Drawbridge Operation Regulation; Gulf Intracoastal Waterway, LA, 14185 [2013-05071]
Download as PDF
Federal Register / Vol. 78, No. 43 / Tuesday, March 5, 2013 / Rules and Regulations
*
*
*
*
*
[FR Doc. 2013–05151 Filed 3–4–13; 8:45 am]
BILLING CODE 9111–14–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0104]
Drawbridge Operation Regulation; Gulf
Intracoastal Waterway, LA
Coast Guard, DHS.
Notice of deviation from
regulation.
AGENCY:
emcdonald on DSK67QTVN1PROD with RULES
ACTION:
SUMMARY: The Coast Guard has issued a
temporary deviation from the regulation
governing the operation of the Lapalco
Boulevard bascule span drawbridge
across the Harvey Canal Route, Gulf
Intracoastal Waterway (GIWW), mile 2.8
at New Orleans, Jefferson Parish,
Louisiana. The deviation is necessary to
change out the four drive panels for the
motors that operate the bridge. This
deviation allows the bridge to remain
closed to navigation for seven
consecutive days.
DATES: This deviation is effective from
6 a.m. on Monday, March 18, 2013,
until 6 a.m. on Monday, March 25,
2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0104] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Kay Wade,
Bridge Branch Office, Coast Guard;
telephone 504–671–2128, email
Kay.B.Wade@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
VerDate Mar<15>2010
13:43 Mar 04, 2013
Jefferson
Parish has requested a temporary
deviation from the operating schedule
for the Bascule Span Bridge across the
Harvey Canal Route, Intracoastal
Waterway, mile 2.8 at New Orleans,
Jefferson Parish, Louisiana. The bridge
has a vertical clearance of 45 feet above
mean high water in the closed-tonavigation position and unlimited in the
open-to-navigation position. Vessels
requiring a clearance of less than 45 feet
may transit beneath the bridge during
maintenance operations.
In accordance with 33 CFR
117.451(a), the bridge currently opens
on signal for the passage of vessels;
except that, from 6:30 a.m. to 8:30 a.m.
and from 3:45 p.m. to 5:45 p.m. Monday
through Friday except holidays, the
draw need not be opened for the passage
of vessels. This deviation allows the
bridge to remain closed to navigation
from 6 a.m. on Monday, March 18, 2013,
until 6 a.m. on Monday, March 25,
2013. At all other times, the bridge will
open on signal for the passage of vessels
in accordance with 33 CFR 117.451(a).
The closure is necessary in order to
change out the four drive panels for the
motors that operate the bridge. This
maintenance is essential for the
continued operation of the bridge.
Notices will be published in the Eighth
Coast Guard District Local Notice to
Mariners and will be broadcast via the
Coast Guard Broadcast Notice to
Mariners System.
Navigation on the waterway consists
mainly of tugs with tows with some
commercial fishing vessels and
recreational craft. Coordination between
the Coast Guard and the waterway users
determined that there should not be any
significant effects on these vessels. The
bridge will be unable to open during
these repairs; however, an alternate
route is available via the GIWW (Algiers
Alternate Route).
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Approved: March 1, 2013.
David V. Aguilar,
Deputy Commissioner, U.S. Customs and
Border Protection.
Timothy E. Skud,
Deputy Assistant Secretary of the Treasury.
Jkt 229001
Dated: February 21, 2013.
David M. Frank,
Bridge Administrator.
[FR Doc. 2013–05071 Filed 3–4–13; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00031
Fmt 4700
Sfmt 4700
14185
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2013–0091]
RIN 1625–AA00
Safety Zone; MODU KULLUK; Kiliuda
Bay, Kodiak Island, AK to Captains
Bay, Unalaska Island, AK
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard is
establishing a temporary safety zone in
the navigable waters, from surface to
seabed, around the Outer Continental
Shelf Mobile Offshore Drilling Unit
(MODU) KULLUK currently located in
Kiliuda Bay, Kodiak Island, Alaska with
planned towed transit into Captains
Bay, Unalaska Island, AK. The
temporary safety zone will encompass
the navigable waters within a 1000
meter radius of the MODU KULLUK
while it is being towed to and located
within Captains Bay to include while at
anchor and through the loading of the
MODU KULLUK onto the transport ship
M/V XIANG RUI KOU. The purpose of
the safety zone is to protect persons and
vessels from the inherent dangers of
towing and loading operations of the
MODU KULLUK.
