Public Service Company of Colorado; Notice Revising Precedural Schedule, 16496-16497 [2013-05944]

Download as PDF 16496 Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices have an average annual generation of approximately 764,000 kilowatt-hours. Applicant Contact: James World, 55 Main Street, Lancaster, NH 03584; phone: (802) 376–7677. FERC Contact: Brandon Cherry; phone: (202) 502–8328. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13643) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–05945 Filed 3–14–13; 8:45 am] srobinson on DSK4SPTVN1PROD with NOTICES BILLING CODE 6717–01–P VerDate Mar<14>2013 17:37 Mar 14, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14443–000] Consolidated Irrigation Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 30, 2011, the Consolidated Irrigation Company of Preston, Idaho, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Consolidated Irrigation Glendale Conduit Hydro Project (Glendale Conduit Project or project) to be located on Mink and Cub Creeks, near Preston, in Franklin County, Idaho. The project would not occupy any Federal lands. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An existing screened intake on Mink Creek; (2) an existing screened intake on Cub Creek; (3) a new pipeline and penstock consisting of 8,520 feet of 24-inch-diameter, highdensity polyethylene (HDPE) pipe, 4,340 feet of 30-inch-diameter HDPE pipe, and 4,060 feet of 36-inch-diameter HDPE pipe; (4) a powerhouse containing a 500-kilowatt turbine-generator; (5) a 1,700-foot-long, underground 12kilovolt transmission cable connecting to an existing transmission line owned by Rocky Mountain Power; and (6) appurtenant facilities. The estimated annual generation of the Glendale Conduit Project would be 2,526 megawatt-hours. Applicant Contact: Mr. Lyle Porter, President, Consolidated Irrigation Company, 33 South 1st East, Preston, ID 83263; phone: (208) 852–2364. FERC Contact: Joseph Hassell; phone: (202) 502–8079. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14443) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–05952 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2351–017] Public Service Company of Colorado; Notice Revising Precedural Schedule On January 25, 2013, the Commission issued a public Notice of Application Accepted for Filing, Soliciting Motions to Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions for the relicensing of the Public Service Company of Colorado’s Cabin Creek Pumped Storage Project No. 2351, located on the South Clear Creek and its tributary Cabin Creek in Clear Creek County, Colorado. The project, as currently licensed, is located on 267 acres of U.S. Forest Service lands within the Arapahoe National Forest. The procedural schedule published in the prior notice has been revised due to an error. The application will be processed according to the following E:\FR\FM\15MRN1.SGM 15MRN1 16497 Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Ready for Environmental Analysis and Application Acceptance. Comments, Interventions, recommendations, prescriptions due. Requests 401 Certification. Reply Comments due Issue single EA ......... Comments on EA due Modified 4(e) and Fishway Prescriptions. Target date Friday, January 25, 2013. Tuesday, March 26, 2013. Tuesday, March 26, 2013. Friday, May 10, 2013. Wednesday, July 24, 2013. Friday, August 23, 2013. Tuesday, October 22, 2013. Dated: March 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–05944 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–81–000] srobinson on DSK4SPTVN1PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on February 21, 2013, Columbia Gas Transmission, LLC (Columbia Gas), 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed in Docket No. CP13–81–000, a prior notice request pursuant to sections 157.205, 157.210, and 157.216(b) of the Commission’s regulations under the Natural Gas Act (NGA), seeking authorization to abandon and construct compressor units at its Rockport Compressor Station in Wood County, West Virginia, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Specifically, Columbia Gas proposes to abandon three 1,000 horsepower (hp) compressor units and replace them with two 1,775 hp compressor units at its Rockport Compressor Station as part of its modernization project. Each new unit will be derated to produce 1,686 hp of compression. The estimated cost of the proposed facilities is $22,000,000. Any questions regarding the applications should be directed to Fredric J. George, Senior Counsel, VerDate Mar<14>2013 19:07 Mar 14, 2013 Jkt 229001 Columbia Gas Transmission, LLC, P.O. Box 1273, Charleston, West Virginia 25325–1273, phone (304) 357–2359, fax (304) 357–3206. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: March 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–05943 Filed 3–14–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance Docket No. PacifiCorp ..................... Deseret Generation & Transmission Cooperative, Inc. Northwestern Corporation (Montana). Portland General Electric Company. Idaho Power Company Public Service Company of Colorado. Terra-Gen Dixie Valley, LLC. Tucson Electric Power Company. UNS Electric, Inc ........... Public Service Company of New Mexico. Arizona Public Service Company. El Paso Electric Company. Black Hills Power, Inc., et al. Black Hills Colorado Electric Utility Company. NV Energy, Inc ............. Cheyenne Light, Fuel and Power Company. Avista Corporation ........ Avista Corporation ........ Puget Sound Energy .... Puget Sound Energy .... Bonneville Power Administration. California Independent System Operator Corporation. ER13–64–000 ER13–65–000 ER13–67–000 ER13–68–000 ER13–127–000 ER13–75–000 ER13–76–000 ER13–77–000 ER13–78–000 ER13–79–000 ER13–82–000 ER13–91–000 ER13–96–000 ER13–97–000 ER13–105–000 ER13–120–000 ER13–93–000 ER13–94–000 ER13–98–000 ER13–99–000 NJ13–1–000 ER13–103–000 The Federal Energy Regulatory Commission (Commission) hereby gives notice that on March 11, 2013, members of its staff will attend a conference call conducted by representatives of California Independent System Operator Corporation, ColumbiaGrid, Northern Tier Transmission Group, and WestConnect regarding the interregional coordination requirements established by Order No. 1000. The agenda and other documents for the meeting are available at https:// www.columbiagrid.org/O1000Interdocuments.cfm. The meeting is open to all stakeholders and Commission staff’s attendance is part of the Commission’s ongoing outreach efforts. The meeting may discuss matters at issue in the above captioned dockets. For further information, contact Saeed Farrokhpay at saeed.farrokhpay@ferc.gov. E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 78, Number 51 (Friday, March 15, 2013)]
[Notices]
[Pages 16496-16497]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05944]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2351-017]


Public Service Company of Colorado; Notice Revising Precedural 
Schedule

    On January 25, 2013, the Commission issued a public Notice of 
Application Accepted for Filing, Soliciting Motions to Intervene and 
Protests, Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Preliminary Terms and Conditions, and Preliminary 
Fishway Prescriptions for the relicensing of the Public Service Company 
of Colorado's Cabin Creek Pumped Storage Project No. 2351, located on 
the South Clear Creek and its tributary Cabin Creek in Clear Creek 
County, Colorado. The project, as currently licensed, is located on 267 
acres of U.S. Forest Service lands within the Arapahoe National Forest.
    The procedural schedule published in the prior notice has been 
revised due to an error. The application will be processed according to 
the following

[[Page 16497]]

revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Ready for Environmental Analysis and        Friday, January 25, 2013.
 Application Acceptance.
Comments, Interventions, recommendations,   Tuesday, March 26, 2013.
 prescriptions due.
Requests 401 Certification................  Tuesday, March 26, 2013.
Reply Comments due........................  Friday, May 10, 2013.
Issue single EA...........................  Wednesday, July 24, 2013.
Comments on EA due........................  Friday, August 23, 2013.
Modified 4(e) and Fishway Prescriptions...  Tuesday, October 22, 2013.
------------------------------------------------------------------------


    Dated: March 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-05944 Filed 3-14-13; 8:45 am]
BILLING CODE 6717-01-P