Environmental Impacts Statements; Notice of Availability, 19261 [2013-07373]
Download as PDF
Federal Register / Vol. 78, No. 61 / Friday, March 29, 2013 / Notices
RFS industry will submitt petitions for
renewable fuel pathways to seek
approval. The number in the respondent
universe will decreased in all categories
for the parties thus lessoning the
reporting burden for its members.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013–07386 Filed 3–28–13; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9008–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 03/18/2013 Through 03/22/2013
Pursuant to 40 CFR 1506.9.
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html
EIS No. 20130072, Final EIS, FHWA,
AR, River Valley Intermodal
Facilities, Review Period Ends: 05/13/
2013, Contact: Randal Looney 501–
324–6430.
EIS No. 20130073, Draft Supplement,
NRC, WY Ross In-Situ Leach Recovery
(ISR) Project, Supplement to the
Generic Environmental Impact
Statement for In-Situ Leach Uranium
Milling Facilities, Comment Period
Ends: 05/13/2013, Contact: Johari
Moore 301–415–7694.
EIS No. 20130074, Draft Supplement,
FHWA, USACE, WV, King Coal
Highway Delbarton to Belo Project
and Buffalo Mountain Surface Mine
Clean Water Act Section 404 Permit
Application, Comment Period Ends:
05/22/2013, Contact: Jason Workman
(FHWA) 304–347–5928, Mark Taylor
(USACE) 304–399–5610, Ben Hark
(WVDOT) 304–558–2885.
The U.S. Department of
Transportation’s Federal Highway
Administration and the U.S. Department
of the Army’s Corps of Engineers and
the West Virginia Department of
Transportation’s Division of Highways
are Joint-Lead Agencies for this project.
VerDate Mar<15>2010
17:34 Mar 28, 2013
Jkt 229001
EIS No. 20130075, Draft Supplement,
NMFS, AK, Effects of Oil and Gas
Activities in the Arctic Ocean,
Comment Period Ends: 05/28/2013,
Contact: Candace Nachman 301–427–
8401.
EIS No. 20130076, Draft EIS, USFS, AZ,
Four-Forest Restoration Initiative
Coconino and Kaibab National
Forests, Comment Period Ends: 05/29/
2013, Contact: Henry Provencio (928)
226–4684.
EIS No. 20130077, Draft EIS, NPS, TX,
Lake Meredith National Recreation
Area and Alibates Flint Quarries
National Monument Draft General
Management Plan, Comment Period
Ends: 05/28/2013, Contact: Erin
Flanagan 303–969–2327.
EIS No. 20130078, Final EIS, USFS, MT,
Jack Rabbit to Big Sky Meadow
Village 161 kV Transmission Line
Upgrade, Review Period Ends: 04/29/
2013, Contact: Amy Waring 406–255–
1451.
EIS No. 20130079, Draft EIS, BLM, MT,
Billings and Pompeys Pillar National
Monument Resource Management
Plan, Comment Period Ends: 06/27/
2013, Contact: Carolyn Sherve-Bybee
406–896–5234.
Dated: March 26, 2013.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2013–07373 Filed 3–28–13; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
Safe Drinking Water Act Sole Source
Aquifer Program; Designation of
Bainbridge Island, Washington as a
Sole Source Aquifer
Environmental Protection
Agency (EPA).
ACTION: Final determination.
AGENCY:
SUMMARY: Notice is hereby given that
pursuant to Section 1424(e) of the Safe
Drinking Water Act, the Administrator
of the U.S. Environmental Protection
Agency (EPA) has determined that the
Bainbridge Island Aquifer System
located in Kitsap County, Washington is
the sole or principle source of drinking
water for the citizens of Bainbridge
Island and that this aquifer system, if
contaminated would create a significant
hazard to public health. As a result of
this action, all Federal financially
assisted projects constructed on
Bainbridge Island will be subject to EPA
review to ensure that these projects are
designed and constructed so they do not
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
19261
create a significant hazard to public
health.
DATES: This determination shall be
effective on March 29, 2013.
ADDRESSES: All documents relating to
this determination are available for
inspection by the public during normal
business hours at the U.S. EPA Library,
Region 10, 1200 Sixth Avenue, Seattle,
Washington 98101 between the hours of
9:00 a.m.–12:00 p.m. and 1:00–4:00 p.m.
and at the Bainbridge Island library at
1270 Madison Avenue North,
Bainbridge Island.
