L.E. Bell Construction Company, Inc.; Notice of Termination of Exemption by Implied Surrender and Soliciting Comments, Protests, and Motions To Intervene, 13665-13666 [2013-04657]
Download as PDF
Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular proceeding.
o. Filing and Service of Responsive
Documents—Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE,’’ as
applicable; (2) set forth in the heading
the project number of the proceeding to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, protests or motions to
intervene must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
All comments, protests, or motions to
intervene should relate to project works
which are the subject of the termination
of exemption. A copy of any protest or
motion to intervene must be served
upon each representative of the
Exemptee specified in item g above. If
an intervener files comments or
documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of all other
filings in reference to this notice must
be accompanied by proof of service on
all persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: February 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–04656 Filed 2–27–13; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8233–001]
L.E. Bell Construction Company, Inc.;
Notice of Termination of Exemption by
Implied Surrender and Soliciting
Comments, Protests, and Motions To
Intervene
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of
exemption by implied surrender.
b. Project No.: 8233–001.
c. Date Initiated: February 21, 2013.
d. Exemptee: L.E. Bell Construction
Company, Inc.
e. Name and Location of Project: The
Tallapoosa River Hydroelectric Project
is located on the Tallapoosa River in
Cleburne County, Alabama.
f. Filed Pursuant to: 18 CFR 4.106.
g. Exemptee Contact Information: Mr.
Larry E. Bell and Ms. Lynne B. Pyle, L.E.
Bell Construction Company, Inc., 1226
County Road 11, Heflin, AL, 36264.
h. FERC Contact: Krista Sakallaris
(202)502–6302 or
Krista.Sakallaris@ferc.gov.
i. Deadline for filing comments,
protests, and motions to intervene is 30
days from the issuance of this notice by
the Commission. Please file your
submittal electronically via the Internet
(eFiling) in lieu of paper. Please refer to
the instructions on the Commission’s
Web site under https://www.ferc.gov/
docs-filing/efiling.asp and filing
instructions in the Commission’s
Regulations at 18 CFR section
385.2001(a)(1)(iii).1 To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–8233–001) on any
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
its submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
1 https://www.ferc.gov/legal/fed-sta.asp Select the
link for Code of Federal Regulations and navigate
to § 385.2001.
VerDate Mar<15>2010
19:12 Feb 27, 2013
Jkt 229001
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
13665
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
j. Description of Existing Facilities:
The inoperative project consists of the
following existing facilities: (1) A 16foot-high, 100-foot-long concrete dam;
(2) a reservoir with negligible storage
capacity at elevation 819 feet m.s.l.; (3)
a powerhouse at the base of the dam
containing three generating units with a
total rated capacity of 400 kW; and (4)
a 300-foot-long transmission line tying
into the existing Alabama Power
Company’s system.
k. Description of Proceeding: The
exemptee is in violation of Standard
Article 1 of its exemption, which was
granted on May 13, 1985 (31 FERC ¶
62,201). The Commission’s regulation,
18 CFR 4.106, provides, among other
things, that the Commission reserves the
right to revoke an exemption if any term
or condition of the exemption is
violated. The project has not operated
since 1996 and the reservoir has been
drained.
In November 2010 and in May of 2013
the Commission sent the exemptee
letters providing details for filing a
surrender application and requiring the
exemptee to file information regarding
their intentions to restore operation to
the project. In January 2013, the
Commission sent a letter requiring the
exemptee to show cause why the
Commission should not initial
proceedings to terminate the exemption
for failure to resume generation at the
project. The exemptee has not
responded to any of the Commissions
correspondence, nor have they filed a
surrender application.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–8233–001)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
E:\FR\FM\28FEN1.SGM
28FEN1
13666
Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
and 385.214. In determining the
appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular proceeding.
o. Filing and Service of Responsive
Documents—Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE,’’ as
applicable; (2) set forth in the heading
the project number of the proceeding to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, protests or motions to
intervene must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
All comments, protests, or motions to
intervene should relate to project works
which are the subject of the termination
of exemption. A copy of any protest or
motion to intervene must be served
upon each representative of the
Exemptee specified in item g above. If
an intervener files comments or
documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of all other
filings in reference to this notice must
be accompanied by proof of service on
all persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: February 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–04657 Filed 2–27–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:12 Feb 27, 2013
Jkt 229001
EXPORT-IMPORT BANK
[Public Notice 2013–0015]
Application for Final Commitment for a
Long-Term Loan or Financial
Guarantee in Excess of $100 Million:
AP086677XX
Export-Import Bank of the
United States.
