Drawbridge Operation Regulations; Saugatuck River, Westport, CT, 16411 [2013-06027]
Download as PDF
Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Rules and Regulations
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Burlington County Bridge Commission,
who owns and operates this bascule
drawbridge, has requested a temporary
deviation from the current operating
regulations set out in 33 CFR 117.5 and
117.716 to facilitate the replacement of
the bascule span deck.
The Tacony-Palmyra Bridge (Route
73) at mile 107.2, across the Delaware
River, between Pennsylvania and New
Jersey, has a vertical clearance in the
closed position to vessels of 53 feet
above mean high water (MHW). At no
time during this work will there be a
reduction in the vertical clearance.
Under this temporary deviation, the
replacement repairs will restrict the
operation of the draw span every day
from April 26, 2013, until May 11, 2013.
Vessel openings will be provided with
at least 12 hours advance notice given
to the bridge operator at (856) 829–3002
or via marine radio on Channel 13.
Vessels than can pass under the
bridge without a bridge opening may do
so at all times. There are no alternate
routes for vessels transiting this section
of the Delaware River.
The Coast Guard has coordinated this
deviation with the Delaware Pilots, and
will inform the users of the waterways
through our Local and Broadcast
Notices to Mariners of the closure
period for the bridge so that vessels can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 7, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District .
[FR Doc. 2013–06026 Filed 3–14–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
srobinson on DSK4SPTVN1PROD with RULES
Coast Guard
33 CFR Part 117
[USCG–2013–0131]
Drawbridge Operation Regulations;
Saugatuck River, Westport, CT
AGENCY:
Coast Guard, DHS.
VerDate Mar<14>2013
16:42 Mar 14, 2013
Jkt 229001
Notice of temporary deviation
from regulation.
ACTION:
SUMMARY: The United States Coast
Guard has issued a temporary deviation
from the regulation governing the
operation of the Route 136 Bridge across
the Saugatuck River, mile 1.3, at
Westport, Connecticut. The deviation is
necessary to facilitate emergency
repairs. Under this temporary deviation,
the bridge owner may require a 24 hour
advance notice for bridge openings.
DATES: This deviation is effective from
March 5, 2013, through May 3, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0131] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Route
136 Bridge has a vertical clearance of 6
feet at mean high water in the closed
position. The existing drawbridge
operating regulations are found at 33
CFR 117.221(c).
The bridge owner, Connecticut
Department of Transportation, requested
a 24 hour advance notice requirement
for bridge openings to facilitate
emergency repairs to the mechanical
and electrical components at the bridge.
The emergency repairs are necessary
to repair storm damage from Hurricane
Sandy. The bridge has been operating
manually since it sustained damage
from the storm.
Under this temporary deviation, at
least a 24 hour advance notice shall be
required for bridge openings at the
Route 136 Bridge, mile 1.3, across the
Saugatuck River at Westport,
Connecticut, from March 5, 2013,
through May 3, 2013.
The Saugatuck River is predominantly
a recreational waterway. The bridge
rarely opens during the time period this
temporary deviation will be in effect.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
PO 00000
Frm 00013
Fmt 4700
Sfmt 4700
16411
operating schedule immediately at the
end of the designated repair period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: March 5, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–06027 Filed 3–14–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0136]
Drawbridge Operation Regulation;
Upper Mississippi River, Rock Island,
IL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
SUMMARY: The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Rock Island
Railroad and Highway Drawbridge
across the Upper Mississippi River, mile
482.9, at Rock Island, Illinois. The
deviation is necessary to allow the Quad
City Heart Walk to cross the bridge. This
deviation allows the bridge to be
maintained in the closed-to-navigation
position for two hours.
DATES: This deviation is effective from
9 a.m. to 11 a.m. on May 18, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0136] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email
Eric.Washburn@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
E:\FR\FM\15MRR1.SGM
15MRR1
Agencies
[Federal Register Volume 78, Number 51 (Friday, March 15, 2013)]
[Rules and Regulations]
[Page 16411]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-06027]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0131]
Drawbridge Operation Regulations; Saugatuck River, Westport, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulation.
-----------------------------------------------------------------------
SUMMARY: The United States Coast Guard has issued a temporary deviation
from the regulation governing the operation of the Route 136 Bridge
across the Saugatuck River, mile 1.3, at Westport, Connecticut. The
deviation is necessary to facilitate emergency repairs. Under this
temporary deviation, the bridge owner may require a 24 hour advance
notice for bridge openings.
DATES: This deviation is effective from March 5, 2013, through May 3,
2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0131] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Barbara
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 136 Bridge has a vertical
clearance of 6 feet at mean high water in the closed position. The
existing drawbridge operating regulations are found at 33 CFR
117.221(c).
The bridge owner, Connecticut Department of Transportation,
requested a 24 hour advance notice requirement for bridge openings to
facilitate emergency repairs to the mechanical and electrical
components at the bridge.
The emergency repairs are necessary to repair storm damage from
Hurricane Sandy. The bridge has been operating manually since it
sustained damage from the storm.
Under this temporary deviation, at least a 24 hour advance notice
shall be required for bridge openings at the Route 136 Bridge, mile
1.3, across the Saugatuck River at Westport, Connecticut, from March 5,
2013, through May 3, 2013.
The Saugatuck River is predominantly a recreational waterway. The
bridge rarely opens during the time period this temporary deviation
will be in effect.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
repair period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 5, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-06027 Filed 3-14-13; 8:45 am]