Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 14528-14529 [2013-05118]
Download as PDF
14528
Federal Register / Vol. 78, No. 44 / Wednesday, March 6, 2013 / Notices
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
issued a Notice in the Federal Register
(77 FR 75627, 12/21/2012) requesting
public comments. FERC received no
comments on the FERC–538 and is
making this notation in its submittal to
OMB.
DATES: Comments on the collection of
information are due by April 5, 2013.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0061, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. IC13–4–000, by either of the
following methods:
• eFiling at Commission’s Web Site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION: Title:
FERC–538: Gas Pipelines Certificates:
Section 7(a) Mandatory Initial Service.
OMB Control No.: 1902–0061.
Type of Request: Three-year extension
of the FERC–538 information collection
requirements with no changes to the
reporting requirements.
Abstract: Under sections 7(a), 10(a)
and 16 of Natural Gas Act (NGA),1 upon
application by a person or municipality
authorized to engage in the local
distribution of natural gas, the
Commission may order a natural gas
company to extend or improve its
transportation facilities, and sell natural
gas to the municipality or person and,
for such purpose, to extend its
transportation facilities to communities
immediately adjacent to such facilities
or to territories served by the natural gas
pipeline company. The Commission
uses the application data in order to be
fully informed concerning the applicant,
and the service the applicant is
requesting.
Type of Respondents: Persons or
municipalities authorized to engage in
the local distribution of natural gas.
Estimate of Annual Burden: 2 The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC–538—GAS PIPELINES CERTIFICATES: SECTION 7(A) MANDATORY INITIAL SERVICE
Number of
respondents
Number of
responses per
respondent
Total number
of responses
Average
burden hours
per response
Estimated total
annual burden
(A)
(B)
(A) × (B) = (C)
(D)
(C) × (D)
1
1
1
240
240
pmangrum on DSK3VPTVN1PROD with NOTICES
Gas Pipeline Certificates .......................
The total estimated annual cost
burden to respondents is $16,562 [240
hours * $69.01/hour 3 = $16,562].
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
1 15
U.S.C. 717f–w.
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
2 Burden
VerDate Mar<15>2010
15:01 Mar 05, 2013
Jkt 229001
Dated: February 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–05121 Filed 3–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11169–029]
Mayo Hydropower, LLC, Avalon
Hydropower, LLC; Notice of
Application for Transfer of License,
and Soliciting Comments and Motions
To Intervene
On November 20, 2012, Mayo
Hydropower, LLC (transferor) and
Avalon Hydropower, LLC (transferee)
filed an application for transfer of
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
license for the Avalon Dam Project, No.
11169, located on the Mayo River in
Rockingham County, North Carolina.
Mayo Hydropower, LLC and Avalon
Hydropower, LLC are both owned by
Mr. Dean Edwards and his wife Ms.
Wynona Edwards.
Applicants seek Commission approval
to transfer the license for the Avalon
Dam Project from transferor to
transferee.
Applicants’ Contact: Mr. Dean
Edwards, Manager, Avalon
Hydropower, LLC, 5400 Downing Street,
Dover, Florida 33527, telephone (813)
659–3014.
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments and
motions to intervene: 15 days from the
issuance date of this notice, by the
Commission. Comments and motions to
intervene may be filed electronically via
3 2080 hours = 52 weeks * 40 hours per week (i.e.
1 year of full-time employment).
E:\FR\FM\06MRN1.SGM
06MRN1
Federal Register / Vol. 78, No. 44 / Wednesday, March 6, 2013 / Notices
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–11169) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Dated: February 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–05118 Filed 3–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
pmangrum on DSK3VPTVN1PROD with NOTICES
Filings Instituting Proceedings
15:01 Mar 05, 2013
Jkt 229001
Filings in Existing Proceedings
Docket Numbers: RP13–490–001.
Applicants: Arlington Storage
Company, LLC.
Description: Arlington Storage
Company, LLC—Revised Compliance
Filing to be effective 4/1/2013.
Filed Date: 2/26/13.
