License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority, 15055-15056 [2013-05491]
Download as PDF
Federal Register / Vol. 78, No. 46 / Friday, March 8, 2013 / Notices
FOR FURTHER INFORMATION CONTACT:
NUCLEAR REGULATORY
COMMISSION
[Docket Nos.: 50–327, 50–328; NRC–2013–
0037]
License Renewal Application for
Sequoyah Nuclear Plant, Units 1 and 2,
Tennessee Valley Authority
I. Accessing Information and
Submitting Comments
Nuclear Regulatory
Commission.
ACTION: Request for comments on the
notice of intent to prepare an
environmental impact statement and
notice of public meetings.
mstockstill on DSK4VPTVN1PROD with NOTICES
AGENCY:
A. Accessing Information
SUMMARY: Tennessee Valley Authority
(TVA) has submitted to the U.S. Nuclear
Regulatory Commission (NRC) an
application for renewal of Facility
Operating Licenses DPR–77 and DPR–79
for an additional 20 years of operation
at Sequoyah Nuclear Plant, Units 1 and
2 (SQN). Sequoyah Nuclear Plant is
located in Soddy-Daisy, Tennessee. The
current operating license for Sequoyah
Nuclear Plant, Unit 1 expires on
September 17, 2020, and Unit 2 expires
on September 15, 2021.
DATES: The scoping meetings will be
held on April 3, 2013. The first session
will be from 2:00 p.m. to 4:00 p.m. and
the second session will be from 6:00
p.m. to 8:00 p.m. Submit comments by
May 3, 2013. Comments received after
this date will be considered if it is
practical to do so, but assurance of
consideration cannot be given to
comments received after this date.
ADDRESSES: You may access information
and comment submissions related to
this document, which the NRC
possesses and is publically available, by
searching on https://www.regulations.gov
under Docket ID NRC–2013–0037. You
may submit comments by any of the
following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0037. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: carol.gallagher@nrc.gov.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
• Fax comments to: RADB at 301–
492–3446.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
VerDate Mar<15>2010
18:44 Mar 07, 2013
Jkt 229001
Emmanuel Sayoc, Environmental
Project Manager, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
4084, email: emmanuel.sayoc@nrc.gov.
SUPPLEMENTARY INFORMATION:
Please refer to Docket ID NRC–2013–
0037 when contacting the NRC about
the availability of information regarding
this document. You may access
information related to this document by
any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0037.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852.
B. Submitting Comments
Please include Docket ID NRC–2013–
0037 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
PO 00000
Frm 00097
Fmt 4703
Sfmt 4703
15055
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Discussion
The application for renewal, dated
January 15, 2013, was submitted
pursuant to part 54 of Title 10 of the
Code of Federal Regulations (10 CFR),
which included an environmental
report (ER). A separate notice of receipt
and availability of the application was
published in the Federal Register on
February 22, 2013 (78 FRN 12365). A
notice of acceptance for docketing of the
application and opportunity for hearing
regarding renewal of the facility
operating license is also being published
in the Federal Register. The purpose of
this notice is to inform the public that
the U.S. Nuclear Regulatory
Commission (NRC) will be preparing an
environmental impact statement (EIS)
related to the review of the license
renewal application and to provide the
public an opportunity to participate in
the environmental scoping process, as
defined in 10 CFR 51.29.
As outlined in 36 CFR 800.8,
‘‘Coordination with the National
Environmental Policy Act,’’ the NRC
plans to coordinate compliance with
Section 106 of the National Historic
Preservation Act (NHPA) in meeting the
requirements of the National
Environmental Policy Act of 1969
(NEPA). Pursuant to 36 CFR 800.8(c),
the NRC intends to use its process and
documentation for the preparation of
the EIS on the proposed action to
comply with Section 106 of the NHPA
in lieu of the procedures set forth at 36
CFR 800.3 through 800.6.
In accordance with 10 CFR 51.53(c)
and 10 CFR 54.23, TVA submitted the
ER as part of the application. The ER
was prepared pursuant to 10 CFR Part
51 and is publicly available in ADAMS
under Accession No. ML130240007.
