Federal Register / Vol. 78, No. 60 / Thursday, March 28, 2013 / Notices
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
VerDate Mar<15>2010
20:20 Mar 27, 2013
Jkt 229001
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: April 11, 2013.
Dated: March 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–07081 Filed 3–27–13; 8:45 am]
BILLING CODE 6717–01–P
18969
Description: Penalty Revenue
Crediting Report of Horizon Pipeline
Company, L.L.C.
Filed Date: 3/20/13.
Accession Number: 20130320–5049.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13–695–000.
Applicants: CenterPoint Energy Gas
Transmission Comp.
Description: CEGT LLC—Revenue
Crediting effective May 1, 2013 to be
effective 5/1/2013.
Filed Date: 3/20/13.
Accession Number: 20130320–5070.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13–696–000.
Applicants: East Tennessee Natural
Gas, LLC, Murray I and II LLC,
Oglethorpe Power Corporation.
Description: East Tennessee Natural
Gas, LLC, et al. submits Joint Petition for
Temporary Waivers, et al.
Filed Date: 3/20/13.
Accession Number: 20130320–5093.
Comments Due: 5 p.m. ET 3/26/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–692–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Negotiated Rate—
Tenaska LPS–RO to be effective 4/1/
2013.
Filed Date: 3/19/13.
Accession Number: 20130319–5086.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13–693–000.
Applicants: Northern Border Pipeline
Company.
Description: Compressor Usage
Surcharge 2013 to be effective 5/1/2013.
Filed Date: 3/20/13.
Accession Number: 20130320–5031.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13–694–000.
Applicants: Horizon Pipeline
Company, L.L.C.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Docket Numbers: RP13–527–001.
Applicants: Boardwalk Storage
Company, LLC.
Description: Correction Compliance
Filing to be effective 3/3/2013.
Filed Date: 3/20/13.
Accession Number: 20130320–5074.
Comments Due: 5 p.m. ET 3/27/13.
Docket Numbers: RP13–683–001.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Non-Conforming
Remediation Errata to be effective 4/15/
2013.
Filed Date: 3/20/13.
Accession Number: 20130320–5089.
Comments Due: 5 p.m. ET 4/1/13.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
E:\FR\FM\28MRN1.SGM
28MRN1
18970
Federal Register / Vol. 78, No. 60 / Thursday, March 28, 2013 / Notices
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: March 21, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–07218 Filed 3–27–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF12–8–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Trunkline LNG Company, LLC;
Trunkline LNG Export, LLC; Trunkline
Gas Company, LLC; Supplemental
Notice of Intent To Prepare an
Environmental Impact Statement for
the Planned Lake Charles Liquefaction
Project and Request for Comments on
Environmental Issues
As previously noticed on September
14, 2012, and supplemented herein, the
staff of the Federal Energy Regulatory
Commission (FERC or Commission) will
prepare an environmental impact
statement (EIS) that will discuss the
environmental impacts of the Lake
Charles Liquefaction Project involving
construction and operation of facilities
by Trunkline LNG Company, LLC;
Trunkline LNG Export, LLC; and
Trunkline Gas Company, LLC
(collectively referred to as Trunkline) in
Louisiana and Mississippi. The
Commission will use this EIS in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This Supplemental Notice of Intent
(NOI) announces the opening of a
second scoping period the Commission
will use to gather input from the public
and interested agencies on additional
pipeline, compression, and metering
facilities planned by Trunkline, which
will be included in the EIS. Your input
will help determine what issues need to
be evaluated in the EIS. Please note that
the scoping period will close on April
22, 2013.
This notice is being sent to the
Commission’s current environmental
mailing list for this project, including
the newly affected landowners along the
pipeline routes or near the aboveground
facilities. State and local government
representatives should notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
VerDate Mar<15>2010
20:20 Mar 27, 2013
Jkt 229001
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings in
accordance with state law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Summary of the Planned Project
As previously noticed, Trunkline
plans to expand its existing liquefied
natural gas (LNG) terminal in Calcasieu
Parish, Louisiana to liquefy natural gas
and export the LNG. The planned
facility would be capable of processing
approximately 2.4 billion cubic feet per
day of natural gas, and exporting
approximately 15 million metric tons of
LNG per year. In addition, in January
2013, Trunkline expanded its project to
include plans to construct and modify
certain pipeline facilities to supply
natural gas to the liquefaction facility.
The Lake Charles Liquefaction Project
would consist of the following:
• LNG facilities in Calcasieu Parish,
Louisiana, include:
Æ a new liquefaction facility
including three liquefaction trains (each
train contains metering and gas
treatment facilities, liquefaction and
refrigerant units, safety and control
systems, and associated infrastructure);
Æ modifications and upgrades at the
existing LNG terminal; and
Æ about 0.5 mile of 48-inch-diameter
feed gas line in Calcasieu Parish,
Louisiana to supply natural gas to the
liquefaction facility from existing gas
transmission pipelines.