DATES: This rule is effective with actual
notice from February 20, 2013 until
March 5, 2013. This rule is effective in
the Code of Federal Regulations from
March 5, 2013 until April 30, 2013.
ADDRESSES: The docket for this rule,
USCG–2013–0091, is available online at
www.regulations.gov by typing in the
docket number in the ‘‘SEARCH’’ box
and clicking ‘‘SEARCH.’’ Next, click on
the Open Docket Folder on the line
associated with this rule. This material
is also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email LCDR Jason Boyle, U.S. Coast
Guard, Seventeenth Coast Guard
District; telephone 907–463–2821,
jason.t.boyle@uscg.mil. If you have
questions on viewing or submitting
material to the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\05MRR1.SGM
05MRR1
Agencies
[Federal Register Volume 78, Number 43 (Tuesday, March 5, 2013)]
[Rules and Regulations]
[Page 14185]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-05071]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0104]
Drawbridge Operation Regulation; Gulf Intracoastal Waterway, LA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
regulation governing the operation of the Lapalco Boulevard bascule
span drawbridge across the Harvey Canal Route, Gulf Intracoastal
Waterway (GIWW), mile 2.8 at New Orleans, Jefferson Parish, Louisiana.
The deviation is necessary to change out the four drive panels for the
motors that operate the bridge. This deviation allows the bridge to
remain closed to navigation for seven consecutive days.
DATES: This deviation is effective from 6 a.m. on Monday, March 18,
2013, until 6 a.m. on Monday, March 25, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0104] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Kay Wade, Bridge Branch Office,
Coast Guard; telephone 504-671-2128, email Kay.B.Wade@uscg.mil. If you
have questions on viewing the docket, call Barbara Hairston, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Jefferson Parish has requested a temporary
deviation from the operating schedule for the Bascule Span Bridge
across the Harvey Canal Route, Intracoastal Waterway, mile 2.8 at New
Orleans, Jefferson Parish, Louisiana. The bridge has a vertical
clearance of 45 feet above mean high water in the closed-to-navigation
position and unlimited in the open-to-navigation position. Vessels
requiring a clearance of less than 45 feet may transit beneath the
bridge during maintenance operations.
In accordance with 33 CFR 117.451(a), the bridge currently opens on
signal for the passage of vessels; except that, from 6:30 a.m. to 8:30
a.m. and from 3:45 p.m. to 5:45 p.m. Monday through Friday except
holidays, the draw need not be opened for the passage of vessels. This
deviation allows the bridge to remain closed to navigation from 6 a.m.
on Monday, March 18, 2013, until 6 a.m. on Monday, March 25, 2013. At
all other times, the bridge will open on signal for the passage of
vessels in accordance with 33 CFR 117.451(a).
The closure is necessary in order to change out the four drive
panels for the motors that operate the bridge. This maintenance is
essential for the continued operation of the bridge. Notices will be
published in the Eighth Coast Guard District Local Notice to Mariners
and will be broadcast via the Coast Guard Broadcast Notice to Mariners
System.
Navigation on the waterway consists mainly of tugs with tows with
some commercial fishing vessels and recreational craft. Coordination
between the Coast Guard and the waterway users determined that there
should not be any significant effects on these vessels. The bridge will
be unable to open during these repairs; however, an alternate route is
available via the GIWW (Algiers Alternate Route).
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 21, 2013.
David M. Frank,
Bridge Administrator.
[FR Doc. 2013-05071 Filed 3-4-13; 8:45 am]
BILLING CODE 9110-04-P