The ER may also be viewed on the
Internet at https://www.nrc.gov/reactors/
operating/licensing/renewal/
applications.html. In addition, paper
copies of the ER are available to the
public near the site at the ChattanoogaHamilton County Library, Northgate
Branch, 520 Northgate Mall,
Chattanooga, TN 37415.
This document advises the public that
the NRC intends to gather the
information necessary to prepare a
plant-specific supplement to the NRC’s
‘‘Generic Environmental Impact
E:\FR\FM\08MRN1.SGM
08MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
15056
Federal Register / Vol. 78, No. 46 / Friday, March 8, 2013 / Notices
Statement (GEIS) for License Renewal of
Nuclear Plants,’’ (NUREG–1437) related
to the review of the application for
renewal of the Sequoyah Nuclear Plant
operating licenses for an additional 20
years.
Possible alternatives to the proposed
action (license renewal) include no
action and reasonable alternative energy
sources. The NRC is required by 10 CFR
51.95 to prepare a supplement to the
GEIS in connection with the renewal of
an operating license. This notice is
being published in accordance with
NEPA and the NRC’s regulations found
at 10 CFR part 51.
The NRC will first conduct a scoping
process for the supplement to the GEIS
and, as soon as practicable thereafter,
will prepare a draft supplement to the
GEIS for public comment. Participation
in the scoping process by members of
the public and local, State, Tribal, and
Federal government agencies is
encouraged. The scoping process for the
supplement to the GEIS will be used to
accomplish the following:
a. Define the proposed action, which
is to be the subject of the supplement to
the GEIS;
b. Determine the scope of the
supplement to the GEIS and identify the
significant issues to be analyzed in
depth;
c. Identify and eliminate from
detailed study those issues that are
peripheral or that are not significant;
d. Identify any environmental
assessments and other ElSs that are
being or will be prepared that are
related to, but are not part of, the scope
of the supplement to the GEIS being
considered;
e. Identify other environmental
review and consultation requirements
related to the proposed action;
f. Indicate the relationship between
the timing of the preparation of the
environmental analyses and the
Commission’s tentative planning and
decision-making schedule;
g. Identify any cooperating agencies
and, as appropriate, allocate
assignments for preparation and
schedules for completing the
supplement to the GEIS to the NRC and
any cooperating agencies; and
h. Describe how the supplement to
the GEIS will be prepared and include
any contractor assistance to be used.
The NRC invites the following entities
to participate in scoping:
a. The applicant, TVA;
b. Any Federal agency that has
jurisdiction by law or special expertise
with respect to any environmental
impact involved or that is authorized to
develop and enforce relevant
environmental standards;
VerDate Mar<15>2010
18:44 Mar 07, 2013
Jkt 229001
c. Affected State and local
government agencies, including those
authorized to develop and enforce
relevant environmental standards;
d. Any affected Indian tribe;
e. Any person who requests or has
requested an opportunity to participate
in the scoping process; and
f. Any person who has petitioned or
intends to petition for leave to
intervene.
III. Public Scoping Meeting
In accordance with 10 CFR 51.26, the
scoping process for an EIS may include
a public scoping meeting to help
identify significant issues related to a
proposed activity and to determine the
scope of issues to be addressed in an
EIS. The NRC has decided to hold
public meetings for the Sequoyah
Nuclear Plant license renewal
supplement to the GEIS. The scoping
meetings will be held on April 3, 2013,
and there will be two sessions to
accommodate interested parties. The
first session will convene at 2:00 p.m.
and will continue until 4:00 p.m., as
necessary. The second session will
convene at 6:00 p.m. with a repeat of the
overview portions of the meeting and
will continue until 8:00 p.m., as
necessary. Both sessions will be held at
the Soddy Daisy City Hall, 9835 Dayton
Pike, Soddy Daisy, TN 37379.
