Gulf Crossing Pipeline Company LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Panda Power Lateral Project and Request for Comments on Environmental Issues, 15364-15366 [2013-05550]
Download as PDF
15364
Federal Register / Vol. 78, No. 47 / Monday, March 11, 2013 / Notices
Federal Energy Regulatory
Commission
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on April 3,
2013.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Gulf Crossing provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’. This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (www.ferc.gov).
[Docket No. CP13–64–000]
Summary of the Proposed Project
Gulf Crossing Pipeline Company LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Panda Power Lateral Project
and Request for Comments on
Environmental Issues
Gulf Crossing proposes to construct
and operate a new pipeline lateral along
with metering, interconnect, and
pigging facilities north of Dallas, Texas
in Grayson County, Texas. The Panda
Power Lateral would provide 125,000
dekatherms per day of deliverable
natural gas capacity from its takeoff at
the Sherman Compressor Station
located 10 miles northeast of Sherman,
Texas, to Panda Sherman Power, LLC’s
Panda Sherman Power Plant I electric
generation power plant, currently under
construction on the south side of
Sherman, Texas. According to Gulf
Crossing, its project would help meet
the increasing demands for electricity in
the expanding market area of north
central Texas.
Filed Date: 2/15/13.
Accession Number: 20130215–5097.
Comments Due: 5 p.m. ET 3/8/13.
Docket Numbers: RD13–6–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standard VAR–001–3—
Voltage and Reactive Control.
Filed Date: 2/26/13.
Accession Number: 20130226–5108.
Comments Due: 5 p.m. ET 3/28/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 26, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–05530 Filed 3–8–13; 8:45 am].
BILLING CODE 6717–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Panda Power Lateral Project
involving construction and operation of
facilities by Gulf Crossing Pipeline
Company LLC (Gulf Crossing) in
Grayson County, Texas. The
Commission will use this EA in its
decision-making process to determine
VerDate Mar<15>2010
16:19 Mar 08, 2013
Jkt 229001
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
The Panda Power Lateral Project
(Project) would consist of the following
facilities:
• A 16.5-mile-long 16-inch-diameter
pipeline lateral;
• A pig launcher barrel and system
tie-in facilities at Milepost (MP) 0.0
consisting of a 16-inch launcher barrel
and associated piping and valves; 1
• Two mainline valves and
appurtenant facilities at MPs 8.74 and
14.76;
• A pig receiver barrel and meter
station consisting of a 16-inch receiver
barrel and associated piping and valves
at MP 16.52; and
• An Enterprise Texas Pipeline (ETP)
interconnect at MP 14.75 consisting of
a meter and flow control station to be
built, owned, and operated by ETP.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would require disturbance of 271 acres
of land. This total would include 158
acres of temporary right-of-way that
would be fully restored to original use,
and 113 acres of new permanent rightof-way required for the pipeline,
appurtenant facilities, and access roads.
Eleven of the 29 access roads to be used
for construction would be new, five
would be temporary, and only two of
the proposed 24 permanent access roads
would require improvements beyond a
gravel or dirt surface. Some of the access
roads All the access roads The
temporary right-of-way would be
comprised of 81 acres of nominal
workspace along the pipeline, 38 acres
of temporary additional workspaces
along the pipeline, and 36 acres of
contractor yards. Gulf Crossing would
use a typical construction right-of-way
width of 75 to 100 feet and a permanent
right-of-way width of 50 feet. About 55
percent of the proposed pipelines would
parallel existing pipeline, electric, and
sewer utility rights-of-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\11MRN1.SGM
11MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 47 / Monday, March 11, 2013 / Notices
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
beginning on page 5.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.4 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.5 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPOs
as the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Mar<15>2010
16:19 Mar 08, 2013
Jkt 229001
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before April 3,
2013.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP13–64–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
15365
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
E:\FR\FM\11MRN1.SGM
11MRN1
15366
Federal Register / Vol. 78, No. 47 / Monday, March 11, 2013 / Notices
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP13–64). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–05550 Filed 3–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 14497–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 11, 2013, the Archon
Energy 1, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Kings River Drop 3 Hydroelectric
Project (Kings river Drop 3 Project or
project) to be located on Kings River,
near the city of Sanger, Fresno County,
California. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
VerDate Mar<15>2010
16:19 Mar 08, 2013
Jkt 229001
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A VLH diversion canal
intake and a gated turbine structure
adjacent to the eastern abutment of the
existing dam; (2) a 300-foot by 60-foot
turbine structure enclosing three VLH
4000 turbo generators; (3) a 10 foot by
10 foot electrical control shack; and (4)
appurtenant facilities. The proposed
project would have a total installed
capacity of 1.5 megawatts (MW) and
generate an estimated average annual
energy production of 10,000 megawatthours (MWh) by diverting existing
stream flow into the diversion canal.
Applicant Contact: Mr. Paul Grist,
Archon Energy 1, Inc., 101 E. Kennedy
Blvd., Suite 2800, Tampa, Florida
33602, phone: (403) 618–2018.
