Download as PDF Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices comments on the items on the provisional agenda, and announced a public meeting for December 5, 2012. In our sixth Federal Register notice, published on November 28, 2012 (77 FR 71012), we announced a revised date for the public meeting: December 13, 2012. You may obtain information on the above Federal Register notices from the following sources. For information on draft resolutions and decisions, and agenda items, contact the Division of Management Authority (see FOR FURTHER INFORMATION CONTACT, above); and for information on species proposals, contact the Division of Scientific Authority, U.S. Fish and Wildlife Service; 4401 North Fairfax Drive; Room 110; Arlington, VA 22203; telephone 703–358–1708; email, scientificauthority@fws.gov. Our regulations governing this public process are found in 50 CFR 23.87. Pursuant to 50 CFR 23.87(a)(3)(iii), with this notice we are posting on https:// www.regulations.gov (see Docket No. FWS–R9–IA–2011–0087) and on our Web site (https://www.fws.gov/ international/publications-and-media/ federal-register-notices.html) a summary of our proposed negotiating positions on the items included in the CoP16 agenda and proposed amendments to the Appendices, and the reasons for our proposed positions. mstockstill on DSK4VPTVN1PROD with NOTICES On https://www.regulations.gov (see Docket No. FWS–R9–IA–2011–0087) and on our Web site (https:// www.fws.gov/international/ publications-and-media/federal-registernotices.html), we summarize the tentative U.S. negotiating positions on proposals to amend the Appendices (species proposals), draft resolutions and decisions, and agenda items that have been submitted by other countries and the CITES Secretariat. Documents submitted by the United States either alone or as a co-proponent for consideration by the Parties at CoP16 can be found on the Secretariat’s Web site at: https://www.cites.org/eng/cop/16/ doc/index.php. Those documents are: CoP16 Doc. 40 and (co-sponsored with Botswana and South Africa) Doc. 52. The United States, either alone or as a co-proponent, submitted the following proposals to amend Appendices I and II: CoP16 Props. 3, 28–32, 36–38, 42, 53, and 57. We will not provide any additional explanation of the U.S. negotiating positions for documents and proposals that the United States submitted. The introduction in the text of each of the documents the United States submitted contains a discussion 19:12 Feb 27, 2013 Jkt 229001 Available Information on CoP16 Information concerning the results of CoP16 will be available after the close of the meeting on the Secretariat’s Web site at https://www.cites.org; or upon request from the Division of Management Authority (see FOR FURTHER INFORMATION CONTACT, above); or on our Web site (https://www.fws.gov/ international/cites/cop16/). Author This notice was prepared by Bruce J. Weissgold, Division of Management Authority. Authority This notice is published under the authority of the U.S. Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: February 21, 2013. Rowan W. Gould, Acting Director, U.S. Fish and Wildlife Service. [FR Doc. 2013–04573 Filed 2–27–13; 8:45 am] BILLING CODE 4310–55–P Revision, and future Resource Advisory Council business. Before including your address, phone number, email address, or other personal identifying information in your comments, please be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. FOR FURTHER INFORMATION CONTACT: BLM Spokane District, 1103 N. Fancher Rd., Spokane Valley, Washington 99212, or call (509) 536–1200. Persons who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1 (800) 877–8339 to contact the above individual during normal business hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the above individual. You will receive a reply during normal business hours. Daniel C. Picard, Spokane District Manager. [FR Doc. 2013–04635 Filed 2–27–13; 8:45 am] DEPARTMENT OF THE INTERIOR BILLING CODE 4310–33–P Bureau of Land Management [LLORW00000 L102000000.ML0000 13XL1109AF.HAG13–0121] Tentative Negotiating Positions VerDate Mar<15>2010 of the background of the issue and the rationale for submitting the document. 13695 DEPARTMENT OF THE INTERIOR Notice of Public Meeting, Eastern Washington Resource Advisory Council [OMB Number 1010–0176] Bureau of Land Management, Interior. ACTION: Notice of public meeting. AGENCY: In accordance with the Federal Land Policy and Management Act of 1976 and the Federal Advisory Committee Act of 1972, the U.S. Department of the Interior, Bureau of Land Management (BLM) Eastern Washington Resource Advisory Council (EWRAC) will meet as indicated below. DATES: March 21, 2013. SUPPLEMENTARY INFORMATION: The meeting will be open to the public. It will begin at 10 a.m. and end at 2 p.m. on March 21. Members of the public will have an opportunity to address the EWRAC at 10 a.m. The meeting will be held in the City Council Chambers of the City of Moses Lake, 401 S. Balsam, Moses Lake, Washington 98837. Discussion will focus on introduction and orientation for new members, the Eastern Washington and San Juan Resource Management Plan, the U.S. Forest Service Colville Forest Plan SUMMARY: PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 Bureau of Ocean Energy Management Information Collection: Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf; Submitted for OMB Review; Comment Request ACTION: 30-day notice. To comply with the Paperwork Reduction Act of 1995 (PRA), the Bureau of Ocean Energy Management (BOEM) is notifying the public that we have submitted an information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval. This ICR concerns the paperwork requirements in the regulations under ‘‘Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf.’’ This notice provides the public a second opportunity to comment on the paperwork burden of this collection. DATES: Submit written comments by April 1, 2013. ADDRESSES: Submit comments on this ICR to the Desk Officer for the Department of the Interior at OMB– SUMMARY: E:\FR\FM\28FEN1.SGM 28FEN1 13696 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices OIRA at (202) 395–5806 (fax) or OIRA_submission@omb.eop.gov (email). Please provide a copy of your comments to the BOEM Information Collection Clearance Officer, Arlene Bajusz, Bureau of Ocean Energy Management, 381 Elden Street, HM–3127, Herndon, Virginia 20170 (mail) or arlene.bajusz@boem.gov (email). Please reference ICR 1010–0176 in your comment and include your name and return address. FOR FURTHER INFORMATION CONTACT: Arlene Bajusz, Office of Policy, Regulations, and Analysis at arlene.bajusz@boem.gov (email) or (703) 787–1025 (phone). You may review the ICR online at https://www.reginfo.gov. Follow the instructions to review Department of the Interior collections under review by OMB. SUPPLEMENTARY INFORMATION: OMB Control Number: 1010–0176. Title: 30 CFR 585, Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf. Forms: BOEM–0002, BOEM–0003, BOEM–0004, BOEM–0005, BOEM– 0006. Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended (43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the Secretary of the Interior to issue leases, easements, or rights-ofway on the OCS for activities that produce or support production, transportation, or transmission of energy from sources other than oil and gas (renewable energy). Specifically, subsection 8(p) of the OCS Lands Act, as amended by section 388 of the Energy Policy Act of 2005 (Pub. L. 109–58), directs the Secretary of the Interior to issue any necessary regulations to carry out the OCS renewable energy program. The Secretary delegated this authority to the Bureau of Ocean Energy Management (BOEM). The BOEM has issued regulations at 30 CFR part 585 that establish procedures for administering the renewable energy program on the OCS and for authorizing other energy and marine-related activities that involve the alternate use of existing facilities on the OCS. This notice concerns the reporting and recordkeeping elements required by these regulations. Respondents operating under these regulations conduct commercial and noncommercial technology projects that include installation, construction, operation and maintenance, and decommissioning of offshore facilities, as well as possible onshore support facilities. The BOEM must ensure that these activities and operations on the OCS are performed in a safe and environmentally sound manner, do not interfere with the rights of other users on the OCS, and balance the protection and development of OCS resources. Therefore, BOEM needs information concerning the proposed activities, facilities, safety equipment, inspections and tests, and natural and manmade hazards near the site, as well as assurance of fiscal responsibility. The BOEM uses forms to collect some information to ensure proper and efficient administration of OCS renewable energy leases and grants and to document the financial responsibility of lessees and grantees. Forms BOEM– 0002, BOEM–0003, BOEM–0004, and BOEM–0006 are used by renewable energy entities on the OCS to designate an operator and to assign or relinquish a lease or grant. Form BOEM–0005 is used to procure and submit a bond for the purpose of meeting financial assurance requirements as set forth in the regulations. As a result of respondent input, BOEM is rewording one line on BOEM–0005 to match language on a similar form for the oil and gas program; this does not change the burden. The BOEM maintains the submitted forms as official lease and grant records pertaining to operating responsibilities, ownership, and financial responsibility. We will protect information considered proprietary under the Freedom of Information Act (5 U.S.C. 552) and its implementing regulations (43 CFR part 2) and under regulations at 30 CFR 585.113, addressing disclosure of data and information to be made available to the public and others. No items of a sensitive nature are collected. Responses are mandatory or required to obtain a benefit. Frequency: On occasion or annually. Description of Respondents: Companies interested in renewable energy-related uses on the OCS and holders of leases and grants under 30 CFR Part 585. Estimated Reporting and Recordkeeping Hour Burden: The estimated annual hour burden for this collection is 30,902 hours. The following table details the individual components and estimated hour burdens. In calculating the burdens, we assumed that respondents perform certain requirements in the normal course of their activities. We consider these to be usual and customary and took that into account in estimating the burden. Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses Annual burden hours Subpart A—General Provisions 102; 105; 110 ............ These sections contain general references to submitting comments, requests, applications, plans, notices, reports, and/or supplemental information for BOEM approval—burdens covered under specific requirements. 0. 102(e) ........................ State and local governments enter into task force or joint planning or coordination agreement with BOEM. Request general departures not specifically covered elsewhere in part 585. Make oral requests or notifications and submit written follow up within 3 business days not specifically covered elsewhere in part 585. Submit evidence of qualifications to hold a lease or grant; submit required supporting information (electronically if required). 1 ........................................ 2 agreements ................... 2 2 ........................................ 6 requests ......................... 12 1 ........................................ 8 requests ......................... 8 2 ........................................ 20 evidence submissions mstockstill on DSK4VPTVN1PROD with NOTICES 103; 904; 910 ............ 105(c) ......................... 106; 107; 213(e); 230(f); 302(a); 408(b)(7); 409(c); 1005(d); 1007(c); 1013(b)(7). VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 40 13697 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses 106(b)(1) .................... Request exception from exclusion or disqualification from participating in transactions covered by Federal non-procurement debarment and suspension system. 1 ........................................ 1 exception ....................... 106(b)(2), (3); 225; 527(c); 705(c)(2); 1016. Request reconsideration and/or hearing. ...... Requirement not considered IC under 5 CFR 1320.3(h)(9) 0 108; 530(b) ................ Notify BOEM within 3 business days after learning of any action filed alleging respondent is insolvent or bankrupt. 1 ........................................ 1 109 ............................. Notify BOEM in writing of merger, name change, or change of business form no later than 120 days after earliest of either the effective date or filing date. Requirement not considered IC under 5 CFR 1320.3(h)(1). 0 111 ............................. Within 30 days of receiving bill, submit processing fee payments for BOEM document or study preparation to process applications and other requests. .5 ....................................... 2 Annual burden hours 1 1 notice ............................. 4 fee submissions ............ 4 payments × $4,000 = $16,000 111(b)(2), (3) ............. 111(b)(3) .................... Submit comments on proposed processing fee or request approval to perform or directly pay contractor for all or part of any document, study, or other activity, to reduce BOEM processing costs. Perform, conduct, develop, etc., all or part of any document, study, or other activity; and provide results to BOEM to reduce BOEM processing fee. 2 ........................................ 4 processing fee comments or reduction requests. 19,000 ............................... 8 1 submission .................... 19,000 3 contractor payments × $950,000 = $2,850,000 111(b)(3) .................... Pay contractor for all or part of any document, study, or other activity, and provide results to BOEM to reduce BOEM processing costs. 111(b)(7); 118(a); 436(c). Appeal BOEM estimated processing costs, decisions, or orders pursuant to 30 CFR 590. 113(b) ........................ Respond to the Freedom of Information Act release schedule. Request approval to use later edition of a document incorporated by reference or alternative compliance. The Director may occasionally request information to administer and carry out the offshore renewable energy program via Federal Register Notices. 4 ........................................ 1 agreement ..................... 4 1 ........................................ 1 request .......................... 1 4 ........................................ 25 ...................................... 100 118(c); 225(b) ............ Within 15 days of bid rejection, request reconsideration of bid decision or rejection. Requirement not considered IC under 5 CFR 1320.3(h)(9). Subtotal .............. ........................................................................ ........................................... 115(c) ......................... 116 ............................. Exempt under 5 CFR 1320.4(a)(2), (c). 74 responses .................... 