Both meetings will be transcribed and
will include: (1) An overview by the
NRC staff of the NEPA environmental
review process, the proposed scope of
the supplement to the GEIS, and the
proposed review schedule; and (2) the
opportunity for interested government
agencies, organizations, and individuals
to submit comments or suggestions on
the environmental issues or the
proposed scope of the supplement to the
GEIS. Additionally, the NRC staff will
host informal discussions one hour
prior to the start of each session at the
same location. No formal comments on
the proposed scope of the supplement to
the GEIS will be accepted during the
informal discussions. To be considered,
comments must be provided either at
the transcribed public meetings or in
writing, as discussed above.
Persons may register to attend or
present oral comments at the meetings
on the scope of the NEPA review by
contacting the NRC Project Manager,
Mr. Emmanuel Sayoc, by telephone at
1–800–368–5642, extension 4084, or by
email at emmanuel.sayoc@nrc.gov no
later than March 29, 2013. Members of
the public may also register to speak at
the meeting within 15 minutes of the
start of each session. Individual oral
comments may be limited by the time
available, depending on the number of
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
persons who register. Members of the
public who have not registered may also
have an opportunity to speak if time
permits. Public comments will be
considered in the scoping process for
the supplement to the GEIS. Mr. Sayoc
will need to be contacted no later than
March 25, 2013, if special equipment or
accommodations are needed to attend or
present information at the public
meeting so that the NRC staff can
determine whether the request can be
accommodated.
Participation in the scoping process
for the supplement to the GEIS does not
entitle participants to become parties to
the proceeding to which the supplement
to the GEIS relates. Matters related to
participation in any hearing are outside
the scope of matters to be discussed at
this public meeting.
At the conclusion of the scoping
process, the NRC will prepare a concise
summary of the determination and
conclusions reached, including the
significant issues identified, and will
send a copy of the summary to each
participant in the scoping process. The
summary will also be available for
inspection in ADAMS. The staff will
then prepare and issue for comment the
draft supplement to the GEIS, which
will be the subject of a separate notice
and separate public meetings. Copies
will be available for public inspection at
the above-mentioned addresses. After
receipt and consideration of the
comments, the NRC will prepare a final
supplement to the GEIS, which will also
be available for public inspection.
Dated at Rockville, Maryland, this 1st day
of March 2013.
For the Nuclear Regulatory Commission.
David J. Wrona,
Chief, Projects Branch 2, Division of License
Renewal, Office of Nuclear Reactor
Regulation.
[FR Doc. 2013–05491 Filed 3–7–13; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
Submission for OMB Review;
Comment Request
Upon Written Request Copies Available
From: Securities and Exchange
Commission, Office of Investor
Education and Advocacy,
Washington, DC 20549–0213.
Extension: Rule 15c3–4.
SEC File No. 270–441, OMB Control No.
3235–0497.
Notice is hereby given that pursuant
to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.) (the ‘‘Paperwork
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 78, Number 46 (Friday, March 8, 2013)]
[Notices]
[Pages 15055-15056]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05491]
[[Page 15055]]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos.: 50-327, 50-328; NRC-2013-0037]
License Renewal Application for Sequoyah Nuclear Plant, Units 1
and 2, Tennessee Valley Authority
AGENCY: Nuclear Regulatory Commission.
ACTION: Request for comments on the notice of intent to prepare an
environmental impact statement and notice of public meetings.
-----------------------------------------------------------------------
SUMMARY: Tennessee Valley Authority (TVA) has submitted to the U.S.
Nuclear Regulatory Commission (NRC) an application for renewal of
Facility Operating Licenses DPR-77 and DPR-79 for an additional 20
years of operation at Sequoyah Nuclear Plant, Units 1 and 2 (SQN).
Sequoyah Nuclear Plant is located in Soddy-Daisy, Tennessee. The
current operating license for Sequoyah Nuclear Plant, Unit 1 expires on
September 17, 2020, and Unit 2 expires on September 15, 2021.
DATES: The scoping meetings will be held on April 3, 2013. The first
session will be from 2:00 p.m. to 4:00 p.m. and the second session will
be from 6:00 p.m. to 8:00 p.m. Submit comments by May 3, 2013. Comments
received after this date will be considered if it is practical to do
so, but assurance of consideration cannot be given to comments received
after this date.
