Download as PDF Federal Register / Vol. 78, No. 41 / Friday, March 1, 2013 / Notices Ms. Amy E. Cubbage, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–2875, email: Amy.Cubbage@nrc.gov. SUPPLEMENTARY INFORMATION: FOR FURTHER INFORMATION CONTACT: NUCLEAR REGULATORY COMMISSION [NRC–2013–0041] Proposed Revision to Design of Structures, Components, Equipment and Systems I. Accessing Information and Submitting Comments Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision; request for comment and use. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is revising the following sections in Chapter 3, ‘‘Design of Structures, Components, Equipment, and Systems’’ and is soliciting public comment on NUREG–0800, ‘‘Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,’’ Section 3.7.1, ‘‘Seismic Design Parameters,’’ Section 3.7.2, ‘‘Seismic System Analysis,’’ Section 3.7.3, ‘‘Seismic Subsystem Analysis,’’ Section 3.8.1, ‘‘Concrete Containment,’’ Section 3.8.3, ‘‘Concrete And Steel Internal Structures of Steel Or Concrete Containments, ‘‘Section 3.8.4, ‘‘Other Seismic Category I Structures,’’ and Section 3.8.5, ‘‘Foundations.’’ DATES: Submit comments by April 1, 2013. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may access information and comment submissions related to this document, which the NRC possesses and are publically available, by searching on https:// www.regulations.gov under Docket ID NRC–2013–0041. You may submit comments by any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2013–0041. Address questions about NRC dockets to Carol Gallagher; telephone: 301–492–3668; email: Carol.Gallagher@nrc.gov. • Mail comments to: Cindy Bladey, Chief, Rules, Announcements, and Directives Branch (RADB), Office of Administration, Mail Stop: TWB–05– B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. • Fax comments to: RADB at 301– 492–3446. For additional direction on accessing information and submitting comments, see ‘‘Accessing Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 16:40 Feb 28, 2013 Jkt 229001 A. Accessing Information Please refer to Docket ID NRC–2013– 0041 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and are publicly available, by any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2013–0041. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC Library at https://www.nrc.gov/readingrm/adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS Accession numbers for redline documents comparing current revisions and the proposed revisions of individual sections are available in ADAMS under Accession Nos.: Section 3.7.1, Proposed Revision 4 (ML12352A305), Current Revision 3 (ML070640306), Redline (ML12354A050); Section 3.7.2, Proposed Revision 4 (ML12353A354) Current Revision 3 (ML070640311), Redline (ML12354A053); Section 3.7.3, Proposed Revision 4 (ML12353A357), Current Revision 3 (ML070640313), Redline (ML12354A043); Section 3.8.1, Proposed Revision 4 (ML12353A365), Current Revision 3 (ML100620888), Redline (ML12354A052); Section 3.8.3, Proposed Revision 4 (MLML12353A377), Current Revision 3 (ML100620981), Redline (ML12354A089); and Section 3.8.4, Proposed Revision 4 (ML12353A382), Current Revision 3 (ML100630323), Redline (ML12354A092); Section 3.8.5, Proposed Revision 4 (ML12353A388), Current Revision 3 (ML100621093), Redline (ML12354A096). • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 13911 B. Submitting Comments Please include Docket ID NRC–2013– 0041 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed. The NRC posts all comment submissions at https://www.regulations.gov as well as enters the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information in their comment submissions that they do not want to be publicly disclosed. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Further Information The Office of New Reactors and Office of Nuclear Reactor Regulation are revising these sections from the current versions. In respect of these revisions, details of specific changes are included in the end of each of the revised sections themselves and are shown in the description of changes. The changes to this Standard Review Plan (SRP) Chapter reflect current staff review methods and practices based on lessons learned from NRC reviews of design certification and combined license applications completed since the last revision of this chapter. Changes include: (1) Enhancements to guidance to the staff for evaluating the acceptability of the seismic and civil structural design and analysis issues, (2) updates to review interfaces to improve the efficiency and consistency of staff reviews and (3) updates to references covered in SRP Chapter 3. The NRC staff is issuing this notice to solicit public comments on the proposed SRP Sections in Chapter 3. After the NRC staff considers any public comments, it will make a determination regarding the proposed SRP Sections in Chapter 3. Dated at Rockville, Maryland, this 14th day of February 2012. For the Nuclear Regulatory Commission. Amy E. Cubbage, E:\FR\FM\01MRN1.SGM 01MRN1 13912 Federal Register / Vol. 78, No. 41 / Friday, March 1, 2013 / Notices Chief, Policy Branch, Division of Advanced Reactors and Rulemaking, Office of New Reactors. OFFICE ............ NAME .............. DATE ............... OFFICE ............ NAME .............. DATE ............... OFFICE ............ NAME .............. DATE ............... ADAMS Accession No.: ML12352A297—*Concurrence via email—ADM–012. PM:NRO/DARR/ LA:NRO/DARR/ PM:NRO/DE/SEB1 ..... BC:NRO/DE:SEB ........ NRGA*. APOB*. RSubbaratnam ............ BAbeywickrama ......... J Xu ............................. BThomas ..................... 12/27/2013 ................. 12/21/2012 ................. 1/7/2013 ..................... 1/7/2013 ..................... PM:NRR/DE/EMCB .... BC:NRR/DE/EMCB ..... PM?DPR/NRR ............. D:NRR/DE ................... ATsirigotis .................. MMurphy ................... K.Lenning ................... PHiland ....................... 1/18/2013 ................... 1/22/2013 ................... 1/24/2013 ................... 1/23/2013 ................... OGC/NLO ................... BC:NRO/DARR/APOB. S. Kirkwood ............... ACubbage. 2/11/2013 ................... 02/14/2013. DD:NRO/DE MSuhaibi 1/10/2013 DPS/OIS TDonnel 2/13/2013 OFFICIAL RECORDS COPY Distribution: PUBLIC ............................................................. APOB R/F ......................................................... RSubbaratnam .................................................. ACubbage ......................................................... BThomas ........................................................... TDonnel. BAbeywickrama ............................................... JXu .................................................................... RidsNroDarr ..................................................... RidsNrrDe ......................................................... JXu .................................................................... RidsNroDsarRpac RidsNrrDpr RidsNroDarrApob RidsOgcMailCenter MSuhaibi [FR Doc. 2013–04514 Filed 2–28–13; 8:45 am] OPIC’s Corporate Secretary no later than 5 p.m. Friday, March 8, 2013. Such statement must be typewritten, doublespaced, and may not exceed twenty-five (25) pages. Upon receipt of the required notice, OPIC will prepare an agenda, which will be available at the hearing, that identifies speakers, the subject on which each participant will speak, and the time allotted for each presentation. A written summary of the hearing will be compiled, and such summary will be made available, upon written request to OPIC’s Corporate Secretary, at the cost of reproduction. Written summaries of the projects to be presented at the March 21, 2013 Board meeting will be posted on OPIC’s Web site on or about Friday, March 1, 2013. CONTACT PERSON FOR INFORMATION: Information on the hearing may be obtained from Connie M. Downs at (202) 336–8438, via facsimile at (202) 408– 0297, or via email at Connie.Downs@opic.gov. in the Federal Register (Volume 78, Number 17, Page 5516) on January 25, 2013. No requests were received to provide testimony or submit written statements for the record; therefore, OPIC’s Annual Public Hearing scheduled for 2 p.m., March 13, 2013 has been cancelled. CONTACT PERSON FOR INFORMATION: Information on the hearing cancellation may be obtained from Connie M. Downs at (202) 336–8438, via facsimile at (202) 218–0136, or via email at Connie.Downs@opic.gov. BILLING CODE 7590–01–P OVERSEAS PRIVATE INVESTMENT CORPORATION Sunshine Act; Cancellation Notice of Annual Public Hearing 3:00 p.m., Wednesday, March 13, 2013. PLACE: Offices of the Corporation, Twelfth Floor Board Room, 1100 New York Avenue NW., Washington, DC. STATUS: Hearing OPEN to the Public at 3:00 p.m. PURPOSE: Public Hearing in conjunction with each meeting of OPIC’s Board of Directors, to afford an opportunity for any person to present views regarding the activities of the Corporation. PROCEDURES: Individuals wishing to address the hearing orally must provide advance notice to OPIC’s Corporate Secretary no later than 5 p.m. Friday, March 8, 2013. The notice must include the individual’s name, title, organization, address, and telephone number, and a concise summary of the subject matter to be presented. Oral presentations may not exceed ten (10) minutes. The time for individual presentations may be reduced proportionately, if necessary, to afford all participants who have submitted a timely request an opportunity to be heard. Participants wishing to submit a written statement for the record must submit a copy of such statement to mstockstill on DSK4VPTVN1PROD with NOTICES TIME AND DATE: VerDate Mar<15>2010 16:40 Feb 28, 2013 Jkt 229001 Dated: February 26, 2013. Connie M. Downs, OPIC Corporate Secretary. [FR Doc. 2013–04858 Filed 2–27–13; 11:15 am] BILLING CODE 3210–01–P OVERSEAS PRIVATE INVESTMENT CORPORATION Sunshine Act; Cancellation Notice of Annual Public Hearing OPIC’s Sunshine Act notice of its Annual Public Hearing was published PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 Dated: February 26, 2013. Connie M. Downs, OPIC Corporate Secretary. [FR Doc. 2013–04859 Filed 2–27–13; 11:15 am] BILLING CODE 3210–01–P OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Application for Refund of Retirement Deductions/ FERS (SF 3106) and Current/Former Spouse(s) Notification of Application for Refund of Retirement Deductions Under FERS (SF 3106A) U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for comments. AGENCY: The Retirement Services, Office of Personnel Management (OPM), is offering the general public and other Federal agencies the opportunity to comment on an extension, without change, of a currently approved SUMMARY: E:\FR\FM\01MRN1.SGM 01MRN1