0 0 19,179 hours mstockstill on DSK4VPTVN1PROD with NOTICES $2,866,000 non-hour costs Subpart B—Issuance of OCS Renewable Energy Leases 200; 224; 231; 235; 236; 238. VerDate Mar<15>2010 These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 585. 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 0 13698 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses Annual burden hours 0 210; 211(a–c); 212 thru 216. Submit nominations and general comments in response to Federal Register notices on Request for Interest in OCS Leasing, Call for Information and Nominations (Call), Area Identification, and Notices of Sale. Includes industry, State & local governments. Not considered IC as defined in 5 CFR 1320.3(h)(4). 210; 211(a–c); 212 thru 216. Submit comments and required information in response to Federal Register notices on Request for Interest in OCS Leasing, Call for Information and Nominations (Call), Area Identification, and Notices of Sale. Includes industry, State & local governments. Submit bid, payments, and required information in response to Federal Register Final Sale Notice. Within 10 business days, execute 3 copies of lease form and return to BOEM with required payments, including evidence that agent is authorized to act for bidder; if applicable, submit information to support delay in execution—competitive leases. Submit unsolicited request and acquisition fee for a commercial or limited lease. Submit comments in response to Federal Register notice re interest of unsolicited request for a lease. Within 10 business days of receiving lease documents, execute lease; file financial assurance and supporting documentation—noncompetitive leases. 4 ........................................ 30 comments .................... 120 5 ........................................ 12 bids .............................. 60 1 ........................................ 5 lease executions ........... 5 5 ........................................ 5 unsolicited requests ...... 25 4 ........................................ 4 comments ...................... 16 2 ........................................ 5 leases ............................ 10 231(g) ........................ Within 45 days of receiving lease copies, submit rent and rent information. Burdens covered by information collections approved for ONRR 30 CFR Chapter XII. 0 235(b); 236(b) ............ Request additional time to extend preliminary or site assessment term of commercial or limited lease, including revised schedule for SAP, COP, or GAP submission. Request lease be dated and effective 1st day of month in which signed. 1 ........................................ 5 ........................................ 5 1 ........................................ 1 request .......................... 1 238 ............................. Submit project plans ..................................... Burden covered under SAPs & GAPs § 585.600(a), (c). Subtotal .............. ........................................................................ ........................................... 211(d); 216; 220 thru 223; 231(c)(2). 224 ............................. 230; 231(a) ................ 231(b) ........................ 231(g) ........................ 237(b) ........................ 67 responses .................... 0 242 hours Subpart C—ROW Grants and RUE Grants for Renewable Energy Activities 306; 309; 315; 316 .... These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 585. 0 302(a); 305; 306 ........ Submit copies of a request for a new or modified ROW or RUE and required information, including qualifications to hold a grant, in format specified. Submit information in response to Federal Register notice of proposed ROW or RUE grant area or comments on notice of grant auction. Submit bid and payments in response to Federal Register notice of auction for a ROW or RUE grant. Submit decision to accept or reject terms and conditions of noncompetitive ROW or RUE grant. 5 ........................................ 1 ROW/RUE request ........ 5 4 ........................................ 2 comments ...................... 8 5 ........................................ 1 bid .................................. 5 2 ........................................ 1 grant decision ................ 2 ........................................................................ ........................................... 5 responses ...................... 20 hours mstockstill on DSK4VPTVN1PROD with NOTICES 307; 308(a)(1) ............ 308(a)(2), (b); 315; 316. 309 ............................. Subtotal .............. VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13699 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses Annual burden hours Subpart D—Lease and Grant Administration 400; 401; 402; 405; 409; 416, 433. These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 585. 401(b) ........................ Take measures directed by BOEM in cessation order and submit reports in order to resume activities. 100 .................................... 405(d) ........................ Submit written notice of change of address Requirement not considered IC under 5 CFR 1320.3(h)(1). 