Placer County Water Agency; Notice of Authorization for Continued Project Operation, 16490-16491 [2013-05950]

Download as PDF 16490 Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting, or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by a proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: March 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–05946 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2309–000] srobinson on DSK4SPTVN1PROD with NOTICES Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued Project Operation On February 18, 2011, the Jersey Central Power and Light Company and PSEG Fossil LLC, licensees for the Yards Creek Pumped Storage Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Yards Creek Pumped Storage Hydroelectric Project is located on VerDate Mar<14>2013 17:37 Mar 14, 2013 Jkt 229001 Yards Creek, in the townships of Hardwick and Blairstown, Warren County, New Jersey. The license for Project No. 2309 was issued for a period ending February 28, 2013. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensees under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensees of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2309 is issued to the licensees for a period effective March 1, 2013 through February 28, 2014 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 28, 2014, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensees are authorized to continue operation of the Yards Creek Pumped Storage Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: March 7, 2013. Kimberly D. Bose Secretary. [FR Doc. 2013–05947 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2079–000] Placer County Water Agency; Notice of Authorization for Continued Project Operation On February 23, 2011, the Placer County Water Agency, licensee for the Middle Fork American River Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Middle Fork American River Hydroelectric Project is located on the Middle Fork American River and the Rubicon River and located in Placer and El Dorado Counties, almost entirely within the Tahoe and El Dorado National Forests. The license for Project No. 2079 was issued for a period ending February 28, 2013. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2079 is issued to the Placer County Water Agency for a period effective March 1, 2013 through February 28, 2014 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 28, 2014, notice is hereby given that, pursuant to 18 CFR 16.18(c), E:\FR\FM\15MRN1.SGM 15MRN1 Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the Placer County Water Agency is authorized to continue operation of the Middle Fork American River Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: March 7, 2013. Kimberly D. Bose Secretary. [FR Doc. 2013–05950 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: srobinson on DSK4SPTVN1PROD with NOTICES Filings Instituting Proceedings Docket Numbers: CP13–95–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: Transcontinental Gas Pipe Line Company, LLC submits an application for abandonment of service provided to Atmos Energy Corporation under Rate Schedule GSS. Filed Date: 3/5/13. Accession Number: 20130305–5158. Comments Due: 5 p.m. e.t. 3/14/13. Docket Numbers: RP13–671–000. Applicants: USG Pipeline Company, LLC. Description: Housekeeping tariff filing to be effective 4/4/2013. Filed Date: 3/5/13. Accession Number: 20130305–5158. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–672–000. Applicants: Columbia Gulf Transmission, LLC. Description: Name Conversion— Columbia Gulf Company to Columbia Gulf LLC to be effective 3/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5159. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–673–000. Applicants: B–R Pipeline Company. Description: Housekeeping tariff filing to be effective 3/4/2013. Filed Date: 3/5/13. Accession Number: 20130305–5160. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–674–000. Applicants: Ruby Pipeline, L.L.C. VerDate Mar<14>2013 17:37 Mar 14, 2013 Jkt 229001 Description: Tariff Updates and Housekeeping Filing to be effective 4/8/2013. Filed Date: 3/6/13. Accession Number: 20130306–5067. Comments Due: 5 p.m. e.t. 3/18/13. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP13–529–001. Applicants: Guardian Pipeline, L.L.C. Description: NAESB 2.0 Modification to be effective 4/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5129. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–530–001. Applicants: Midwestern Gas Transmission Company. Description: NAESB 2.0 Modification to be effective 4/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5124. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–531–001. Applicants: OkTex Pipeline Company, L.L.C. Description: NAESB 2.0 Modification to be effective 4/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5128. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–532–001. Applicants: Viking Gas Transmission Company. Description: NAESB 2.0 Modification to be effective 4/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5118. Comments Due: 5 p.m. e.t. 3/18/13. Docket Numbers: RP13–589–001. Applicants: Northwest Pipeline GP. Description: Rp13–589–001 Fuel Filing Amendment to be effective 4/1/2013. Filed Date: 3/5/13. Accession Number: 20130305–5157. Comments Due: 5 p.m. e.t. 3/14/13. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 16491 requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 7, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–05973 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC10–51–001. Applicants: T. Rowe Price Group, Inc. Description: T. Rowe Price Associates, Inc. et al (Primary Applicants) request for reauthorization and extension of Blanket Authorizations to acquire and dispose of securities pursuant to Section 203 of the Federal Power Act. Filed Date: 3/4/13. Accession Number: 20130305–0200. Comments Due: 5 p.m. e.t. 3/25/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–4267–005; ER11–4270–005; ER11–4269–006 ER11– 4268–005; ER11–113–006; ER10–2682– 005 ER12–1680–003; ER11–4694–002. Applicants: Algonquin Energy Services Inc., Algonquin Power Windsor Locks LLC, Algonquin Tinker Gen Co., Algonquin Northern Maine Gen Co., Sandy Ridge Wind, LLC, Granite State Electric Company, Minonk Wind, LLC, GSG 6, LLC. Description: Notice of Change in Status of Algonquin Energy Services Inc., et al. Filed Date: 3/5/13. Accession Number: 20130305–5182. Comments Due: 5 p.m. e.t. 3/26/13. Docket Numbers: ER13–1040–000. Applicants: Wisconsin Public Service Corporation. Description: Wisconsin Public Service Corporation Section 205 Filing to be effective 12/31/9998. Filed Date: 3/5/13. Accession Number: 20130305–5155. Comments Due: 5 p.m. e.t. 3/26/13. Docket Numbers: ER13–1041–000. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C. E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 78, Number 51 (Friday, March 15, 2013)]
[Notices]
[Pages 16490-16491]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05950]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2079-000]


Placer County Water Agency; Notice of Authorization for Continued 
Project Operation

    On February 23, 2011, the Placer County Water Agency, licensee for 
the Middle Fork American River Hydroelectric Project, filed an 
Application for a New License pursuant to the Federal Power Act (FPA) 
and the Commission's regulations thereunder. The Middle Fork American 
River Hydroelectric Project is located on the Middle Fork American 
River and the Rubicon River and located in Placer and El Dorado 
Counties, almost entirely within the Tahoe and El Dorado National 
Forests.
    The license for Project No. 2079 was issued for a period ending 
February 28, 2013. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2079 is issued to 
the Placer County Water Agency for a period effective March 1, 2013 
through February 28, 2014 or until the issuance of a new license for 
the project or other disposition under the FPA, whichever comes first. 
If issuance of a new license (or other disposition) does not take place 
on or before February 28, 2014, notice is hereby given that, pursuant 
to 18 CFR 16.18(c),

[[Page 16491]]

an annual license under section 15(a)(1) of the FPA is renewed 
automatically without further order or notice by the Commission, unless 
the Commission orders otherwise. If the project is not subject to 
section 15 of the FPA, notice is hereby given that the Placer County 
Water Agency is authorized to continue operation of the Middle Fork 
American River Hydroelectric Project, until such time as the Commission 
acts on its application for a subsequent license.

    Dated: March 7, 2013.
 Kimberly D. Bose
 Secretary.
[FR Doc. 2013-05950 Filed 3-14-13; 8:45 am]
BILLING CODE 6717-01-P