FERC Contact: Kenneth Hogan;
phone: (202) 502–8434, email:
kenneth.hogan@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14497) in the docket number field to
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
access the document. For assistance,
contact FERC Online Support.
Dated: March 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–05549 Filed 3–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Centers for Disease Control and
Prevention
[30Day–13–12RS]
Agency Forms Undergoing Paperwork
Reduction Act Review
The Centers for Disease Control and
Prevention (CDC) publishes a list of
information collection requests under
review by the Office of Management and
Budget (OMB) in compliance with the
Paperwork Reduction Act (44 U.S.C.
Chapter 35). To request a copy of these
requests, call (404) 639–7570 or send an
email to omb@cdc.gov. Send written
comments to CDC Desk Officer, Office of
Management and Budget, Washington,
DC 20503 or by fax to (202) 395–5806.
Written comments should be received
within 30 days of this notice.
Proposed Project
Exposure Assessment and
Epidemiological Study of U.S. Workers
Exposed to Carbon Nanotubes and
Carbon Nanofibers—New—National
Institute for Occupational Safety and
Health (NIOSH), Centers for Disease
Control and Prevention (CDC).
Background and Brief Description
The mission of the National Institute
for Occupational Safety and Health
(NIOSH) is to promote safety and health
at work for all people through research
and prevention. The Occupational
Safety and Health Act of 1970, Public
Law 91–596 (Section 20[a][1] authorizes
NIOSH to conduct research to advance
the health and safety of workers. In this
capacity, NIOSH will conduct an
exposure assessment and
epidemiological study of U.S. carbon
nanotube (CNT) and carbon nanofiber
(CNF) workers.
At present, because of the newness of
the technology, much of the
occupational exposure to engineered
nanomaterials occurs at the research
and development (R&D) or pilot scale.
There have been few reliable surveys of
the size of the workforce exposed to
nanomaterials. Health effects from
exposure to nanomaterials are
uncertain, but may be more severe than
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 78, Number 47 (Monday, March 11, 2013)]
[Notices]
[Pages 15364-15366]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05550]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-64-000]
Gulf Crossing Pipeline Company LLC; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Panda Power Lateral
Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Panda Power Lateral Project
involving construction and operation of facilities by Gulf Crossing
Pipeline Company LLC (Gulf Crossing) in Grayson County, Texas. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on April 3, 2013.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Gulf Crossing provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?''. This fact sheet addresses a number of typically-
asked questions, including the use of eminent domain and how to
participate in the Commission's proceedings. It is also available for
viewing on the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
Gulf Crossing proposes to construct and operate a new pipeline
lateral along with metering, interconnect, and pigging facilities north
of Dallas, Texas in Grayson County, Texas. The Panda Power Lateral
would provide 125,000 dekatherms per day of deliverable natural gas
capacity from its takeoff at the Sherman Compressor Station located 10
miles northeast of Sherman, Texas, to Panda Sherman Power, LLC's Panda
Sherman Power Plant I electric generation power plant, currently under
construction on the south side of Sherman, Texas. According to Gulf
Crossing, its project would help meet the increasing demands for
electricity in the expanding market area of north central Texas.
The Panda Power Lateral Project (Project) would consist of the
following facilities:
A 16.5-mile-long 16-inch-diameter pipeline lateral;
A pig launcher barrel and system tie-in facilities at
Milepost (MP) 0.0 consisting of a 16-inch launcher barrel and
associated piping and valves; \1\
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
Two mainline valves and appurtenant facilities at MPs 8.74
and 14.76;
A pig receiver barrel and meter station consisting of a
16-inch receiver barrel and associated piping and valves at MP 16.52;
and
An Enterprise Texas Pipeline (ETP) interconnect at MP
14.75 consisting of a meter and flow control station to be built,
owned, and operated by ETP.
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would require disturbance
of 271 acres of land. This total would include 158 acres of temporary
right-of-way that would be fully restored to original use, and 113
acres of new permanent right-of-way required for the pipeline,
appurtenant facilities, and access roads. Eleven of the 29 access roads
to be used for construction would be new, five would be temporary, and
only two of the proposed 24 permanent access roads would require
improvements beyond a gravel or dirt surface. Some of the access roads
All the access roads The temporary right-of-way would be comprised of
81 acres of nominal workspace along the pipeline, 38 acres of temporary
additional workspaces along the pipeline, and 36 acres of contractor
yards. Gulf Crossing would use a typical construction right-of-way
width of 75 to 100 feet and a permanent right-of-way width of 50 feet.
About 55 percent of the proposed pipelines would parallel existing
pipeline, electric, and sewer utility rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action
[[Page 15365]]
whenever it considers the issuance of a Certificate of Public
Convenience and Necessity. NEPA also requires us \3\ to discover and
address concerns the public may have about proposals. This process is
referred to as ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this notice, the Commission requests public comments on the scope of
the issues to address in the EA. We will consider all filed comments
during the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section beginning on page 5.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\4\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\5\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPOs as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before April
3, 2013.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP13-64-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
[[Page 15366]]
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP13-
64). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: March 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-05550 Filed 3-8-13; 8:45 am]
BILLING CODE 6717-01-P