Petition for Waiver of Compliance, 14874-14875 [2013-05340]
Download as PDF
14874
Federal Register / Vol. 78, No. 45 / Thursday, March 7, 2013 / Notices
only one method. The Commission will
post all comments on the Commission’s
Internet Web site (https://www.sec.gov/
rules/sro.shtml). Copies of the
submission, all subsequent
amendments, all written statements
with respect to the proposed rule
change that are filed with the
Commission, and all written
communications relating to the
proposed rule change between the
Commission and any person, other than
those that may be withheld from the
public in accordance with the
provisions of 5 U.S.C. 552, will be
available for Web site viewing and
printing in the Commission’s Public
Reference Room, 100 F Street NE.,
Washington, DC 20549, on official
business days between the hours of
10:00 a.m. and 3:00 p.m. Copies of such
filing also will be available for
inspection and copying at the principal
office of NASDAQ. All comments
received will be posted without change;
the Commission does not edit personal
identifying information from
submissions. You should submit only
information that you wish to make
available publicly. All submissions
should refer to File Number SR–
NASDAQ–2013–034, and should be
submitted on or before March 28, 2013.
For the Commission, by the Division of
Trading and Markets, pursuant to delegated
authority.16
Kevin M. O’Neill,
Deputy Secretary.
[FR Doc. 2013–05247 Filed 3–6–13; 8:45 am]
BILLING CODE 8011–01–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2013–0017]
emcdonald on DSK67QTVN1PROD with NOTICES
Notice of Application for Approval of
Discontinuance or Modification of a
Railroad Signal System
In accordance with Part 235 of Title
49 Code of Federal Regulations and 49
U.S.C. 20502(a), this document provides
the public notice that by a document
dated February 6, 2013, Norfolk
Southern Corporation (NS) has
petitioned the Federal Railroad
Administration (FRA) seeking approval
for the discontinuance or modification
of a signal system. FRA assigned the
petition Docket Number FRA–2013–
0017.
Applicant: Norfolk Southern
Corporation, Mr. Brian Sykes, Chief
Engineer, C&S Engineering, 1200
16 17
CFR 200.30–3(a)(12).
VerDate Mar<15>2010
14:43 Mar 06, 2013
Jkt 229001
Peachtree Street NE., Atlanta, Georgia
30309.
NS seeks approval of the proposed
temporary discontinuance of the signal
system at the Randolph Street Control
Point on the Virginia Division in
Roanoke, VA, during a major track and
signal rationalization project. The
Randolph Street Control Point uses
Microlok for the control of switches and
signals. This Control Point connects
NS’s H-Line, N-Line, and W-Line with
its Roanoke Yard and locations to the
west.
NS will be required to temporarily
discontinue the use of the signal system
while performing a major part of the
track work. The Randolph Street Tower,
where the Microlok system is currently
housed, will be removed to make room
for a new track through that area. NS
estimates the discontinuance of signals
for 90 to 120 days at the Randolph
Street Control Point during its
construction efforts. During that period,
trains will operate through the area at
restricted speed on permission from the
dispatcher, as well as a switch tender on
the ground. NS seeks to have all of the
work completed with its signals tested
and placed back in service in the
November/December 2013 timeframe.
NS seeks to make the proposed changes
to replace the older Microlok system
with newer technology solid-state
equipment, to increase train speeds
through the area, and to facilitate the
installation of Positive Train Control.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulations.gov and in person at
the U.S. Department of Transportation’s
(DOT) Docket Operations Facility, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590. The Docket
Operations Facility is open from 9 a.m.
to 5 p.m., Monday through Friday,
except Federal holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested party desires
an opportunity for oral comment, they
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov/. Follow the online
instructions for submitting comments.
PO 00000
Frm 00112
Fmt 4703
Sfmt 4703
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue, SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
Communications received by April
22, 2013 will be considered by FRA
before final action is taken. Comments
received after that date will be
considered as far as practicable.
Anyone is able to search the
electronic form of any written
communications and comments
received into any of our dockets by the
name of the individual submitting the
comment (or signing the document, if
submitted on behalf of an association,
business, labor union, etc.). See https://
www.regulations.gov/#!privacyNotice
for the privacy notice of regulations.gov
or interested parties may review DOT’s
complete Privacy Act Statement in the
Federal Register published on April 11,
2000 (65 FR 19477).
Issued in Washington, DC, on March 4,
2013.