ACTION: Notice.
AGENCY:
This Notice is to inform the
public, in accordance with Section
3(c)(10) of the Charter of the ExportImport Bank of the United States (‘‘ExIm Bank’’), that Ex-Im Bank has received
an application for final commitment for
a long-term loan or financial guarantee
in excess of $100 million (as calculated
in accordance with Section 3(c)(10) of
the Charter). Comments received within
the comment period specified below
will be presented to the Ex-Im Bank
Board of Directors prior to final action
on this Transaction.
Reference: AP086677XX.
Purpose and Use:
Brief description of the purpose of the
transaction:
A direct loan to a Hong Kong-based
company to support the procurement of
two U.S. manufactured satellites as well
as U.S. launch services and launch
insurance.
Brief non-proprietary description of
the anticipated use of the items being
exported:
The loan will enable the Hong Kong
based company to finance the
construction and launch of two U.S.
manufactured satellites. The satellites
are expected to provide additional
capacity to broadcasting and
telecommunications companies in the
company’s existing customer base in
North East Asia, MENA, South Asia,
Australia and ASEAN as well as
potential growth in other markets such
as India and Australasia.
To the extent that Ex-Im Bank is
reasonably aware, the item(s) being
exported are not expected to produce
exports or provide services in
competition with the exportation of
goods or provision of services by a
United States industry.
Parties:
Principal Supplier(s):
• Space Systems/Loral Inc.
• Space Exploration Technologies
Corporation.
Obligor: Asia Satellite
Telecommunications Company Limited.
Guarantor(s): N/A.
Description of Items Being Exported:
To finance the construction and launch
of two U.S. manufactured satellites and
related ground facility equipment, data
SUMMARY:
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
and services, U.S. launch services and
launch insurance.
Information On Decision: Information
on the final decision for this transaction
will be available in the ‘‘Summary
Minutes of Meetings of Board of
Directors’’ on https://www.exim.gov/
newsandevents/boardmeetings/board/.
Confidential Information: Please note
that this notice does not include
confidential or proprietary business
information; information which, if
disclosed, would violate the Trade
Secrets Act; or information which
would jeopardize jobs in the United
States by supplying information that
competitors could use to compete with
companies in the United States.
DATES: Comments must be received on
or before March 25, 2013 to be assured
of consideration before final
consideration of the transaction by the
Board of Directors of Ex-Im Bank.
ADDRESSES: Comments may be
submitted through Regulations.gov at
www.regulations.gov. To submit a
comment, enter EIB–2013–0015 the
heading ‘‘Enter Keyword or ID’’ and
select Search. Follow the instructions
provided at the Submit a Comment
screen. Please include your name,
company name (if any) and EIB–2013–
0015 on any attached document.
Sharon A. Whitt,
Records Clearance Officer.
[FR Doc. 2013–04572 Filed 2–27–13; 8:45 am]
BILLING CODE 6690–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Information Collection Being Reviewed
by the Federal Communications
Commission
Federal Communications
Commission.
ACTION: Notice and request for
comments.
AGENCY:
The Federal Communications
Commission (FCC), as part of its
continuing effort to reduce paperwork
burdens, invites the general public and
other Federal agencies to take this
opportunity to comment on the
following information collection, as
required by the Paperwork Reduction
Act (PRA) of 1995. Comments are
requested concerning whether the
proposed collection of information is
necessary for the proper performance of
the functions of the Commission,
including whether the information shall
have practical utility; the accuracy of
the Commission’s burden estimate;
ways to enhance the quality, utility, and
SUMMARY:
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 78, Number 40 (Thursday, February 28, 2013)]
[Notices]
[Pages 13665-13666]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-04657]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8233-001]
L.E. Bell Construction Company, Inc.; Notice of Termination of
Exemption by Implied Surrender and Soliciting Comments, Protests, and
Motions To Intervene
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of exemption by implied
surrender.
b. Project No.: 8233-001.
c. Date Initiated: February 21, 2013.
d. Exemptee: L.E. Bell Construction Company, Inc.
e. Name and Location of Project: The Tallapoosa River Hydroelectric
Project is located on the Tallapoosa River in Cleburne County, Alabama.
f. Filed Pursuant to: 18 CFR 4.106.
g. Exemptee Contact Information: Mr. Larry E. Bell and Ms. Lynne B.
