Download as PDF 20312 Federal Register / Vol. 78, No. 65 / Thursday, April 4, 2013 / Notices requested topic(s) on the agenda. The Chair of the Board is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Minutes: The minutes of the meeting will be available for public review and copying within 90 days on the STEAB Web site at: www.steab.org. Issued at Washington, DC, on March 29, 2013. LaTanya R. Butler, Deputy Committee Management Officer. [FR Doc. 2013–07832 Filed 4–3–13; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection, L.L.C. (PJM), Independent System Operator New England, Inc. (ISO–NE), and New York Independent System Operator, Inc. (NYISO): wreier-aviles on DSK5TPTVN1PROD with NOTICES Inter-Regional Planning Stakeholder Advisory Committee—New York/New England April 3, 2013, 9:00 a.m.–12:00 p.m., Local Time The above-referenced meeting will be held over conference call. The above-referenced meeting is open to stakeholders. Further information may be found at www.pjm.com/committees-and-groups/ stakeholder-meetings/stakeholdergroups/ipsac-ny-ne.aspx. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER08–1281, New York Independent System Operator, Inc. Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. ER10–253 and EL10–14, Primary Power, L.L.C. Docket No. EL12–69, Primary Power LLC v. PJM Interconnection, L.L.C. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1178, PJM Interconnection, L.L.C. VerDate Mar<15>2010 14:48 Apr 03, 2013 Jkt 229001 Docket No. ER13–90, Public Service Electric and Gas Company and PJM Interconnection, L.L.C. Docket No. ER13–102–000, New York Independent System Operator, Inc. Docket No. ER13–193–000, ISO New England Inc. Docket No. ER13–195, Indicated PJM Transmission Owners Docket No. ER13–196–000, ISO New England Inc. Docket No. ER13–198, PJM Interconnection, L.L.C Docket No. ER13–397, PJM Interconnection, L.L.C. Docket No. ER13–673, PJM Interconnection, L.L.C Docket No. ER13–703, PJM Interconnection, L.L.C. Docket No. ER13–887, PJM Interconnection, L.L.C. Docket No. ER13–1052, PJM Interconnection, L.L.C. and the Midwest Independent Transmission System Operator, Inc. Docket No. ER13–1054, PJM Interconnection, L.L.C. and the Midwest Independent Transmission System Operator, Inc. For more information, contact Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6604 or jonathan.fernandez@ferc.gov. Dated: March 28, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–07793 Filed 4–3–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket Nos. CP07–52–000; CP07–53–000; CP07–53–001] Downeast LNG, Inc., Downeast Pipeline, LLC.; Notice of Availability of the Supplemental Draft Environmental Impact Statement for the Proposed Downeast LNG Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a Supplemental Draft Environmental Impact Statement (EIS) for the Downeast LNG Project, proposed by Downeast LNG, Inc. and Downeast Pipeline, LLC (hereafter collectively referred to as Downeast) in the above-referenced dockets. Downeast requests authorization to construct and operate a new liquefied natural gas (LNG) import terminal, natural gas pipeline, and associated facilities in Washington PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 County, Maine. The Downeast LNG Project would provide about 500 million cubic feet per day of imported natural gas to the New England region. The Commission previously issued a draft EIS for this project in May 2009. Since then the U.S. Department of Transportation (DOT) has issued clarifications on its Title 49 of the Code of Federal Regulations (CFR), Part 193, which are relevant to the proposed Downeast LNG Project. In October 2011, DOT issued final decisions approving specific alternative models for use in complying with these federal safety standards. Downeast filed information with the FERC as required by the latest DOT interpretations in October and November 2012. In 2010, the U.S. Coast Guard (Coast Guard) revised its regulations in Title 33, CFR, Part 127 on the process used to examine the suitability of the waterway for LNG carrier transits. In 2011, the Coast Guard also updated Navigation and Vessel Inspection Circular 01–2011, ‘‘Guidance Related to Waterfront LNG Facilities.’’ In 2012, the U.S. Department of Energy (DOE) released the report ‘‘Liquefied Natural Gas Safety Research Report to Congress’’ detailing the results of research conducted by Sandia National Laboratories on intentional breaches of LNG carrier cargo tanks and the resulting LNG spills on water. Based on the new information from the DOT, DOE, Coast Guard, and Downeast, FERC staff revised the reliability and safety analysis of the LNG terminal and carrier transit that was presented in the May 2009 draft EIS and prepared the Supplemental draft EIS. This document presents FERC staff’s: technical review of the proposed facility’s preliminary design; siting analysis, prepared with the cooperation of the DOT; and conclusions on the waterway suitability based on input from the Coast Guard. The DOT participated as a cooperating agency in the preparation of the Supplemental draft EIS. We 1 mailed copies of the Supplemental draft EIS to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. Paper copy versions of the Supplement to the draft EIS were mailed to those specifically requesting them; all others 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the FERC’s Office of Energy Projects. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 78, Number 65 (Thursday, April 4, 2013)]
[Notices]
[Page 20312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07793]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission's staff may attend the following 
joint stakeholder meeting related to the transmission planning 
activities of PJM Interconnection, L.L.C. (PJM), Independent System 
Operator New England, Inc. (ISO-NE), and New York Independent System 
Operator, Inc. (NYISO):

Inter-Regional Planning Stakeholder Advisory Committee--New York/New 
England

April 3, 2013, 9:00 a.m.-12:00 p.m., Local Time
    The above-referenced meeting will be held over conference call.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at www.pjm.com/committees-and-groups/stakeholder-meetings/stakeholder-groups/ipsac-ny-ne.aspx.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:

Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection, 
L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER11-1844, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM 
Interconnection, L.L.C.
Docket No. ER13-102-000, New York Independent System Operator, Inc.
Docket No. ER13-193-000, ISO New England Inc.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-196-000, ISO New England Inc.
Docket No. ER13-198, PJM Interconnection, L.L.C
Docket No. ER13-397, PJM Interconnection, L.L.C.
Docket No. ER13-673, PJM Interconnection, L.L.C
Docket No. ER13-703, PJM Interconnection, L.L.C.
Docket No. ER13-887, PJM Interconnection, L.L.C.
Docket No. ER13-1052, PJM Interconnection, L.L.C. and the Midwest 
Independent Transmission System Operator, Inc.
Docket No. ER13-1054, PJM Interconnection, L.L.C. and the Midwest 
Independent Transmission System Operator, Inc.

    For more information, contact Jonathan Fernandez, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.

    Dated: March 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-07793 Filed 4-3-13; 8:45 am]
BILLING CODE 6717-01-P