Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 19259-19260 [2013-07301]
Download as PDF
Federal Register / Vol. 78, No. 61 / Friday, March 29, 2013 / Notices
Applicant Contact: Mr. Dennis Ryan,
Executive Director, ECOsponsible, Inc.,
120 Mitchell Road Ste 100, Ease Aurora,
New York 14052; phone: (716) 655–
3524.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14482) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07300 Filed 3–28–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
VerDate Mar<15>2010
17:34 Mar 28, 2013
Jkt 229001
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
• March 28, 2013 (Wilmington, DE)
• April 25, 2013 (Wilmington, DE)
• May 16, 2013 (White Sulphur
Springs, West VA)
Date To Be Determined
• June 27, 2013 (Wilmington, DE)
• August 1, 2013 (Wilmington, DE)
• September 26, 2013 (Wilmington,
DE)
• October 24, 2013 (Wilmington, DE)
• December 5, 2013 (Wilmington, DE)
PJM Markets and Reliability Committee
• March 28, 2013 (Wilmington, DE)
• April 25, 2013 (Wilmington, DE)
• May 30, 2013 (Wilmington, DE)
• June 27, 2013 (Wilmington, DE)
• August 1, 2013 (Wilmington, DE)
• August 29, 2013 (Wilmington, DE)
• September 26, 2013 (Wilmington,
DE)
• October 24, 2013 (Wilmington, DE)
• December 5, 2013 (Wilmington, DE)
PJM Market Implementation Committee
• April 10, 2013 (Norristown, PA)
• May 8, 2013 (Norristown, PA)
• June 5, 2013 (Norristown, PA)
• July 10, 2013 (Norristown, PA)
• August 7, 2013 (Norristown, PA)
• September 11, 2013 (Norristown,
PA)
• October 9, 2013 (Norristown, PA)
• November 6, 2013 (Norristown, PA)
• December 11, 2013 (Norristown,
PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL08–14, Black Oak
Energy LLC, et al., v. FERC
Docket No. EL10–52, Central
Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
L.L.C.
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
19259
Docket Nos. ER09–1589 and EL10–6,
FirstEnergy Service Company
Docket Nos. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc
Docket Nos. ER11–2183 and EL11–32,
American Electric Power Service
Corporation
Docket Nos. ER11–2814 and ER11–
2815, PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket No. ER11–4106, PJM
Interconnection, L.L.C.
Docket No. ER11–4628, PJM
Interconnection, L.L.C.
Docket No. EL12–8, DC Energy, L.L.C.
and DC Energy Mid-Atlantic, L.L.C. vs.
PJM Interconnection, L.L.C.
Docket No. EL12–54, Viridity Energy,
Inc. v. PJM Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. AD12–1 and ER11–4081,
Midwest Independent Transmission
System Operator, Inc.
Docket No. AD12–16, Capacity
Deliverability Across the Midwest
Independent
Transmission System Operator, Inc./
PJM Interconnection, L.L.C. Seam
Docket No. EL13–10, North American
Natural Resources, Inc. v. PJM
Interconnection, L.L.C. et. al.
Docket No. ER12–91, PJM
Interconnection, L.L.C.
Docket No. ER12–92, PJM
Interconnection, L.L.C., et al.
Docket No. ER12–513, PJM
Interconnection, L.L.C.
Docket No. ER12–1173, PJM
Interconnection, L.L.C., et al.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER12–1204, PJM
Interconnection, L.L.C.
Docket No. ER12–1761, PJM
Interconnection, L.L.C.
Docket No. ER12–2274, Public Service
Electric and Gas Company
Docket No. ER12–2391, PJM
Interconnection, L.L.C.
Docket No. ER12–2399, PJM
Interconnection, L.L.C.
Docket No. ER12–2708, PJM
Interconnection, L.L.C.
Docket No. EL13–47, FirstEnergy
Solutions Corporation v. PJM
Interconnection, L.L.C. et al.
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER13–232, American
Electric Power Service Corporation
E:\FR\FM\29MRN1.SGM
29MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
19260
Federal Register / Vol. 78, No. 61 / Friday, March 29, 2013 / Notices
Docket No. ER13–233, American
Electric Power Service Corporation
Docket No. ER13–234, American
Electric Power Service Corporation
Docket No. ER13–235, American
Electric Power Service Corporation
Docket No. ER13–236, American
Electric Power Service Corporation
Docket No. ER13–237, American
Electric Power Service Corporation
Docket No. ER13–238, American
Electric Power Service Corporation
Docket No. ER13–239, American
Electric Power Service Corporation
Docket No. ER13–240, American
Electric Power Service Corporation
Docket No. ER13–347, PJM
Interconnection, L.L.C.