ADDRESSES: You may access information and comment submissions related
to this document, which the NRC possesses and is publically available,
by searching on https://www.regulations.gov under Docket ID NRC-2013-
0037. You may submit comments by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0037. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: carol.gallagher@nrc.gov.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Emmanuel Sayoc, Environmental Project
Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001; telephone: 301-415-4084, email:
emmanuel.sayoc@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2013-0037 when contacting the NRC
about the availability of information regarding this document. You may
access information related to this document by any of the following
methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0037.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this notice (if that document is
available in ADAMS) is provided the first time that a document is
referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, MD 20852.
B. Submitting Comments
Please include Docket ID NRC-2013-0037 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Discussion
The application for renewal, dated January 15, 2013, was submitted
pursuant to part 54 of Title 10 of the Code of Federal Regulations (10
CFR), which included an environmental report (ER). A separate notice of
receipt and availability of the application was published in the
Federal Register on February 22, 2013 (78 FRN 12365). A notice of
acceptance for docketing of the application and opportunity for hearing
regarding renewal of the facility operating license is also being
published in the Federal Register. The purpose of this notice is to
inform the public that the U.S. Nuclear Regulatory Commission (NRC)
will be preparing an environmental impact statement (EIS) related to
the review of the license renewal application and to provide the public
an opportunity to participate in the environmental scoping process, as
defined in 10 CFR 51.29.
As outlined in 36 CFR 800.8, ``Coordination with the National
Environmental Policy Act,'' the NRC plans to coordinate compliance with
Section 106 of the National Historic Preservation Act (NHPA) in meeting
the requirements of the National Environmental Policy Act of 1969
(NEPA). Pursuant to 36 CFR 800.8(c), the NRC intends to use its process
and documentation for the preparation of the EIS on the proposed action
to comply with Section 106 of the NHPA in lieu of the procedures set
forth at 36 CFR 800.3 through 800.6.
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, TVA submitted
the ER as part of the application. The ER was prepared pursuant to 10
CFR Part 51 and is publicly available in ADAMS under Accession No.
ML130240007. The ER may also be viewed on the Internet at https://www.nrc.gov/reactors/operating/licensing/renewal/applications.html. In
addition, paper copies of the ER are available to the public near the
site at the Chattanooga-Hamilton County Library, Northgate Branch, 520
Northgate Mall, Chattanooga, TN 37415.
This document advises the public that the NRC intends to gather the
information necessary to prepare a plant-specific supplement to the
NRC's ``Generic Environmental Impact
[[Page 15056]]
Statement (GEIS) for License Renewal of Nuclear Plants,'' (NUREG-1437)
related to the review of the application for renewal of the Sequoyah
Nuclear Plant operating licenses for an additional 20 years.
Possible alternatives to the proposed action (license renewal)
include no action and reasonable alternative energy sources. The NRC is
required by 10 CFR 51.95 to prepare a supplement to the GEIS in
connection with the renewal of an operating license. This notice is
being published in accordance with NEPA and the NRC's regulations found
at 10 CFR part 51.
The NRC will first conduct a scoping process for the supplement to
the GEIS and, as soon as practicable thereafter, will prepare a draft
supplement to the GEIS for public comment. Participation in the scoping
process by members of the public and local, State, Tribal, and Federal
government agencies is encouraged. The scoping process for the
supplement to the GEIS will be used to accomplish the following:
a. Define the proposed action, which is to be the subject of the
supplement to the GEIS;
b. Determine the scope of the supplement to the GEIS and identify
the significant issues to be analyzed in depth;
c. Identify and eliminate from detailed study those issues that are
peripheral or that are not significant;
d. Identify any environmental assessments and other ElSs that are
being or will be prepared that are related to, but are not part of, the
scope of the supplement to the GEIS being considered;
e. Identify other environmental review and consultation
requirements related to the proposed action;
f. Indicate the relationship between the timing of the preparation
of the environmental analyses and the Commission's tentative planning
and decision-making schedule;
g. Identify any cooperating agencies and, as appropriate, allocate
assignments for preparation and schedules for completing the supplement
to the GEIS to the NRC and any cooperating agencies; and
h. Describe how the supplement to the GEIS will be prepared and
include any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
a. The applicant, TVA;
b. Any Federal agency that has jurisdiction by law or special
expertise with respect to any environmental impact involved or that is
authorized to develop and enforce relevant environmental standards;
c. Affected State and local government agencies, including those
authorized to develop and enforce relevant environmental standards;
d. Any affected Indian tribe;
e. Any person who requests or has requested an opportunity to
participate in the scoping process; and
f. Any person who has petitioned or intends to petition for leave
to intervene.
