridge Wind Habitat 
Conservation Plan and Incidental Take Permit, Comment Period Ends: 06/
04/2013, Contact: Scott Pruitt 812-334-4261.
EIS No. 20130082, Draft Supplement, FERC, ME, Downeast Liquefied 
Natural Gas (LNG) Project, Comment Period Ends: 05/20/2013, Contact: 
Shannon Crosley 202-502-8853.
EIS No. 20130083, Draft EIS, NPS, NC, Fort Raleigh National Historic 
Site Draft General Management Plan, Comment Period Ends: 06/04/2013, 
Contact: David Libman 404-507-5701.
EIS No. 20130084, Final EIS, USFS, CO, Black Mesa Vegetation Management 
Project, Rio Grande National Forest, Review Period Ends: 05/17/2013, 
Contact: Diana McGinn 719-852-6241.
EIS No. 20130085, Final EIS, USACE, OK, Eufaula Lake Shoreline 
Management Plan Revision and Master Plan Supplement, Review Period 
Ends: 05/06/2013, Contact: Jeff Knack 918-669-7666.

    Dated: April 2, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2013-07982 Filed 4-4-13; 8:45 am]
BILLING CODE 6560-50-P