Application to Export Electric Energy; Shell Energy North America (US), L.P., 14778-14779 [2013-05362]
Download as PDF
14778
Federal Register / Vol. 78, No. 45 / Thursday, March 7, 2013 / Notices
An institution should note that the
U.S. Postal Service does not uniformly
provide a dated postmark. Before
relying on this method, an institution
should check with its local post office.
All institutions are encouraged to use
certified or at least first-class mail.
The Department accepts hand
deliveries from you or a commercial
courier between 8:00 a.m. and 4:30:00
p.m., Washington, DC time, Monday
through Friday except Federal holidays.
emcdonald on DSK67QTVN1PROD with NOTICES
Sources for Detailed Information on
These Requests
A more detailed discussion of each
request for funds or waiver is provided
in specific ‘‘Electronic
Announcements,’’ which are posted on
the Department’s IFAP Web site
(www.ifap.ed.gov) at least 30 days before
the established deadline date for the
specific request. Information on these
items is also found in the Federal
Student Aid Handbook which is also
posted on the Department’s IFAP Web
site.
Applicable Regulations: The
following regulations apply to these
programs:
(1) Student Assistance General
Provisions, 34 CFR part 668.
(2) General Provisions for the Federal
Perkins Loan Program, Federal WorkStudy Program, and Federal
Supplemental Educational Opportunity
Grant Program, 34 CFR part 673.
(3) Federal Perkins Loan Program, 34
CFR part 674.
(4) Federal Work-Study Programs, 34
CFR part 675.
(5) Federal Supplemental Educational
Opportunity Grant Program, 34 CFR part
676.
(6) Institutional Eligibility under the
Higher Education Act of 1965, as
amended, 34 CFR part 600.
(7) New Restrictions on Lobbying, 34
CFR part 82.
(8) Governmentwide Requirements for
Drug-Free Workplace (Financial
Assistance), 34 CFR part 84.
(9) Governmentwide Debarment and
Suspension (Nonprocurement), 34 CFR
part 85.
(10) Drug and Alcohol Abuse
Prevention, 34 CFR part 86.
FOR FURTHER INFORMATION CONTACT: Pat
Stephenson, Manager, Campus-Based
Programs, U.S. Department of
Education, Federal Student Aid, 830
First Street, NE., Union Center Plaza,
room 63C5, Washington, DC 20202–
5453. Telephone: (202) 377–3782 or via
email: pat.stephenson@ed.gov.
Accessible Format: If you use a
telecommunications device for the deaf
(TDD) or a text telephone (TTY), call the
VerDate Mar<15>2010
14:43 Mar 06, 2013
Jkt 229001
Federal Relay Service, toll free, at 1–
800–877–8339.
Accessible Format: Individuals with
disabilities can obtain this document in
an accessible format (e.g., braille, large
print, audiotape, or compact disc) on
request to the program contact person
listed in this section.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Program Authority: 20 U.S.C. 1070b et seq.
and 1087aa et seq.; 42 U.S.C. 2751 et seq.
Dated: March 4, 2013.
James W. Runcie,
Chief Operating Officer, Federal Student Aid.
[FR Doc. 2013–05347 Filed 3–6–13; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–338–A]
Application to Export Electric Energy;
Shell Energy North America (US), L.P.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
SUMMARY: Shell Energy North America
(US), L.P. (Shell Energy) has applied to
renew its authority to transmit electric
energy from the United States to Mexico
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 8, 2013.
ADDRESSES: Comments, protests, or
motions to intervene should be
addressed to: Lamont Jackson, Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to
Lamont.Jackson@hq.doe.gov, or by
facsimile to 202–586–8008.
FOR FURTHER INFORMATION CONTACT:
Lamont Jackson (Program Office) at
202–586–0808, or by email to
Lamont.Jackson@hq.doe.gov.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On May 5, 2008, DOE issued Order
No. EA–338, which authorized Shell
Energy to transmit electric energy from
the United States to Mexico as a power
marketer for a five-year term using
existing international transmission
facilities. That authority expires on May
5, 2013. On February 5, 2013, Shell
Energy filed an application with DOE
for renewal of the export authority
contained in Order No. EA–338 for an
additional five-year term.
In its application, Shell Energy states
that it does not own any electric
generating or transmission facilities nor
does the applicant have a franchised
service area. The electric energy that
Shell Energy proposes to export to
Mexico would be surplus energy
purchased from electric utilities,
Federal power marketing agencies, and
other entities within the United States.
The existing international transmission
facilities to be utilized by Shell Energy
have previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments on the Shell Energy
application to export electric energy to
E:\FR\FM\07MRN1.SGM
07MRN1
Federal Register / Vol. 78, No. 45 / Thursday, March 7, 2013 / Notices
Mexico should be clearly marked with
OE Docket No. EA–338–A. An
additional copy is to be provided
directly to both Robert Reilley and Jane
Barnett, Shell Energy North America
(US), L.P., 1000 Main, Level 12,
Houston, TX 77002. A final decision
will be made on this application after
the environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
a determination is made by DOE that the
proposed action will not have an
adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 28,
2013.
Jon Worthington,
Deputy Assistant Secretary, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2013–05362 Filed 3–6–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–339–A]
Application to Export Electric Energy;
Shell Energy North America (US), L.P.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
emcdonald on DSK67QTVN1PROD with NOTICES
AGENCY:
SUMMARY: Shell Energy North America
(US), L.P. (Shell Energy) has applied to
renew its authority to transmit electric
energy from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 8, 2013.
