Federal Register / Vol. 78, No. 65 / Thursday, April 4, 2013 / Notices
requested topic(s) on the agenda. The
Chair of the Board is empowered to
conduct the meeting in a fashion that
will facilitate the orderly conduct of
business.
Minutes: The minutes of the meeting
will be available for public review and
copying within 90 days on the STEAB
Web site at: www.steab.org.
Issued at Washington, DC, on March 29,
2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–07832 Filed 4–3–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following joint stakeholder meeting
related to the transmission planning
activities of PJM Interconnection, L.L.C.
(PJM), Independent System Operator
New England, Inc. (ISO–NE), and New
York Independent System Operator, Inc.
(NYISO):
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Inter-Regional Planning Stakeholder
Advisory Committee—New York/New
England
April 3, 2013, 9:00 a.m.–12:00 p.m.,
Local Time
The above-referenced meeting will be
held over conference call.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.pjm.com/committees-and-groups/
stakeholder-meetings/stakeholdergroups/ipsac-ny-ne.aspx.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
VerDate Mar<15>2010
14:48 Apr 03, 2013
Jkt 229001
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–102–000, New York
Independent System Operator, Inc.
Docket No. ER13–193–000, ISO New
England Inc.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–196–000, ISO New
England Inc.
Docket No. ER13–198, PJM
Interconnection, L.L.C
Docket No. ER13–397, PJM
Interconnection, L.L.C.
Docket No. ER13–673, PJM
Interconnection, L.L.C
Docket No. ER13–703, PJM
Interconnection, L.L.C.
Docket No. ER13–887, PJM
Interconnection, L.L.C.
Docket No. ER13–1052, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER13–1054, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
For more information, contact
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: March 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07793 Filed 4–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket Nos. CP07–52–000; CP07–53–000;
CP07–53–001]
Downeast LNG, Inc., Downeast
Pipeline, LLC.; Notice of Availability of
the Supplemental Draft Environmental
Impact Statement for the Proposed
Downeast LNG Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a
Supplemental Draft Environmental
Impact Statement (EIS) for the Downeast
LNG Project, proposed by Downeast
LNG, Inc. and Downeast Pipeline, LLC
(hereafter collectively referred to as
Downeast) in the above-referenced
dockets. Downeast requests
authorization to construct and operate a
new liquefied natural gas (LNG) import
terminal, natural gas pipeline, and
associated facilities in Washington
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
County, Maine. The Downeast LNG
Project would provide about 500 million
cubic feet per day of imported natural
gas to the New England region.
The Commission previously issued a
draft EIS for this project in May 2009.
Since then the U.S. Department of
Transportation (DOT) has issued
clarifications on its Title 49 of the Code
of Federal Regulations (CFR), Part 193,
which are relevant to the proposed
Downeast LNG Project. In October 2011,
DOT issued final decisions approving
specific alternative models for use in
complying with these federal safety
standards. Downeast filed information
with the FERC as required by the latest
DOT interpretations in October and
November 2012. In 2010, the U.S. Coast
Guard (Coast Guard) revised its
regulations in Title 33, CFR, Part 127 on
the process used to examine the
suitability of the waterway for LNG
carrier transits. In 2011, the Coast Guard
also updated Navigation and Vessel
Inspection Circular 01–2011, ‘‘Guidance
Related to Waterfront LNG Facilities.’’
In 2012, the U.S. Department of Energy
(DOE) released the report ‘‘Liquefied
Natural Gas Safety Research Report to
Congress’’ detailing the results of
research conducted by Sandia National
Laboratories on intentional breaches of
LNG carrier cargo tanks and the
resulting LNG spills on water.
Based on the new information from
the DOT, DOE, Coast Guard, and
Downeast, FERC staff revised the
reliability and safety analysis of the
LNG terminal and carrier transit that
was presented in the May 2009 draft EIS
and prepared the Supplemental draft
EIS. This document presents FERC
staff’s: technical review of the proposed
facility’s preliminary design; siting
analysis, prepared with the cooperation
of the DOT; and conclusions on the
waterway suitability based on input
from the Coast Guard. The DOT
participated as a cooperating agency in
the preparation of the Supplemental
draft EIS.
We 1 mailed copies of the
Supplemental draft EIS to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
Paper copy versions of the Supplement
to the draft EIS were mailed to those
specifically requesting them; all others
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 78, Number 65 (Thursday, April 4, 2013)]
[Notices]
[Page 20312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07793]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
joint stakeholder meeting related to the transmission planning
activities of PJM Interconnection, L.L.C. (PJM), Independent System
Operator New England, Inc. (ISO-NE), and New York Independent System
Operator, Inc. (NYISO):
Inter-Regional Planning Stakeholder Advisory Committee--New York/New
England
April 3, 2013, 9:00 a.m.-12:00 p.m., Local Time
The above-referenced meeting will be held over conference call.
The above-referenced meeting is open to stakeholders.
Further information may be found at www.pjm.com/committees-and-groups/stakeholder-meetings/stakeholder-groups/ipsac-ny-ne.aspx.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER11-1844, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13-102-000, New York Independent System Operator, Inc.
Docket No. ER13-193-000, ISO New England Inc.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-196-000, ISO New England Inc.
Docket No. ER13-198, PJM Interconnection, L.L.C
Docket No. ER13-397, PJM Interconnection, L.L.C.
Docket No. ER13-673, PJM Interconnection, L.L.C
Docket No. ER13-703, PJM Interconnection, L.L.C.
Docket No. ER13-887, PJM Interconnection, L.L.C.
Docket No. ER13-1052, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
Docket No. ER13-1054, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
For more information, contact Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.
Dated: March 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-07793 Filed 4-3-13; 8:45 am]