Agencies

[Federal Register Volume 78, Number 41 (Friday, March 1, 2013)]
[Notices]
[Pages 13911-13912]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-04514]



[[Page 13911]]

=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2013-0041]


Proposed Revision to Design of Structures, Components, Equipment 
and Systems

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-draft section revision; request for 
comment and use.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is revising the 
following sections in Chapter 3, ``Design of Structures, Components, 
Equipment, and Systems'' and is soliciting public comment on NUREG-
0800, ``Standard Review Plan for the Review of Safety Analysis Reports 
for Nuclear Power Plants: LWR Edition,'' Section 3.7.1, ``Seismic 
Design Parameters,'' Section 3.7.2, ``Seismic System Analysis,'' 
Section 3.7.3, ``Seismic Subsystem Analysis,'' Section 3.8.1, 
``Concrete Containment,'' Section 3.8.3, ``Concrete And Steel Internal 
Structures of Steel Or Concrete Containments, ``Section 3.8.4, ``Other 
Seismic Category I Structures,'' and Section 3.8.5, ``Foundations.''

DATES: Submit comments by April 1, 2013. Comments received after this 
date will be considered, if it is practical to do so, but the 
Commission is able to ensure consideration only for comments received 
on or before this date.

ADDRESSES: You may access information and comment submissions related 
to this document, which the NRC possesses and are publically available, 
by searching on https://www.regulations.gov under Docket ID NRC-2013-
0041. You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0041. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
     Mail comments to: Cindy Bladey, Chief, Rules, 
Announcements, and Directives Branch (RADB), Office of Administration, 
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
     Fax comments to: RADB at 301-492-3446.
    For additional direction on accessing information and submitting 
comments, see ``Accessing Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Ms. Amy E. Cubbage, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-2875, email: Amy.Cubbage@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Accessing Information and Submitting Comments