Accession Number: 20130226–5137.
Comments Due: 5 p.m. ET 3/4/13.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated February 27, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–05134 Filed 3–5–13; 8:45 am]
Docket Numbers: RP13–584–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: TCO Modernization
Settlement Implementation RP12–1021–
000 to be effective 3/1/2013.
Filed Date: 2/26/13.
Accession Number: 20130226–5055.
Comments Due: 5 p.m. ET 3/11/13.
Docket Numbers: RP13–585–000.
Applicants: Empire Pipeline, Inc.
Description: Deferred State Income
Tax Balance (2012).
Filed Date: 2/26/13.
Accession Number: 20130226–5110.
Comments Due: 5 p.m. ET 3/11/13.
Docket Numbers: RP13–586–000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Section 5
Statement of Transportation Rates to be
effective 4/1/2013.
Filed Date: 2/26/13.
Accession Number: 20130226–5144.
Comments Due: 5 p.m. ET 3/11/13.
VerDate Mar<15>2010
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–989–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Notice of Cancellation of
Point-to-Point Transmission Service
Agreement No. 2423 with AES Shady
Point, LLC.
Filed Date: 2/26/13.
Accession Number: 20130226–5195.
Comments Due: 5 p.m. ET 3/19/13.
Docket Numbers: ER13–990–000.
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
14529
Applicants: NorthWestern
Corporation.
Description: SA 671—NWE MRI
CIAC—Transmission Structure
Relocation to be effective 2/28/2013.
Filed Date: 2/27/13.
Accession Number: 20130227–5022.
Comments Due: 5 p.m. ET 3/20/13.
Docket Numbers: ER13–991–000.
Applicants: Exelon Generation
Company, LLC.
Description: Notice of Succession to
be effective 2/28/2013.
Filed Date: 2/27/13.
Accession Number: 20130227–5023.
Comments Due: 5 p.m. ET 3/20/13.
Docket Numbers: ER13–992–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits 7th Forward Capacity Auction
Results Filing.
Filed Date: 2/26/13.
Accession Number: 20130226–5201.
Comments Due: 5 p.m. ET 4/12/13.
Docket Numbers: ER13–993–000.
Applicants: Constellation Energy
Commodities Group, Inc.
Description: Notice of Cancellation to
be effective 3/1/2013.
Filed Date: 2/27/13.
Accession Number: 20130227–5024.
Comments Due: 5 p.m. ET 3/20/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 27, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–05136 Filed 3–5–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06MRN1.SGM
06MRN1
Agencies
[Federal Register Volume 78, Number 44 (Wednesday, March 6, 2013)]
[Notices]
[Pages 14528-14529]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05118]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11169-029]
Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of
Application for Transfer of License, and Soliciting Comments and
Motions To Intervene
On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon
Hydropower, LLC (transferee) filed an application for transfer of
license for the Avalon Dam Project, No. 11169, located on the Mayo
River in Rockingham County, North Carolina.
Mayo Hydropower, LLC and Avalon Hydropower, LLC are both owned by
Mr. Dean Edwards and his wife Ms. Wynona Edwards.
Applicants seek Commission approval to transfer the license for the
Avalon Dam Project from transferor to transferee.
Applicants' Contact: Mr. Dean Edwards, Manager, Avalon Hydropower,
LLC, 5400 Downing Street, Dover, Florida 33527, telephone (813) 659-
3014.
FERC Contact: Patricia W. Gillis (202) 502-8735.
Deadline for filing comments and motions to intervene: 15 days from
the issuance date of this notice, by the Commission. Comments and
motions to intervene may be filed electronically via
[[Page 14529]]
the Internet. See 18 CFR 385.2001(a)(1) and the instructions on the
Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. If unable to
be filed electronically, documents may be paper-filed. To paper-file,
an original plus seven copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. More information about this project can be viewed
or printed on the eLibrary link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
11169) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Dated: February 27, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-05118 Filed 3-5-13; 8:45 am]
BILLING CODE 6717-01-P