Robert C. Lauby,
Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2013–05319 Filed 3–6–13; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2012–0005]
Petition for Waiver of Compliance
In accordance with Part 211 of Title
49 Code of Federal Regulations (CFR),
this document provides the public
notice that by a document dated January
30, 2013, NJ Transit (NJT) has petitioned
the Federal Railroad Administration
(FRA) for an extension of temporary
emergency relief from compliance with
certain provisions of the Federal
railroad safety regulations contained at
49 CFR parts 229—Railroad Locomotive
Safety Standards; 236—Rules,
Standards, and Instructions Governing
the Installation, Inspection,
Maintenance, and Repair of Signal and
Train Control Systems, Devices and
Appliances; and 238—Passenger
Equipment Safety Standards due to
severe weather related to Hurricane
Sandy. Specifically, NJT petitions for an
additional 60-day extension of the
waiver from compliance with the
provisions of the following sections of
the CFR: 49 CFR 229.9—Movement of
E:\FR\FM\07MRN1.SGM
07MRN1
emcdonald on DSK67QTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 45 / Thursday, March 7, 2013 / Notices
non-complying locomotives, 49 CFR
229.23–Periodic inspection: general, 49
CFR 27—Annual tests, 49 CFR 236.11–
Adjustment, repair, or replacement of
component, 49 CFR 236.101–Purpose of
inspection and tests; removal from
service of relay or device failing to meet
test requirements, 49 CFR 236.588–
Periodic test, 49 CFR 238.307–Periodic
mechanical inspection of passenger cars
and unpowered vehicles used in
passenger trains, and 49 CFR 238.309,
Periodic brake equipment maintenance.
FRA assigned the petition Docket
Number FRA–2012–0005.
NJT states that its primary
maintenance facility for rail vehicles is
the Meadows Maintenance Complex.
This facility was heavily damaged by
flood waters as a result of the October
29, 2012, hurricane. NJT’s original
estimates of damage to the facility and
restoration to full operating capacity
were made during the week
immediately following the event.
NJT has made recovery efforts in
order to achieve full compliance with
the requirements of the above-cited CFR
regulations. Since the beginning of the
original waiver period, NJT has
performed periodic inspections on 98
locomotives and 27 self-propelled
Arrow vehicles. NJT has also completed
the 180-day inspection for 145 railcars
as part of the unscheduled repair.
Nonetheless, NJT has reviewed its
capabilities and has determined that it
will not be possible to complete all
required inspections, which will be
overdue on the expiration date of this
waiver: February 25, 2013. NJT also
states that removing all overdue
vehicles from service on that date will
severely affect NJT’s ability to provide
sufficient passenger service on all of its
operating lines. FRA conditionally
granted NJT’s extension request on
February 19, 2013.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulations.gov and in person at
the U.S. Department of Transportation’s
(DOT) Docket Operations Facility, 1200
New Jersey Ave. SE., W12–140,
Washington, DC 20590. The Docket
Operations Facility is open from 9 a.m.
to 5 p.m., Monday through Friday,
except on Federal holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested party desires
an opportunity for oral comment, they
should notify FRA, in writing, before
VerDate Mar<15>2010
14:43 Mar 06, 2013
Jkt 229001
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number, and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand delivery: 1200 New Jersey
Avenue SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except on Federal holidays.
Communications received by March
27, 2013 will be considered by FRA
before final action is taken. Comments
received after that date will be
considered as far as is practicable.
Anyone is able to search the
electronic form of any written
communications and comments
received into any of our dockets by the
name of the individual submitting the
comment (or signing the document, if
submitted on behalf of an association,
business, labor union, etc.). See https://
www.regulations.gov/#!privacyNotice
for the privacy notice for
regulations.gov; interested parties may
review DOT’s complete Privacy Act
Statement in the Federal Register
published on April 11, 2000 (65 FR
19477).
Issued in Washington, DC, on March 4,
2013.
Robert C. Lauby,
Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2013–05340 Filed 3–6–13; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2012–0092]
Petition for Waiver of Compliance
In accordance with Part 211 of Title
49 Code of Federal Regulations (CFR),
this document provides the public
notice that by a document dated
November 28, 2012, the BNSF Railway
Company (BNSF) has petitioned the
Federal Railroad Administration (FRA)
for a waiver of compliance from certain
provisions of the Federal railroad safety
regulations contained at 49 CFR part
232—Brake System Safety Standards for
Freight and Other Non-Passenger Trains
and Equipment, End-of-Train Devices.
PO 00000
Frm 00113
Fmt 4703
Sfmt 4703
14875
FRA assigned the petition Docket
Number FRA–2012–0092.
