FFP Project 121, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 18335 [2013-06817]
Download as PDF
Federal Register / Vol. 78, No. 58 / Tuesday, March 26, 2013 / Notices
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14505) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–06818 Filed 3–25–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14504–000]
srobinson on DSK4SPTVN1PROD with NOTICES
FFP Project 121, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 1, 2013, FFP Project 121,
LLC filed an application for a
preliminary permit under section 4(f) of
the Federal Power Act proposing to
study the feasibility of the proposed
New Cumberland Locks and Dam
Hydroelectric Project No. 14504–000, to
be located at the existing New
Cumberland Locks and Dam on the
Ohio River, near the Town of Stratton,
in Jefferson County, Ohio and the Town
of New Cumberland, in Hancock
County, West Virginia. The New
Cumberland Locks and Dam is owned
by the United States government and
operated by the U.S. Corps of Engineers.
The proposed project would consist
of: (1) A new 250-foot-wide by 380-footlong forebay; (2) a new 220-foot by 250foot reinforced concrete powerhouse; (3)
three new 16.6 megawatt (MW)
horizontal bulb turbine-generators
having a total combined generating
capacity of 49.8 MW; (4) a new 300-footlong concrete retaining wall
downstream of the powerhouse; (5) a
new 300-foot-wide by 515-foot-long
tailrace area; (6) a new 60-foot-wide by
60-foot-long substation; (7) a new 0.8mile-long, 36.7-kilovolt transmission
line; and (8) appurtenant facilities. The
project would have an estimated annual
generation of 251,600 megawatt-hours.
Applicant Contact: Daniel Lissner,
239 Causeway Street, Suite 300, Boston,
MA 02114; (978) 252–7111.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
VerDate Mar<15>2010
19:07 Mar 25, 2013
Jkt 229001
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14504) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–06817 Filed 3–25–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Arizona Project-Rate Order No.
WAPA–158
Western Area Power
Administration, DOE.
ACTION: Notice of Extension of
Transmission Service Rate Schedules.
AGENCY:
SUMMARY: This action is to extend the
rate setting formula for the Central
Arizona Project, reflected in
Transmission Service Rate Schedules
CAP–FT2, CAP–NFT2, and CAP–NITS2,
from January 1, 2013, through December
31, 2015. These Transmission Service
Rate Schedules contain formula rates
recalculated from annual updated
financial and load data.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
18335
Mr.
Darrick Moe, Regional Manager, Desert
Southwest Customer Service Region,
Western Area Power Administration,
P.O. Box 6457, Phoenix, AZ 85005–
6457, (602) 605–2522, email
MOE@wapa.gov, or Mr. Jack Murray,
Rates Manager, Desert Southwest
Customer Service Region, Western Area
Power Administration, P.O. Box 6457,
Phoenix, AZ 85005–6457, (602) 605–
2442, email jmurray@wapa.gov.
SUPPLEMENTARY INFORMATION: By
Delegation Order No. 00–037.00,
effective December 6, 2001, the
Secretary of Energy delegated: (1) The
authority to develop power and
transmission rates to the Administrator
of Western Area Power Administration
(Western); (2) the authority to confirm,
approve, and place such rates into effect
on an interim basis to the Deputy
Secretary of Energy; and (3) the
authority to confirm, approve, and place
into effect on a final basis, to remand,
or to disapprove such rates to the
Federal Energy Regulatory Commission
(FERC).
The existing Rate Schedules CAP–
FT2, CAP–NFT2, CAP–NITS2 under
Rate Order No. WAPA–124,1 were
approved for a 5-year period beginning
on January 1, 2006, and ending
December 31, 2010.2 Rate Order No.
WAPA–153 3 extended the approval
period for these rate schedules for a
2-year period, beginning January 1,
2011, through December 31, 2012.
The existing Central Arizona Project
rate setting formula methodology
provides for the calculation of rates to
collect sufficient revenue to pay all
annual costs, including interest
expense, and repayment of required
investment thus ensuring repayment of
the project within the cost recovery
criteria set forth in DOE Order RA
6120.2. The rates are updated annually
using new financial and transmission
reservation data. For the reasons
explained in its Proposed Extension
WAPA–158, published in the Federal
Register on August 7, 2012 (77 FR
47065), Western is not changing the rate
formula at this time. Based on financial
and contractual information, Western
also determined that the existing
calculated rate provides sufficient
revenue to recover all appropriate costs
and will remain in place through
FOR FURTHER INFORMATION CONTACT:
1 FERC confirmed and approved Rate Order No.
WAPA–124 on June 29, 2006, in Docket No. EF06–
5111–000. See Order Confirming and Approving
Rate Schedules on a Final Basis, 115 FERC
¶ 62,326.70 FR 38,130 (July 1, 2005).
2 FERC confirmed and approved Rate Order No.
WAPA–124 on June 29, 2006, in Docket No. EF06–
5111–000, 115 FERC ¶ 62,326.
3 76 FR 548 (January 5, 2011).
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 78, Number 58 (Tuesday, March 26, 2013)]
[Notices]
[Page 18335]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-06817]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14504-000]
FFP Project 121, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 1, 2013, FFP Project 121, LLC filed an application for a
preliminary permit under section 4(f) of the Federal Power Act
proposing to study the feasibility of the proposed New Cumberland Locks
and Dam Hydroelectric Project No. 14504-000, to be located at the
existing New Cumberland Locks and Dam on the Ohio River, near the Town
of Stratton, in Jefferson County, Ohio and the Town of New Cumberland,
in Hancock County, West Virginia. The New Cumberland Locks and Dam is
owned by the United States government and operated by the U.S. Corps of
Engineers.
The proposed project would consist of: (1) A new 250-foot-wide by
380-foot-long forebay; (2) a new 220-foot by 250-foot reinforced
concrete powerhouse; (3) three new 16.6 megawatt (MW) horizontal bulb
turbine-generators having a total combined generating capacity of 49.8
MW; (4) a new 300-foot-long concrete retaining wall downstream of the
powerhouse; (5) a new 300-foot-wide by 515-foot-long tailrace area; (6)
a new 60-foot-wide by 60-foot-long substation; (7) a new 0.8-mile-long,
36.7-kilovolt transmission line; and (8) appurtenant facilities. The
project would have an estimated annual generation of 251,600 megawatt-
hours.
Applicant Contact: Daniel Lissner, 239 Causeway Street, Suite 300,
Boston, MA 02114; (978) 252-7111.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, and competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14504) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-06817 Filed 3-25-13; 8:45 am]
BILLING CODE 6717-01-P