0 405(e); Form BOEM– 0006. If designated operator (DO) changes, notify BOEM and identify new DO for BOEM approval. Within 90 days after last party executes a transfer agreement, submit copies of a lease or grant assignment application, including originals of each instrument creating or transferring ownership of record title, eligibility and other qualifications; and evidence that agent is authorized to execute assignment, in format specified. Submit request for suspension and required information/payment no later than 90 days prior to lease or grant expiration. Conduct, and if required pay for, site-specific study to evaluate cause of harm or damage; and submit copies of study and results, in format specified. 1 ........................................ 1 new DO notice .............. 1 1 (30 minutes per form × 2 forms = 1 hour). 2 assignment requests/instruments submissions. 2 10 ...................................... 2 suspension requests ..... 20 100 .................................... 1 study/submission ........... 100 408 thru 411; Forms BOEM–0002 and BOEM–0003. 415(a)(1); 416; 420(a), (b); 428(b). 417(b) ........................ 1 cessation measures report. 0 100 1 study × $950,000 = $950,000 425 thru 428; 652(a); 235(a), (c). 435; 658(c)(2); Form BOEM–0004. Request lease or grant renewal no later than 180 days before termination date of your limited lease or grant, or no later than 2 years before termination date of operations term of commercial lease. Submit required information. Submit copies of application to relinquish lease or grant, in format specified. 436; 437 ..................... 2 renewal requests ........... 12 1 ........................................ 2 relinquishments ............. 2 Provide information for reconsideration of BOEM decision to contract or cancel lease or grant area. Subtotal .............. 6 ........................................ Requirement not considered IC under 5 CFR 1320.3(h)(9). ........................................................................ ........................................... 11 responses .................... 0 237 hours $950,000 Subpart E—Payments and Financial Assurance Requirements 0 500 thru 509; 1011 .... mstockstill on DSK4VPTVN1PROD with NOTICES An * indicates the primary cites for providing bonds or other financial assurance, and the burdens include any previous or subsequent references throughout part 585 to furnish, replace, or provide additional bonds, securities, or financial assurance (including riders, cancellations, replacements). This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. In the future BOEM may require electronic filings of certain submissions. Submit payor information, payments and payment information, and maintain auditable records according to ONRR regulations or guidance. Burdens covered by information collections approved for ONRR 30 CFR Chapter XII. 0 506(c)(4) .................... Submit documentation of the gross annual generation of electricity produced by the generating facility on the lease—use same form as authorized by the EIA. (Burden covered under DOE/EIA OMB Control Number 1905–0129 to gather info and fill out form. BOEM’s burden is for submitting a copy). 10 min ............................... 1 VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 6 forms ............................. E:\FR\FM\28FEN1.SGM 28FEN1 13700 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden 510; 506(c)(3) ............ Submit application and required information for waiver or reduction of rental or other payment. Execute and provide $100,000 minimum lease-specific bond or other approved security; or increase bond level if required. Execute and provide commercial lease supplemental bonds in amounts determined by BOEM. Execute and provide decommissioning bond or other financial assurance; schedule for providing the appropriate amount. Submit comments on proposed adjustment to bond amounts. Request bond reduction and submit evidence to justify. Execute and provide $300,000 minimum limited lease or grant-specific bond or increase financial assurance and required iniformation. Surety notice to lessee or ROW/RUE grant holder and BOEM within 5 business days after initiating insolvency or bankruptcy proceeding, or Treasury decertifies surety. In lieu of surety bond, pledge other types of securities, including authority for BOEM to sell and use proceeds and submit required information (1 hour for form). Provide annual certified statements describing the nature and market value, including brokerage firm statements/reports. Demonstrate financial worth/ability to carry out present and future financial obligations, annual updates, and related or subsequent actions/records/reports, etc. Provide third-party indemnity; financial information/statements; additional bond info; executed guarantor agreement and supporting information/documentation/agreements. Guarantor/Surety requests BOEM terminate period of liability and notifies lessee or ROW/RUE grant holder, etc. In lieu of surety bond, request authorization to establish decommissioning account, including written authorizations and approvals associated with account. Notify BOEM promptly of lapse in bond or other security/action filed alleging lessee, surety or guarantor et al is insolvent or bankrupt. Provide agreement from surety issuing new bond to assume all or portion of outstanding liabilities. Within 10 business days following BOEM notice, lessee, grant holder, or surety agrees to and demonstrates to BOEM that lease will be brought into compliance. 