Combined Notice of Filings, 17650 [2013-06598]

Download as PDF srobinson on DSK4SPTVN1PROD with NOTICES 17650 Federal Register / Vol. 78, No. 56 / Friday, March 22, 2013 / Notices forebay channel; (2) a new 75-foot-long by 50-foot-wide by 140-foot-high concrete intake; (3) a new 18-footdiameter by 75-foot-long concrete lined headrace tunnel; (4) a new18-footdiameter by 250-foot-long steel penstock; (5) three 10-foot-diameter, various-length pipelines that connects the penstock to the proposed turbines; (6) a new 120-foot-long by 70-foot-wide concrete powerhouse, containing three 4.8–MW Kaplan turbine-generators, with a combined nameplate capacity of 14.4 MW; (7) a new 275-foot-long by 190-foot-wide tailrace channel; (8) a new 60-foot-long by 50-foot-wide substation; (9) a new 4,950-foot-long, 69-kilovolt transmission line between the project substation to an interconnection point and a buried 1000-foot-long, 4.16-kV line from the powerhouse to the project substation; and (10) appurtenant facilities. The project would have an estimated annual generation of 45.3 gigawatt-hours. Applicant Contact: Ms. Ramya Swaminathan, 239 Causeway Street, Suite 300, Boston, MA 02114; (978) 283–2822. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of either application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14491 or P–13579) in the docket number field to access the document. VerDate Mar<15>2010 18:27 Mar 21, 2013 Jkt 229001 For assistance, contact FERC Online Support. Dated: March 15, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–06601 Filed 3–21–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–955–000. Applicants: CenterPoint Energy— Mississippi River T. Description: MRT Test Period Update Filing. Filed Date: 3/15/13. Accession Number: 20130315–5127. Comments Due: 5 p.m. ET 3/27/13. Docket Numbers: RP13–685–000. Applicants: Alliance Pipeline L.P. Description: March 19–31 2013 Auction to be effective 3/19/2013. Filed Date: 3/15/13. Accession Number: 20130315–5145. Comments Due: 5 p.m. ET 3/27/13. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP13–529–002. Applicants: Guardian Pipeline, L.L.C. Description: NAESB 2.0 Modification II to be effective 4/1/2013. Filed Date: 3/15/13. Accession Number: 20130315–5046. Comments Due: 5 p.m. ET 3/27/13. Docket Numbers: RP13–530–002. Applicants: Midwestern Gas Transmission Company. Description: NAESB 2.0 Modification II to be effective 4/1/2013. Filed Date: 3/15/13. Accession Number: 20130315–5045. Comments Due: 5 p.m. ET 3/27/13. Docket Numbers: RP13–531–002. Applicants: OkTex Pipeline Company, L.L.C. Description: NAESB 2.0 Modification II to be effective 4/1/2013. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Filed Date: 3/15/13. Accession Number: 20130315–5043. Comments Due: 5 p.m. ET 3/27/13. Docket Numbers: RP13–532–002. Applicants: Viking Gas Transmission Company. Description: NAESB 2.0 Modification II to be effective 4/1/2013. Filed Date: 3/15/13. Accession Number: 20130315–5033. Comments Due: 5 p.m. ET 3/27/13. Any person desiring to protest in any of the above proceedings must file in of accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated March 18, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–06598 Filed 3–21–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2238–004; ER10–2239–004; ER10–2237–003; ER10–1821–005; ER11–4475–005. Applicants: Indigo Generation LLC, Larkspur Energy LLC, Wildflower Energy LP, Goshen Phase II LLC, Rockland Wind Farm LLC. Description: Notice of Non-Material Change in Status of the DGC Companies. Filed Date: 3/14/13. Accession Number: 20130314–5184. Comments Due: 5 p.m. ET 4/4/13. Docket Numbers: ER13–633–001. Applicants: Public Service Company of Colorado. Description: Public Service Company of Colorado submits 2013–03–15–NSP– BARRON-Tran-to Load-543 to be effective 1/1/2013. Filed Date: 3/15/13. Accession Number: 20130315–5070. Comments Due: 5 p.m. ET 4/5/13. E:\FR\FM\22MRN1.SGM 22MRN1

Agencies

[Federal Register Volume 78, Number 56 (Friday, March 22, 2013)]
[Notices]
[Page 17650]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-06598]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP12-955-000.
    Applicants: CenterPoint Energy--Mississippi River T.
    Description: MRT Test Period Update Filing.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5127.
    Comments Due: 5 p.m. ET 3/27/13.

    Docket Numbers: RP13-685-000.
    Applicants: Alliance Pipeline L.P.
    Description: March 19-31 2013 Auction to be effective 3/19/2013.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5145.
    Comments Due: 5 p.m. ET 3/27/13.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP13-529-002.
    Applicants: Guardian Pipeline, L.L.C.
    Description: NAESB 2.0 Modification II to be effective 4/1/2013.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5046.
    Comments Due: 5 p.m. ET 3/27/13.

    Docket Numbers: RP13-530-002.
    Applicants: Midwestern Gas Transmission Company.
    Description: NAESB 2.0 Modification II to be effective 4/1/2013.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5045.
    Comments Due: 5 p.m. ET 3/27/13.

    Docket Numbers: RP13-531-002.
    Applicants: OkTex Pipeline Company, L.L.C.
    Description: NAESB 2.0 Modification II to be effective 4/1/2013.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5043.
    Comments Due: 5 p.m. ET 3/27/13.

    Docket Numbers: RP13-532-002.
    Applicants: Viking Gas Transmission Company.
    Description: NAESB 2.0 Modification II to be effective 4/1/2013.
    Filed Date: 3/15/13.
    Accession Number: 20130315-5033.
    Comments Due: 5 p.m. ET 3/27/13.

    Any person desiring to protest in any of the above proceedings must 
file in of accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, and service can be found at: 
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other 
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.

    Dated March 18, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-06598 Filed 3-21-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.