FOR FURTHER INFORMATION CONTACT:
Susan Eastman, EPA Region 10,
Drinking Water Unit, by mail at the
Seattle address given above, by
telephone at (206) 553–6249, or by
email at Eastman.susan@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
Section 1424(e) of the Safe Drinking
Water Act (42 U.S.C. 300h3(e), Public
Law 93–523 of December 16, 1974)
states:
If the Administrator determines, on his
own initiative or upon petition, that an area
has an aquifer which is the sole or principal
drinking water source for the area and which,
if contaminated, could create a significant
hazard to public health, he shall publish a
notice of the determination in the Federal
Register. After the publication of any such
notice, no commitment for Federal financial
assistance (through a grant, contract, loan
guarantee, or otherwise) may be entered into
for any project which the Administrator
determines may contaminate such aquifer
through a recharge zone so as to create a
significant hazard to public health, but a
commitment for Federal financial assistance
may, if authorized under another provision of
law, be entered into to plan or design the
project to assure that it will not so
contaminate the aquifer.
On August 5, 2009, EPA received a
petition from two citizens of Bainbridge
Island requesting designation of the
Bainbridge Island Aquifer System as a
Sole Source Aquifer (SSA). On April 20,
2012, EPA published a notice in the
Bainbridge Islander newspaper and
mailed fact sheets to island residents
which served to announce the public
comment period. The public was
permitted to submit comments and
information on the petition from April
20 through June 4, 2012. Public
comments received by EPA were
generally in support of the designation.
II. Basis for Determination
EPA defines a sole or principle source
aquifer as an aquifer or aquifer system
which supplies at least 50 percent of the
drinking water consumed in the area
overlying the aquifer, and for which
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 78, Number 61 (Friday, March 29, 2013)]
[Notices]
[Page 19261]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07373]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9008-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 03/18/2013 Through 03/22/2013
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html
EIS No. 20130072, Final EIS, FHWA, AR, River Valley Intermodal
Facilities, Review Period Ends: 05/13/2013, Contact: Randal Looney 501-
324-6430.
EIS No. 20130073, Draft Supplement, NRC, WY Ross In-Situ Leach Recovery
(ISR) Project, Supplement to the Generic Environmental Impact Statement
for In-Situ Leach Uranium Milling Facilities, Comment Period Ends: 05/
13/2013, Contact: Johari Moore 301-415-7694.
EIS No. 20130074, Draft Supplement, FHWA, USACE, WV, King Coal Highway
Delbarton to Belo Project and Buffalo Mountain Surface Mine Clean Water
Act Section 404 Permit Application, Comment Period Ends: 05/22/2013,
Contact: Jason Workman (FHWA) 304-347-5928, Mark Taylor (USACE) 304-
399-5610, Ben Hark (WVDOT) 304-558-2885.
The U.S. Department of Transportation's Federal Highway
Administration and the U.S. Department of the Army's Corps of Engineers
and the West Virginia Department of Transportation's Division of
Highways are Joint-Lead Agencies for this project.
EIS No. 20130075, Draft Supplement, NMFS, AK, Effects of Oil and Gas
Activities in the Arctic Ocean, Comment Period Ends: 05/28/2013,
Contact: Candace Nachman 301-427-8401.
EIS No. 20130076, Draft EIS, USFS, AZ, Four-Forest Restoration
Initiative Coconino and Kaibab National Forests, Comment Period Ends:
05/29/2013, Contact: Henry Provencio (928) 226-4684.
EIS No. 20130077, Draft EIS, NPS, TX, Lake Meredith National Recreation
Area and Alibates Flint Quarries National Monument Draft General
Management Plan, Comment Period Ends: 05/28/2013, Contact: Erin
Flanagan 303-969-2327.
EIS No. 20130078, Final EIS, USFS, MT, Jack Rabbit to Big Sky Meadow
Village 161 kV Transmission Line Upgrade, Review Period Ends: 04/29/
2013, Contact: Amy Waring 406-255-1451.
EIS No. 20130079, Draft EIS, BLM, MT, Billings and Pompeys Pillar
National Monument Resource Management Plan, Comment Period Ends: 06/27/
2013, Contact: Carolyn Sherve-Bybee 406-896-5234.
Dated: March 26, 2013.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2013-07373 Filed 3-28-13; 8:45 am]
BILLING CODE 6560-50-P