Specifically, BNSF seeks relief with
respect to 49 CFR 232.207(a) for certain
Bakken-oil unit trains that originate at
refineries in North Dakota. These trains,
when headed east out of the refineries,
presently fall marginally short of major
inspection terminals under the 1,000mile inspection requirements pursuant
to 49 CFR 232.207. Under BNSF’s
current operating practice, these trains
are stopping short of terminals that have
qualified mechanical inspectors (QMI),
the train crews are conducting the Class
1A inspections, and then the trains are
continuing on into the terminals. BNSF
believes that the risk of the mileage
addition allowance under the Class 1A
inspections (between 24–198 miles for
the requested trains) will be more than
offset by the QMI inspections that the
trains would receive, if relief is granted.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulations.gov and in person at
the U.S. Department of Transportation’s
(DOT) Docket Operations Facility, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590. The Docket
Operations Facility is open from 9 a.m.
to 5 p.m., Monday through Friday,
except Federal holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested party desires
an opportunity for oral comment, they
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov/. Follow the online
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
Communications received by April 8,
2013 will be considered by FRA before
final action is taken. Comments received
after that date will be considered as far
as practicable.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 78, Number 45 (Thursday, March 7, 2013)]
[Notices]
[Pages 14874-14875]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05340]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA-2012-0005]
Petition for Waiver of Compliance
In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), this document provides the public notice that by a document
dated January 30, 2013, NJ Transit (NJT) has petitioned the Federal
Railroad Administration (FRA) for an extension of temporary emergency
relief from compliance with certain provisions of the Federal railroad
safety regulations contained at 49 CFR parts 229--Railroad Locomotive
Safety Standards; 236--Rules, Standards, and Instructions Governing the
Installation, Inspection, Maintenance, and Repair of Signal and Train
Control Systems, Devices and Appliances; and 238--Passenger Equipment
Safety Standards due to severe weather related to Hurricane Sandy.
Specifically, NJT petitions for an additional 60-day extension of the
waiver from compliance with the provisions of the following sections of
the CFR: 49 CFR 229.9--Movement of
[[Page 14875]]
non-complying locomotives, 49 CFR 229.23-Periodic inspection: general,
49 CFR 27--Annual tests, 49 CFR 236.11-Adjustment, repair, or
replacement of component, 49 CFR 236.101-Purpose of inspection and
tests; removal from service of relay or device failing to meet test
requirements, 49 CFR 236.588-Periodic test, 49 CFR 238.307-Periodic
mechanical inspection of passenger cars and unpowered vehicles used in
passenger trains, and 49 CFR 238.309, Periodic brake equipment
maintenance. FRA assigned the petition Docket Number FRA-2012-0005.
NJT states that its primary maintenance facility for rail vehicles
is the Meadows Maintenance Complex. This facility was heavily damaged
by flood waters as a result of the October 29, 2012, hurricane. NJT's
original estimates of damage to the facility and restoration to full
operating capacity were made during the week immediately following the
event.
NJT has made recovery efforts in order to achieve full compliance
with the requirements of the above-cited CFR regulations. Since the
beginning of the original waiver period, NJT has performed periodic
inspections on 98 locomotives and 27 self-propelled Arrow vehicles. NJT
has also completed the 180-day inspection for 145 railcars as part of
the unscheduled repair. Nonetheless, NJT has reviewed its capabilities
and has determined that it will not be possible to complete all
required inspections, which will be overdue on the expiration date of
this waiver: February 25, 2013. NJT also states that removing all
overdue vehicles from service on that date will severely affect NJT's
ability to provide sufficient passenger service on all of its operating
lines. FRA conditionally granted NJT's extension request on February
19, 2013.
A copy of the petition, as well as any written communications
concerning the petition, is available for review online at
www.regulations.gov and in person at the U.S. Department of
Transportation's (DOT) Docket Operations Facility, 1200 New Jersey Ave.
SE., W12-140, Washington, DC 20590. The Docket Operations Facility is
open from 9 a.m. to 5 p.m., Monday through Friday, except on Federal
holidays.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number, and may be submitted by any of the following
methods:
Web site: https://www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 202-493-2251.
Mail: Docket Operations Facility, U.S. Department of
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC
20590.
Hand delivery: 1200 New Jersey Avenue SE., Room W12-140,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except on Federal holidays.
Communications received by March 27, 2013 will be considered by FRA
before final action is taken. Comments received after that date will be
considered as far as is practicable.
Anyone is able to search the electronic form of any written
communications and comments received into any of our dockets by the
name of the individual submitting the comment (or signing the document,
if submitted on behalf of an association, business, labor union, etc.).
See https://www.regulations.gov/#!privacyNotice for the privacy notice
for regulations.gov; interested parties may review DOT's complete
Privacy Act Statement in the Federal Register published on April 11,
2000 (65 FR 19477).
Issued in Washington, DC, on March 4, 2013.
Robert C. Lauby,
Deputy Associate Administrator for Regulatory and Legislative
Operations.
[FR Doc. 2013-05340 Filed 3-6-13; 8:45 am]
BILLING CODE 4910-06-P