Docket No. ER13–397, PJM
Interconnection, L.L.C.
Docket No. ER13–486, PJM
Interconnection, L.L.C.
Docket No. ER13–535, PJM
Interconnection, L.L.C.
Docket No. ER13–539. PJM
Interconnection, L.L.C., et al.
Docket No. ER13–694, PJM
Interconnection, L.L.C.
Docket No. ER13–703, PJM
Interconnection, L.L.C.
Docket No. ER13–793, Eastern
Kentucky Power Cooperative
Docket No. ER13–887, PJM
Interconnection, L.L.C.
Docket No. ER13–1018, Brandon
Shores LLC and C.P. Crane LLC
Docket No. ER13–1023, PJM
Interconnection, L.L.C.
Docket No. ER13–1025, Calpine
Energy Services LP
Docket No. ER13–1033, Linden VFT,
LLC and PJM Interconnection, L.L.C.
Docket No. ER13–1044, PJM
Interconnection, L.L.C.
Docket No. ER13–1051, Linden VFT,
LLC.
Docket No. ER13–1052, PJM
Interconnection, L.L.C. and the Midwest
Independent Transmission System
Operator, Inc.
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: March 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07301 Filed 3–28–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:34 Mar 28, 2013
Jkt 229001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ –OAR–2005–0161; FRL 9529–8]
number: 202–343–9017 fax number:
202–343–2800; email address:
heard.geanetta@epa.gov.
SUPPLEMENTARY INFORMATION:
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request;
Renewable Fuels Standard Program
(RFS2—Supplemental) (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The Environmental Protection
Agency has submitted an information
collection request (ICR), ‘‘Renewable
Fuels Standard Program (RFS2—
Supplemental)’’ (EPA ICR No. 2380.02,
OMB Control No. 2060–0637) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act (44 U.S.C. 3501 et seq.).
This is a proposed extension of the ICR,
which is currently approved through
March 31, 2013. Public comments were
previously requested via the Federal
Register (77 FR 69620) on November 20,
2012 during a 60-day comment period.
This notice allows for an additional 30
days for public comments. A fuller
description of the ICR is given below,
including its estimated burden and cost
to the public. An Agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
DATES: Additional comments may be
submitted on or before April 29, 2013.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OAR–2005–0161, to (1) EPA online
using www.regulations.gov (our
preferred method), by email to a-and-rDocket@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW.,
Washington, DC 20460, and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Geanetta Heard, Fuels Compliance
Center, 6406J Environmental Protection
Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20460; telephone
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
Supporting documents, which explain
in detail the information EPA will be
collecting, are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
EPA West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Abstract: EPA will continue to collect
annual reports, initial registrations and
updates by way of the Agency’s CDX
and petitions for renewable fuels
pathways from the regulated renewable
fuels industry. The recordkeeping and
reporting of this regulation will allow
EPA to monitor compliance with the
RFS program. We inform respondents
that they may assert claims of business
confidentiality (CBI) for information
they submit in accordance with 40 CFR
Part 2.
Forms: All of the forms associated
with this ICR may be found in the
associated docket (Docket ID EPA–HQ
–OAR–2005–0161).
Respondents/affected entities:
Producers of Renewable Fuels,
Importers, Obligated Parties, Parties
who own renewable identification
numbers (RINs), including foreign RIN
owners
Respondent’s obligation to respond:
Mandatory under the Clean Air Act,
Sections 114 and 208, 42 U.S.C. 7414
and 7542.
Estimated number of respondents:
1192.
Frequency of response: Annually.
Total estimated burden: 15,707 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $ 3,039,221 (per
year) in labor costs. There are no capital
or O&M costs.
Changes in the Estimates: There is a
sharp decrease of 43,026 hours in the
total estimated respondent burden
compared to the ICR currently approved
by OMB. This decrease was caused by
members in the obligated parties once
registered not being required to reregister their companies in this renewal.
New registrations are required if a
company aquires another or when a new
company enters into a party. The
requirements of the current members in
the party classes are to submit updates
and corrections to their current
registration when needed in CDX. The
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 78, Number 61 (Friday, March 29, 2013)]
[Notices]
[Pages 19259-19260]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07301]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, L.L.C. Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and
Markets and Reliability Committee meetings, as well as other PJM
committee, subcommittee or task force meetings.\1\ The Commission and
Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM Web site.
