Free Flow Power Iowa 1, LLC; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 20101 [2013-07680]
Download as PDF
Federal Register / Vol. 78, No. 64 / Wednesday, April 3, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP12–514–000]
Tennessee Gas Pipeline Company,
LLC; Notice of Technical Conference
The Commission’s January 17, 2013
Order in the above-captioned
proceeding 1 directed that a technical
conference be held to address issues
raised by Tennessee Gas Pipeline
Company, LLC’s filing to modify the
secondary in-the-path scheduling
priority provisions of its FERC Gas
Tariff.
Take notice that a technical
conference will be held on Wednesday,
April 10, 2013 at 10:00 a.m., in a room
to be designated at the offices of the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a fax to 202–208–2106
with the required accommodations.
All interested persons and staff are
permitted to attend. For further
information please contact David
Maranville at (202) 502–6351 or email
David.Maranville@ferc.gov.
Dated: March 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07677 Filed 4–2–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13438–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
Free Flow Power Iowa 1, LLC; Notice
of Successive Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 2, 2013, Free Flow Power
Iowa 1, LLC (FFP Iowa) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Mississippi Lock and
Dam 12 Water Power Project
(Mississippi L+D 12 Project or project)
to be located at the existing U. S. Army
1 Texas
Eastern Transmission, LP, 129 FERC ¶
61,088 (2009).
VerDate Mar<15>2010
17:13 Apr 02, 2013
Jkt 229001
Corps of Engineers (Corps) Mississippi
River Lock and Dam No. 12 on the
Mississippi River near the City of
Bellevue, Jackson County, Iowa. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following new facilities: (1) A
powerhouse located at the east end of
the movable section of the dam and
containing six horizontal bulb turbines
with a total nameplate capacity of 17.06
megawatts; (2) a 69-kilovolt, 4,940-footlong overhead transmission line
connecting the project generation with
Alliant Energy transmission facilities;
and (3) appurtenant facilities. The
majority of the project would be located
on lands owned by the United States
government and operated by the United
States Army Corps of Engineers. The
estimated annual generation of the
Mississippi L+D 12 Project would be
85.4 gigawatt-hours.
Applicant Contact: Daniel Lissner,
Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA
02114; phone: (978) 252–7111.
FERC Contact: Sergiu Serban; phone:
(202) 502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
20101
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13438) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07680 Filed 4–2–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2003–0004; FRL–9382–4]
Access to Confidential Business
Information by Chemical Abstract
Services
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA expects to authorize its
contractor, Chemical Abstract Services
(CAS) of Columbus, Ohio, to access
information which has been submitted
to EPA under sections 5 and 8 of the
Toxic Substances Control Act (TSCA).
Some of the information may be claimed
or determined to be Confidential
Business Information (CBI).
DATES: Access to the confidential data
occurred on or about April 1, 2013.
FOR FURTHER INFORMATION CONTACT: For
technical information contact: Scott
Sherlock, Environmental Assistance
Division (7408M), Office of Pollution
Prevention and Toxics, Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460–
0001; telephone number: (202) 564–
8257; fax number: (202) 564–8251;
email address: sherlock.scott@epa.gov.
For general information contact:
Colby Lintner, Regulatory Coordinator,
Environmental Assistance Division
(7408M), Office of Pollution Prevention
and Toxics, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20460; telephone
number: (202) 564–1404; email address:
TSCA-Hotline@epa.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. General Information
A. Does this notice apply to me?
This action is directed to the public
in general. This action may, however, be
of interest to all who manufacture,
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 78, Number 64 (Wednesday, April 3, 2013)]
[Notices]
[Page 20101]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07680]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13438-002]
Free Flow Power Iowa 1, LLC; Notice of Successive Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On January 2, 2013, Free Flow Power Iowa 1, LLC (FFP Iowa) filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Mississippi Lock and Dam 12 Water Power Project (Mississippi L+D 12
Project or project) to be located at the existing U. S. Army Corps of
Engineers (Corps) Mississippi River Lock and Dam No. 12 on the
Mississippi River near the City of Bellevue, Jackson County, Iowa. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following new facilities:
(1) A powerhouse located at the east end of the movable section of the
dam and containing six horizontal bulb turbines with a total nameplate
capacity of 17.06 megawatts; (2) a 69-kilovolt, 4,940-foot-long
overhead transmission line connecting the project generation with
Alliant Energy transmission facilities; and (3) appurtenant facilities.
The majority of the project would be located on lands owned by the
United States government and operated by the United States Army Corps
of Engineers. The estimated annual generation of the Mississippi L+D 12
Project would be 85.4 gigawatt-hours.
Applicant Contact: Daniel Lissner, Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA 02114; phone: (978) 252-7111.
FERC Contact: Sergiu Serban; phone: (202) 502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13438) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-07680 Filed 4-2-13; 8:45 am]
BILLING CODE 6717-01-P