A. Accessing Information

    Please refer to Docket ID NRC-2013-0041 when contacting the NRC 
about the availability of information regarding this document. You may 
access information related to this document, which the NRC possesses 
and are publicly available, by any of the following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0041.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly available documents online in the NRC 
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the 
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's 
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS Accession numbers 
for redline documents comparing current revisions and the proposed 
revisions of individual sections are available in ADAMS under Accession 
Nos.: Section 3.7.1, Proposed Revision 4 (ML12352A305), Current 
Revision 3 (ML070640306), Redline (ML12354A050); Section 3.7.2, 
Proposed Revision 4 (ML12353A354) Current Revision 3 (ML070640311), 
Redline (ML12354A053); Section 3.7.3, Proposed Revision 4 
(ML12353A357), Current Revision 3 (ML070640313), Redline (ML12354A043); 
Section 3.8.1, Proposed Revision 4 (ML12353A365), Current Revision 3 
(ML100620888), Redline (ML12354A052); Section 3.8.3, Proposed Revision 
4 (MLML12353A377), Current Revision 3 (ML100620981), Redline 
(ML12354A089); and Section 3.8.4, Proposed Revision 4 (ML12353A382), 
Current Revision 3 (ML100630323), Redline (ML12354A092); Section 3.8.5, 
Proposed Revision 4 (ML12353A388), Current Revision 3 (ML100621093), 
Redline (ML12354A096).
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2013-0041 in the subject line of your 
comment submission, in order to ensure that the NRC is able to make 
your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed. The NRC posts all comment submissions at https://www.regulations.gov as well as enters the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information in their comment submissions 
that they do not want to be publicly disclosed. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Further Information

    The Office of New Reactors and Office of Nuclear Reactor Regulation 
are revising these sections from the current versions. In respect of 
these revisions, details of specific changes are included in the end of 
each of the revised sections themselves and are shown in the 
description of changes.
    The changes to this Standard Review Plan (SRP) Chapter reflect 
current staff review methods and practices based on lessons learned 
from NRC reviews of design certification and combined license 
applications completed since the last revision of this chapter. Changes 
include: (1) Enhancements to guidance to the staff for evaluating the 
acceptability of the seismic and civil structural design and analysis 
issues, (2) updates to review interfaces to improve the efficiency and 
consistency of staff reviews and (3) updates to references covered in 
SRP Chapter 3.
    The NRC staff is issuing this notice to solicit public comments on 
the proposed SRP Sections in Chapter 3. After the NRC staff considers 
any public comments, it will make a determination regarding the 
proposed SRP Sections in Chapter 3.

    Dated at Rockville, Maryland, this 14th day of February 2012.

For the Nuclear Regulatory Commission.

Amy E. Cubbage,

[[Page 13912]]

Chief, Policy Branch, Division of Advanced Reactors and Rulemaking, 
Office of New Reactors.

 
 
 
ADAMS Accession No.: ML12352A297--*Concurrence via email--ADM-012.
 
OFFICE.............................  PM:NRO/DARR/NRGA*.....  LA:NRO/DARR/APOB*.....  PM:NRO/DE/SEB1.......  BC:NRO/DE:SEB........  DD:NRO/DE
NAME...............................  RSubbaratnam..........  BAbeywickrama.........  J Xu.................  BThomas..............  MSuhaibi
DATE...............................  12/27/2013............  12/21/2012............  1/7/2013.............  1/7/2013.............  1/10/2013
OFFICE.............................  PM:NRR/DE/EMCB........  BC:NRR/DE/EMCB........  PM?DPR/NRR...........  D:NRR/DE.............  DPS/OIS
NAME...............................  ATsirigotis...........  MMurphy...............  K.Lenning............  PHiland..............  TDonnel
DATE...............................  1/18/2013.............  1/22/2013.............  1/24/2013............  1/23/2013............  2/13/2013
OFFICE.............................  OGC/NLO...............  BC:NRO/DARR/APOB......
NAME...............................  S. Kirkwood...........  ACubbage..............
DATE...............................  2/11/2013.............  02/14/2013............
 

OFFICIAL RECORDS COPY

    Distribution:

 
 
 
PUBLIC......................  BAbeywickrama.......  RidsNroDsarRpac
APOB R/F....................  JXu.................  RidsNrrDpr
RSubbaratnam................  RidsNroDarr.........  RidsNroDarrApob
ACubbage....................  RidsNrrDe...........  RidsOgcMailCenter
BThomas.....................  JXu.................  MSuhaibi
TDonnel.....................
 

[FR Doc. 2013-04514 Filed 2-28-13; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.