---------------------------------------------------------------------------
PJM Members Committee
March 28, 2013 (Wilmington, DE)
April 25, 2013 (Wilmington, DE)
May 16, 2013 (White Sulphur Springs, West VA)
Date To Be Determined
June 27, 2013 (Wilmington, DE)
August 1, 2013 (Wilmington, DE)
September 26, 2013 (Wilmington, DE)
October 24, 2013 (Wilmington, DE)
December 5, 2013 (Wilmington, DE)
PJM Markets and Reliability Committee
March 28, 2013 (Wilmington, DE)
April 25, 2013 (Wilmington, DE)
May 30, 2013 (Wilmington, DE)
June 27, 2013 (Wilmington, DE)
August 1, 2013 (Wilmington, DE)
August 29, 2013 (Wilmington, DE)
September 26, 2013 (Wilmington, DE)
October 24, 2013 (Wilmington, DE)
December 5, 2013 (Wilmington, DE)
PJM Market Implementation Committee
April 10, 2013 (Norristown, PA)
May 8, 2013 (Norristown, PA)
June 5, 2013 (Norristown, PA)
July 10, 2013 (Norristown, PA)
August 7, 2013 (Norristown, PA)
September 11, 2013 (Norristown, PA)
October 9, 2013 (Norristown, PA)
November 6, 2013 (Norristown, PA)
December 11, 2013 (Norristown, PA)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL08-14, Black Oak Energy LLC, et al., v. FERC
Docket No. EL10-52, Central Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline,
L.L.C.
Docket Nos. ER09-1589 and EL10-6, FirstEnergy Service Company
Docket Nos. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. ER11-1844, Midwest Independent Transmission System
Operator, Inc
Docket Nos. ER11-2183 and EL11-32, American Electric Power Service
Corporation
Docket Nos. ER11-2814 and ER11-2815, PJM Interconnection, L.L.C.
and American Transmission Systems, Inc.
Docket No. ER11-4106, PJM Interconnection, L.L.C.
Docket No. ER11-4628, PJM Interconnection, L.L.C.
Docket No. EL12-8, DC Energy, L.L.C. and DC Energy Mid-Atlantic,
L.L.C. vs. PJM Interconnection, L.L.C.
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection,
L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection,
L.L.C.
Docket No. AD12-1 and ER11-4081, Midwest Independent Transmission
System Operator, Inc.
Docket No. AD12-16, Capacity Deliverability Across the Midwest
Independent
Transmission System Operator, Inc./PJM Interconnection, L.L.C. Seam
Docket No. EL13-10, North American Natural Resources, Inc. v. PJM
Interconnection, L.L.C. et. al.
Docket No. ER12-91, PJM Interconnection, L.L.C.
Docket No. ER12-92, PJM Interconnection, L.L.C., et al.
Docket No. ER12-513, PJM Interconnection, L.L.C.
Docket No. ER12-1173, PJM Interconnection, L.L.C., et al.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER12-1204, PJM Interconnection, L.L.C.
Docket No. ER12-1761, PJM Interconnection, L.L.C.
Docket No. ER12-2274, Public Service Electric and Gas Company
Docket No. ER12-2391, PJM Interconnection, L.L.C.
Docket No. ER12-2399, PJM Interconnection, L.L.C.
Docket No. ER12-2708, PJM Interconnection, L.L.C.
Docket No. EL13-47, FirstEnergy Solutions Corporation v. PJM
Interconnection, L.L.C. et al.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. ER13-232, American Electric Power Service Corporation
[[Page 19260]]
Docket No. ER13-233, American Electric Power Service Corporation
Docket No. ER13-234, American Electric Power Service Corporation
Docket No. ER13-235, American Electric Power Service Corporation
Docket No. ER13-236, American Electric Power Service Corporation
Docket No. ER13-237, American Electric Power Service Corporation
Docket No. ER13-238, American Electric Power Service Corporation
Docket No. ER13-239, American Electric Power Service Corporation
Docket No. ER13-240, American Electric Power Service Corporation
Docket No. ER13-347, PJM Interconnection, L.L.C.
Docket No. ER13-397, PJM Interconnection, L.L.C.
Docket No. ER13-486, PJM Interconnection, L.L.C.
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. ER13-539. PJM Interconnection, L.L.C., et al.
Docket No. ER13-694, PJM Interconnection, L.L.C.
Docket No. ER13-703, PJM Interconnection, L.L.C.
Docket No. ER13-793, Eastern Kentucky Power Cooperative
Docket No. ER13-887, PJM Interconnection, L.L.C.
Docket No. ER13-1018, Brandon Shores LLC and C.P. Crane LLC
Docket No. ER13-1023, PJM Interconnection, L.L.C.
Docket No. ER13-1025, Calpine Energy Services LP
Docket No. ER13-1033, Linden VFT, LLC and PJM Interconnection,
L.L.C.
Docket No. ER13-1044, PJM Interconnection, L.L.C.
Docket No. ER13-1051, Linden VFT, LLC.
Docket No. ER13-1052, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
Valerie.Martin@ferc.gov.
Dated: March 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-07301 Filed 3-28-13; 8:45 am]