Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL, 15292 [2013-05547]

Download as PDF 15292 Federal Register / Vol. 78, No. 47 / Monday, March 11, 2013 / Rules and Regulations affiliated with other agencies of the Department, as appropriate. (c) Requirement of a CAP. After review, a State whose program year EER is determined not to be deficient will be notified that a CAP will not be required; a State whose program year EER is determined to be deficient will be required to submit a CAP to improve the State’s performance in assisting veterans to meet their employment needs as a condition of receiving its next-due JVSG. (1) Any State whose program year EER has been determined to be deficient will be notified by March 31 of the year following the calendar year in which the program year under review ended. (2) For any State that is required to submit a CAP, VETS will provide technical assistance (TA), with input from ETA, on the development of the CAP. The CAP must be submitted to the Grant Officer’s Technical Representative by June 30 of the year following the calendar year in which the program year under review ended. (3) We will review the CAP submitted by the State and determine, with input from ETA, whether to approve it or to provide additional TA to the State. (i) If we approve the CAP, the State must expeditiously implement it. (ii) If we do not approve the CAP, we will take such steps as are necessary to implement corrective actions to improve the State’s EER for veterans and eligible persons. (4) If a State fails to take the actions we impose under paragraph (c)(3)(ii) of this section, the Assistant Secretary for Veterans’ Employment and Training may take any actions available to remedy non-compliance under 20 CFR 1001.130(a) (referring to the compliance measures discussed in 20 CFR part 658, subpart H). mstockstill on DSK4VPTVN1PROD with RULES § 1001.167 In addition to the procedures specified in this part, will the Department be conducting any other monitoring of compliance regarding services to veterans? Yes. We will continue to monitor compliance with the regulations on veterans’ priority of service at 20 CFR 1010.240(b) jointly with the ETA. If a State’s program year EER is determined to be deficient for a given program year, that deficiency would constitute information to be considered in monitoring priority of service, since failure to fully implement priority of service could be one of the contributors to a deficient program year EER. Keith Kelly, Assistant Secretary, Veterans’ Employment and Training. [FR Doc. 2013–05345 Filed 3–8–13; 8:45 am] BILLING CODE 4510–79–P VerDate Mar<15>2010 17:01 Mar 08, 2013 Jkt 229001 DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2013–0120] Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL Coast Guard, DHS. Notice of deviation from regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the River Bandits 5K Run/Walk to cross the bridge. This deviation allows the bridge to be maintained in the closed-tonavigation position. DATES: This deviation is effective on April 6, 2013, from 8 a.m. until 9:30 a.m. ADDRESSES: The docket for this deviation, [USCG–2013–0120] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone (314) 269–2378, email Eric.Washburn@uscg.mil. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone (202) 366–9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island Railroad and Highway Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois to remain in the closed-to-navigation position for a one and a half hour period from 8 a.m. to 9:30 a.m., April 6, 2013, while a run/ walk is held between the cities of Davenport, IA and Rock Island, IL. The Rock Island Railroad and Highway SUMMARY: PO 00000 Frm 00016 Fmt 4700 Sfmt 4700 Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The Rock Island Railroad and Highway Drawbridge, in the closed-tonavigation position, provides a vertical clearance of 23.8 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. This temporary deviation has been coordinated with waterway users. No objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 26, 2013. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2013–05547 Filed 3–8–13; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2013–0053] Drawbridge Operation Regulations; West Bay, Osterville, MA Coast Guard, DHS. Notice of temporary deviation from regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the regulation governing the operation of the West Bay Bridge across West Bay, mile 1.2, Osterville, Massachusetts. Under this temporary deviation, the bridge may remain in the closed position three months to facilitate scheduled bridge repairs. DATES: This deviation is effective from March 11, 2013, through April 30, 2013. This deviation has been enforced with actual notice since February 26, 2013. ADDRESSES: The docket for this deviation, [USCG–2013–0053] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line SUMMARY: E:\FR\FM\11MRR1.SGM 11MRR1

Agencies

[Federal Register Volume 78, Number 47 (Monday, March 11, 2013)]
[Rules and Regulations]
[Page 15292]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05547]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2013-0120]


Drawbridge Operation Regulations; Upper Mississippi River, Rock 
Island, IL

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Rock Island Railroad and Highway 
Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock 
Island, Illinois. The deviation is necessary to allow the River Bandits 
5K Run/Walk to cross the bridge. This deviation allows the bridge to be 
maintained in the closed-to-navigation position.

DATES: This deviation is effective on April 6, 2013, from 8 a.m. until 
9:30 a.m.

ADDRESSES: The docket for this deviation, [USCG-2013-0120] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Eric A. Washburn, Bridge 
Administrator, Western Rivers, Coast Guard; telephone (314) 269-2378, 
email Eric.Washburn@uscg.mil. If you have questions on viewing the 
docket, call Barbara Hairston, Program Manager, Docket Operations, 
telephone (202) 366-9826.

SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested 
a temporary deviation for the Rock Island Railroad and Highway 
Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock 
Island, Illinois to remain in the closed-to-navigation position for a 
one and a half hour period from 8 a.m. to 9:30 a.m., April 6, 2013, 
while a run/walk is held between the cities of Davenport, IA and Rock 
Island, IL. The Rock Island Railroad and Highway Drawbridge currently 
operates in accordance with 33 CFR 117.5, which states the general 
requirement that drawbridges shall open promptly and fully for the 
passage of vessels when a request to open is given in accordance with 
the subpart.
    There are no alternate routes for vessels transiting this section 
of the Upper Mississippi River.
    The Rock Island Railroad and Highway Drawbridge, in the closed-to-
navigation position, provides a vertical clearance of 23.8 feet above 
normal pool. Navigation on the waterway consists primarily of 
commercial tows and recreational watercraft. This temporary deviation 
has been coordinated with waterway users. No objections were received.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this deviation. This deviation from the operating regulations 
is authorized under 33 CFR 117.35.

    Dated: February 26, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013-05547 Filed 3-8-13; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.