• Pipeline facilities now included as
part of the project, include:
Æ an 11.6-mile-long, 36-inch-diameter
greenfield natural gas pipeline
(Mainline Connector) in Jefferson Davis
and Calcasieu Parishes, Louisiana;
Æ a 6.5-mile-long, 24-inch-diameter
natural gas pipeline loop 1 (Mainline
1 A pipeline ‘‘loop’’ is a segment of pipeline that
is installed adjacent to or in the vicinity of an
existing pipeline and connected to the existing
pipeline at both ends. A loop increases the volume
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
200–3 Loop Line) in Jefferson Davis and
Calcasieu Parishes, Louisiana; and
Æ ancillary facilities associated with
the pipeline.
• Compression and metering facilities
now included as part of the project,
include:
Æ a new 59,840-horsepower (hp)
compressor station (Compressor Station
203–A) in Calcasieu Parish, Louisiana;
Æ modifications to the existing
Longville Compressor Station in
Beauregard Parish, Louisiana, involving
retirement of an existing 3,000-hp unit
and installation of a new 15,000-hp
unit, as well as piping modifications to
make the station bi-directional;
Æ piping modifications at the existing
Pollock, Epps, and Shaw Compressor
Stations in Grant and West Carroll
Parishes, Louisiana and Bolivar County,
Mississippi, respectively, to make the
stations bi-directional;
Æ four new meter stations in
Calcasieu, Acadia, and Richland (2)
Parishes, Louisiana; and
Æ modifications to six existing meter
stations in Calcasieu, Jefferson Davis (2),
Cameron, and Beauregard (2) Parishes,
Louisiana to make the stations bidirectional.
Trunkline plans to initiate
construction of the planned liquefaction
facilities in August 2014, and
construction of the pipelines,
compressor stations, and metering
facilities are planned to take place in the
second and third quarters of 2017.
Trunkline plans to commence operation
of the planned facilities in August 2018.
The general location of the project
facilities is shown in appendices 1 and
2.2
Land Requirements for Construction
The planned liquefaction facilities
would be constructed on a 268-acre site
that is largely undeveloped and located
immediately north of and adjacent to
the existing LNG terminal. The majority
of the site would be required for both
construction and operation of the
facility. An additional 200-acre area, at
a location yet to be determined, would
be required during construction of the
liquefaction facilities for materials
storage and contractor facilities.
Modifications to take place at the
of gas that can be transported through that portion
of the system.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 78, Number 60 (Thursday, March 28, 2013)]
[Notices]
[Pages 18969-18970]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07218]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13-692-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Negotiated Rate--Tenaska LPS-RO to be effective 4/1/
2013.
Filed Date: 3/19/13.
Accession Number: 20130319-5086.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13-693-000.
Applicants: Northern Border Pipeline Company.
Description: Compressor Usage Surcharge 2013 to be effective 5/1/
2013.
Filed Date: 3/20/13.
Accession Number: 20130320-5031.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13-694-000.
Applicants: Horizon Pipeline Company, L.L.C.
Description: Penalty Revenue Crediting Report of Horizon Pipeline
Company, L.L.C.
Filed Date: 3/20/13.
Accession Number: 20130320-5049.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13-695-000.
Applicants: CenterPoint Energy Gas Transmission Comp.
Description: CEGT LLC--Revenue Crediting effective May 1, 2013 to
be effective 5/1/2013.
Filed Date: 3/20/13.
Accession Number: 20130320-5070.
Comments Due: 5 p.m. ET 4/1/13.
Docket Numbers: RP13-696-000.
Applicants: East Tennessee Natural Gas, LLC, Murray I and II LLC,
Oglethorpe Power Corporation.
Description: East Tennessee Natural Gas, LLC, et al. submits Joint
Petition for Temporary Waivers, et al.
Filed Date: 3/20/13.
Accession Number: 20130320-5093.
Comments Due: 5 p.m. ET 3/26/13.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13-527-001.
Applicants: Boardwalk Storage Company, LLC.
Description: Correction Compliance Filing to be effective 3/3/2013.
Filed Date: 3/20/13.
Accession Number: 20130320-5074.
Comments Due: 5 p.m. ET 3/27/13.
Docket Numbers: RP13-683-001.
Applicants: Columbia Gulf Transmission, LLC.
Description: Non-Conforming Remediation Errata to be effective 4/
15/2013.
Filed Date: 3/20/13.
Accession Number: 20130320-5089.
Comments Due: 5 p.m. ET 4/1/13.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://
[[Page 18970]]
www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information,
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: March 21, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-07218 Filed 3-27-13; 8:45 am]
BILLING CODE 6717-01-P