ADDRESSES: Comments, protests, or
motions to intervene should be
addressed to: Lamont Jackson, Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to
Lamont.Jackson@hq.doe.gov, or by
facsimile to 202–586–8008.
FOR FURTHER INFORMATION CONTACT:
Lamont Jackson (Program Office) at
VerDate Mar<15>2010
14:43 Mar 06, 2013
Jkt 229001
202–586–0808, or by email to
Lamont.Jackson@hq.doe.gov.
Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On May 5, 2008, DOE issued Order
No. EA–339, which authorized Shell
Energy to transmit electric energy from
the United States to Canada as a power
marketer for a five-year term using
existing international transmission
facilities. That authority expires on May
5, 2013. On February 5, 2013, Shell
Energy filed an application with DOE
for renewal of the export authority
contained in Order No. EA–339 for an
additional five-year term.
In its application, Shell Energy states
that it does not own any electric
generating or transmission facilities nor
does the applicant have a franchised
service area. The electric energy that
Shell Energy proposes to export to
Canada would be surplus energy
purchased from electric utilities,
Federal power marketing agencies, and
other entities within the United States.
The existing international transmission
facilities to be utilized by Shell Energy
have previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments on the Shell Energy
application to export electric energy to
Canada should be clearly marked with
OE Docket No. EA–339–A. An
additional copy is to be provided
directly to both Robert Reilley and Jane
Barnett, Shell Energy North America
(US), L.P., 1000 Main, Level 12,
Houston, TX 77002. A final decision
will be made on this application after
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
14779
the environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
a determination is made by DOE that the
proposed action will not have an
adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 28,
2013.
Jon Worthington,
Deputy Assistant Secretary, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2013–05363 Filed 3–6–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–1006–000
Applicants: Colorado Interstate Gas
Company LLC
Description: Operational Purchases
and Sales Report of Colorado Interstate
Gas Company LLC
Filed Date: 8/31/12
Accession Number: 20120831–5156
Comments Due: 5 p.m. ET 3/8/13
Docket Numbers: RP13–596–000
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Fuel Retention Rates—
2013 to be effective 4/1/2013
Filed Date: 2/28/13
Accession Number: 20130228–5065
Comments Due: 5 p.m. ET 3/12/13
Docket Numbers: RP13–597–000
Applicants: Millennium Pipeline
Company, LLC
Description: RAM 2013 to be effective
4/1/2013
Filed Date: 2/28/13
Accession Number: 20130228–5066
Comments Due: 5 p.m. ET 3/12/13
Docket Numbers: RP13–598–000
Applicants: Elba Express Company,
L.L.C.
Description: Elba Express Pipeline
Project—Phase B Compression to be
effective 4/1/2013
Filed Date: 2/28/13
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 78, Number 45 (Thursday, March 7, 2013)]
[Notices]
[Pages 14778-14779]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05362]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-338-A]
Application to Export Electric Energy; Shell Energy North America
(US), L.P.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Shell Energy North America (US), L.P. (Shell Energy) has
applied to renew its authority to transmit electric energy from the
United States to Mexico pursuant to section 202(e) of the Federal Power
Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before April 8, 2013.
ADDRESSES: Comments, protests, or motions to intervene should be
addressed to: Lamont Jackson, Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue SW., Washington, DC 20585-0350. Because of delays
in handling conventional mail, it is recommended that documents be
transmitted by overnight mail, by electronic mail to
Lamont.Jackson@hq.doe.gov, or by facsimile to 202-586-8008.
FOR FURTHER INFORMATION CONTACT: Lamont Jackson (Program Office) at
202-586-0808, or by email to Lamont.Jackson@hq.doe.gov.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the Federal Power Act (16 U.S.C.
824a(e)).
On May 5, 2008, DOE issued Order No. EA-338, which authorized Shell
Energy to transmit electric energy from the United States to Mexico as
a power marketer for a five-year term using existing international
transmission facilities. That authority expires on May 5, 2013. On
February 5, 2013, Shell Energy filed an application with DOE for
renewal of the export authority contained in Order No. EA-338 for an
additional five-year term.
In its application, Shell Energy states that it does not own any
electric generating or transmission facilities nor does the applicant
have a franchised service area. The electric energy that Shell Energy
proposes to export to Mexico would be surplus energy purchased from
electric utilities, Federal power marketing agencies, and other
entities within the United States. The existing international
transmission facilities to be utilized by Shell Energy have previously
been authorized by Presidential permits issued pursuant to Executive
Order 10485, as amended, and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedures (18 CFR 385.211). Any person desiring to become
a party to these proceedings should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five
copies of such comments, protests, or motions to intervene should be
sent to the address provided above on or before the date listed above.
Comments on the Shell Energy application to export electric energy
to
[[Page 14779]]
Mexico should be clearly marked with OE Docket No. EA-338-A. An
additional copy is to be provided directly to both Robert Reilley and
Jane Barnett, Shell Energy North America (US), L.P., 1000 Main, Level
12, Houston, TX 77002. A final decision will be made on this
application after the environmental impacts have been evaluated
pursuant to DOE's National Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after a determination is made by DOE
that the proposed action will not have an adverse impact on the
sufficiency of supply or reliability of the U.S. electric power supply
system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://energy.gov/node/11845, or by
emailing Angela Troy at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 28, 2013.
Jon Worthington,
Deputy Assistant Secretary, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2013-05362 Filed 3-6-13; 8:45 am]
BILLING CODE 6450-01-P