Pyle, L.E. Bell Construction Company, Inc., 1226 County Road 11,
Heflin, AL, 36264.
h. FERC Contact: Krista Sakallaris (202)502-6302 or
Krista.Sakallaris@ferc.gov.
i. Deadline for filing comments, protests, and motions to intervene
is 30 days from the issuance of this notice by the Commission. Please
file your submittal electronically via the Internet (eFiling) in lieu
of paper. Please refer to the instructions on the Commission's Web site
under https://www.ferc.gov/docs-filing/efiling.asp and filing
instructions in the Commission's Regulations at 18 CFR section
385.2001(a)(1)(iii).\1\ To assist you with eFilings you should refer to
the submission guidelines document at https://www.ferc.gov/help/submission-guide/user-guide.pdf. In addition, certain filing
requirements have statutory or regulatory formatting and other
instructions. You should refer to a list of these ``qualified
documents'' at https://www.ferc.gov/docs-filing/efiling/filing.pdf. You
must include your name and contact information at the end of your
comments. Please include the project number (P-8233-001) on any
documents or motions filed. The Commission strongly encourages
electronic filings; otherwise, you should submit an original and seven
copies of its submittal to the following address: The Secretary,
Federal Energy Regulatory Commission, Mail Code: DHAC, PJ-12, 888 First
Street NE., Washington, DC 20426.
---------------------------------------------------------------------------
\1\ https://www.ferc.gov/legal/fed-sta.asp Select the link for
Code of Federal Regulations and navigate to Sec. 385.2001.
---------------------------------------------------------------------------
j. Description of Existing Facilities: The inoperative project
consists of the following existing facilities: (1) A 16-foot-high, 100-
foot-long concrete dam; (2) a reservoir with negligible storage
capacity at elevation 819 feet m.s.l.; (3) a powerhouse at the base of
the dam containing three generating units with a total rated capacity
of 400 kW; and (4) a 300-foot-long transmission line tying into the
existing Alabama Power Company's system.
k. Description of Proceeding: The exemptee is in violation of
Standard Article 1 of its exemption, which was granted on May 13, 1985
(31 FERC ] 62,201). The Commission's regulation, 18 CFR 4.106,
provides, among other things, that the Commission reserves the right to
revoke an exemption if any term or condition of the exemption is
violated. The project has not operated since 1996 and the reservoir has
been drained.
In November 2010 and in May of 2013 the Commission sent the
exemptee letters providing details for filing a surrender application
and requiring the exemptee to file information regarding their
intentions to restore operation to the project. In January 2013, the
Commission sent a letter requiring the exemptee to show cause why the
Commission should not initial proceedings to terminate the exemption
for failure to resume generation at the project. The exemptee has not
responded to any of the Commissions correspondence, nor have they filed
a surrender application.
l. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-8233-001) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
[[Page 13666]]
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining the appropriate action to take,
the Commission will consider all protests filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular proceeding.
o. Filing and Service of Responsive Documents--Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE,'' as applicable; (2) set forth in the heading
the project number of the proceeding to which the filing responds; (3)
furnish the name, address, and telephone number of the person
commenting, protesting or intervening; and (4) otherwise comply with
the requirements of 18 CFR 385.2001 through 385.2005. All comments,
protests or motions to intervene must set forth their evidentiary basis
and otherwise comply with the requirements of 18 CFR 4.34(b). All
comments, protests, or motions to intervene should relate to project
works which are the subject of the termination of exemption. A copy of
any protest or motion to intervene must be served upon each
representative of the Exemptee specified in item g above. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this notice must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: February 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-04657 Filed 2-27-13; 8:45 am]
BILLING CODE 6717-01-P