Placer County Water Agency; Notice of Authorization for Continued Project Operation, 16490-16491 [2013-05950]
Download as PDF
16490
Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting, or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by a proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: March 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–05946 Filed 3–14–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2309–000]
srobinson on DSK4SPTVN1PROD with NOTICES
Jersey Central Power and Light
Company, PSEG Fossil, LLC; Notice of
Authorization for Continued Project
Operation
On February 18, 2011, the Jersey
Central Power and Light Company and
PSEG Fossil LLC, licensees for the Yards
Creek Pumped Storage Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Yards Creek Pumped Storage
Hydroelectric Project is located on
VerDate Mar<14>2013
17:37 Mar 14, 2013
Jkt 229001
Yards Creek, in the townships of
Hardwick and Blairstown, Warren
County, New Jersey.
The license for Project No. 2309 was
issued for a period ending February 28,
2013. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensees
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensees of such
a project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2309
is issued to the licensees for a period
effective March 1, 2013 through
February 28, 2014 or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before February 28, 2014,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that the licensees are authorized
to continue operation of the Yards Creek
Pumped Storage Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: March 7, 2013.
Kimberly D. Bose
Secretary.
[FR Doc. 2013–05947 Filed 3–14–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2079–000]
Placer County Water Agency; Notice of
Authorization for Continued Project
Operation
On February 23, 2011, the Placer
County Water Agency, licensee for the
Middle Fork American River
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Middle Fork American River
Hydroelectric Project is located on the
Middle Fork American River and the
Rubicon River and located in Placer and
El Dorado Counties, almost entirely
within the Tahoe and El Dorado
National Forests.
The license for Project No. 2079 was
issued for a period ending February 28,
2013. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2079
is issued to the Placer County Water
Agency for a period effective March 1,
2013 through February 28, 2014 or until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first. If issuance
of a new license (or other disposition)
does not take place on or before
February 28, 2014, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
E:\FR\FM\15MRN1.SGM
15MRN1
Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise. If the project is not
subject to section 15 of the FPA, notice
is hereby given that the Placer County
Water Agency is authorized to continue
operation of the Middle Fork American
River Hydroelectric Project, until such
time as the Commission acts on its
application for a subsequent license.
Dated: March 7, 2013.
Kimberly D. Bose
Secretary.
[FR Doc. 2013–05950 Filed 3–14–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
srobinson on DSK4SPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: CP13–95–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Transcontinental Gas
Pipe Line Company, LLC submits an
application for abandonment of service
provided to Atmos Energy Corporation
under Rate Schedule GSS.
Filed Date: 3/5/13.
Accession Number: 20130305–5158.
Comments Due: 5 p.m. e.t. 3/14/13.
Docket Numbers: RP13–671–000.
Applicants: USG Pipeline Company,
LLC.
Description: Housekeeping tariff filing
to be effective 4/4/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5158.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–672–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Name Conversion—
Columbia Gulf Company to Columbia
Gulf LLC to be effective 3/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5159.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–673–000.
Applicants: B–R Pipeline Company.
Description: Housekeeping tariff filing
to be effective 3/4/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5160.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–674–000.
Applicants: Ruby Pipeline, L.L.C.
VerDate Mar<14>2013
17:37 Mar 14, 2013
Jkt 229001
Description: Tariff Updates and
Housekeeping Filing to be effective
4/8/2013.
Filed Date: 3/6/13.
Accession Number: 20130306–5067.
Comments Due: 5 p.m. e.t. 3/18/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13–529–001.
Applicants: Guardian Pipeline, L.L.C.
Description: NAESB 2.0 Modification
to be effective 4/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5129.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–530–001.
Applicants: Midwestern Gas
Transmission Company.
Description: NAESB 2.0 Modification
to be effective 4/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5124.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–531–001.
Applicants: OkTex Pipeline
Company, L.L.C.
Description: NAESB 2.0 Modification
to be effective 4/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5128.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–532–001.
Applicants: Viking Gas Transmission
Company.
Description: NAESB 2.0 Modification
to be effective 4/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5118.
Comments Due: 5 p.m. e.t. 3/18/13.
Docket Numbers: RP13–589–001.
Applicants: Northwest Pipeline GP.
Description: Rp13–589–001 Fuel
Filing Amendment to be effective
4/1/2013.
Filed Date: 3/5/13.
Accession Number: 20130305–5157.
Comments Due: 5 p.m. e.t. 3/14/13.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
16491
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: March 7, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–05973 Filed 3–14–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–51–001.
Applicants: T. Rowe Price Group, Inc.
Description: T. Rowe Price Associates,
Inc. et al (Primary Applicants) request
for reauthorization and extension of
Blanket Authorizations to acquire and
dispose of securities pursuant to Section
203 of the Federal Power Act.
Filed Date: 3/4/13.
Accession Number: 20130305–0200.
Comments Due: 5 p.m. e.t. 3/25/13.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4267–005;
ER11–4270–005; ER11–4269–006 ER11–
4268–005; ER11–113–006; ER10–2682–
005 ER12–1680–003; ER11–4694–002.
Applicants: Algonquin Energy
Services Inc., Algonquin Power Windsor
Locks LLC, Algonquin Tinker Gen Co.,
Algonquin Northern Maine Gen Co.,
Sandy Ridge Wind, LLC, Granite State
Electric Company, Minonk Wind, LLC,
GSG 6, LLC.
Description: Notice of Change in
Status of Algonquin Energy Services
Inc., et al.
Filed Date: 3/5/13.
Accession Number: 20130305–5182.
Comments Due: 5 p.m. e.t. 3/26/13.
Docket Numbers: ER13–1040–000.
Applicants: Wisconsin Public Service
Corporation.
Description: Wisconsin Public Service
Corporation Section 205 Filing to be
effective 12/31/9998.
Filed Date: 3/5/13.
Accession Number: 20130305–5155.
Comments Due: 5 p.m. e.t. 3/26/13.
Docket Numbers: ER13–1041–000.
Applicants: American Electric Power
Service Corporation, PJM
Interconnection, L.L.C.
E:\FR\FM\15MRN1.SGM
15MRN1
Agencies
[Federal Register Volume 78, Number 51 (Friday, March 15, 2013)]
[Notices]
[Pages 16490-16491]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05950]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2079-000]
Placer County Water Agency; Notice of Authorization for Continued
Project Operation
On February 23, 2011, the Placer County Water Agency, licensee for
the Middle Fork American River Hydroelectric Project, filed an
Application for a New License pursuant to the Federal Power Act (FPA)
and the Commission's regulations thereunder. The Middle Fork American
River Hydroelectric Project is located on the Middle Fork American
River and the Rubicon River and located in Placer and El Dorado
Counties, almost entirely within the Tahoe and El Dorado National
Forests.
The license for Project No. 2079 was issued for a period ending
February 28, 2013. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2079 is issued to
the Placer County Water Agency for a period effective March 1, 2013
through February 28, 2014 or until the issuance of a new license for
the project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take place
on or before February 28, 2014, notice is hereby given that, pursuant
to 18 CFR 16.18(c),
[[Page 16491]]
an annual license under section 15(a)(1) of the FPA is renewed
automatically without further order or notice by the Commission, unless
the Commission orders otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby given that the Placer County
Water Agency is authorized to continue operation of the Middle Fork
American River Hydroelectric Project, until such time as the Commission
acts on its application for a subsequent license.
Dated: March 7, 2013.
Kimberly D. Bose
Secretary.
[FR Doc. 2013-05950 Filed 3-14-13; 8:45 am]