III. Public Scoping Meeting
In accordance with 10 CFR 51.26, the scoping process for an EIS may
include a public scoping meeting to help identify significant issues
related to a proposed activity and to determine the scope of issues to
be addressed in an EIS. The NRC has decided to hold public meetings for
the Sequoyah Nuclear Plant license renewal supplement to the GEIS. The
scoping meetings will be held on April 3, 2013, and there will be two
sessions to accommodate interested parties. The first session will
convene at 2:00 p.m. and will continue until 4:00 p.m., as necessary.
The second session will convene at 6:00 p.m. with a repeat of the
overview portions of the meeting and will continue until 8:00 p.m., as
necessary. Both sessions will be held at the Soddy Daisy City Hall,
9835 Dayton Pike, Soddy Daisy, TN 37379.
Both meetings will be transcribed and will include: (1) An overview
by the NRC staff of the NEPA environmental review process, the proposed
scope of the supplement to the GEIS, and the proposed review schedule;
and (2) the opportunity for interested government agencies,
organizations, and individuals to submit comments or suggestions on the
environmental issues or the proposed scope of the supplement to the
GEIS. Additionally, the NRC staff will host informal discussions one
hour prior to the start of each session at the same location. No formal
comments on the proposed scope of the supplement to the GEIS will be
accepted during the informal discussions. To be considered, comments
must be provided either at the transcribed public meetings or in
writing, as discussed above.
Persons may register to attend or present oral comments at the
meetings on the scope of the NEPA review by contacting the NRC Project
Manager, Mr. Emmanuel Sayoc, by telephone at 1-800-368-5642, extension
4084, or by email at emmanuel.sayoc@nrc.gov no later than March 29,
2013. Members of the public may also register to speak at the meeting
within 15 minutes of the start of each session. Individual oral
comments may be limited by the time available, depending on the number
of persons who register. Members of the public who have not registered
may also have an opportunity to speak if time permits. Public comments
will be considered in the scoping process for the supplement to the
GEIS. Mr. Sayoc will need to be contacted no later than March 25, 2013,
if special equipment or accommodations are needed to attend or present
information at the public meeting so that the NRC staff can determine
whether the request can be accommodated.
Participation in the scoping process for the supplement to the GEIS
does not entitle participants to become parties to the proceeding to
which the supplement to the GEIS relates. Matters related to
participation in any hearing are outside the scope of matters to be
discussed at this public meeting.
At the conclusion of the scoping process, the NRC will prepare a
concise summary of the determination and conclusions reached, including
the significant issues identified, and will send a copy of the summary
to each participant in the scoping process. The summary will also be
available for inspection in ADAMS. The staff will then prepare and
issue for comment the draft supplement to the GEIS, which will be the
subject of a separate notice and separate public meetings. Copies will
be available for public inspection at the above-mentioned addresses.
After receipt and consideration of the comments, the NRC will prepare a
final supplement to the GEIS, which will also be available for public
inspection.
Dated at Rockville, Maryland, this 1st day of March 2013.
For the Nuclear Regulatory Commission.
David J. Wrona,
Chief, Projects Branch 2, Division of License Renewal, Office of
Nuclear Reactor Regulation.
[FR Doc. 2013-05491 Filed 3-7-13; 8:45 am]
BILLING CODE 7590-01-P