1 ........................................ 1 waiver or rental reduction. 1 1 ........................................ 6 base-level lease bonds or other security. 6 1 ........................................ 5 SAP and COP bonds .... 5 1 ........................................ 3 decommissioning bonds 3 1 ........................................ 3 adjustment comments ... 3 5 ........................................ 2 reduction requests ......... 10 1 ........................................ 1 base-level ROW/RUE bond. 1 1 ........................................ 1 surety notice .................. 1 2 ........................................ 1 other security pledge ..... 2 1 ........................................ 1 statement ....................... 1 10 ...................................... 1 ........................................ 10 10 ...................................... 1 ........................................ 10 1 ........................................ 1 request .......................... 1 2 ........................................ 1 decommissioning account. 2 1 ........................................ 1 notice ............................. 1 3 ........................................ 1 surety agreement .......... 3 16 ...................................... 1 agreement demonstration every 2 years. 8 ........................................................................ ........................................... 37 responses .................... 69 hours Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or subsequent references throughout part 585 to submission and approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. 0 * 515; 516; 525(a) thru (f). * 516(a)(2), (3), (b), (c); 517; 525(a) thru (f). 516(a)(4); 521(c) ........ 517(c)(1) .................... 517(c)(2) .................... * 520; 521; 525(a) thru (f); Form BOEM–0005. 525(g) ........................ * 526 Form BOEM– 0005. 526(c) ......................... * 527; 531 .................. 528 ............................. 528(c)(6); 532(b) ........ * 529 .......................... 530 ............................. 533(a)(2)(ii), (iii) ......... 536(b) ........................ mstockstill on DSK4VPTVN1PROD with NOTICES Subtotal .............. Average number of annual responses Annual burden hours Subpart F—Plans and Information Requirements VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13701 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses ** 600(a); 601(a), (b); 605 thru 614; 238; 810. Within time specified after issuance of a competitive lease or grant, or within time specified after determination of no competitive interest, submit copies of SAP, including required information to assist BOEM to comply with NEPA/CZMA such as hazard info, air quality, SEMS, and all required information, certifications, requests, etc., in format specified. If requesting an operations term for commercial lease, within time specified before the end of site assessment term, submit copies of COP, or FERC license application, including required information to assist BOEM to comply with NEPA/CZMA such as hazard info, air quality, SEMS, and all required information, surveys and/ or their results, reports, certifications, project easements, supporting data and information, requests, etc., in format specified. Within time specified after issuance of a competitive lease or grant, or within time specified after determination of no competitive interest, submit copies of GAP, including required information to assist BOEM to comply with NEPA/CZMA such as hazard info, air quality, SEMS, and all required information, surveys and reports, certifications, project easements, requests, etc., in format specified. Submit revised or modified COPs, including project easements, and all required additional information. Until BOEM releases financial assurance, respondents must maintain, and provide to BOEM if requested, all data and information related to compliance with required terms and conditions of SAP, COP, or GAP. Submit revised or modified SAPs and required additional information. Submit copy of SAP or GAP consistency certification and supporting documentation, including noncompetitive leases. Notify BOEM in writing within 30 days of completion of construction and installation activities under SAP. Submit annual report summarizing findings from site assessment activities. Submit annual, or at other time periods as BOEM determines, SAP compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc. Notify BOEM in writing before conducting any activities not approved, or provided for, in SAP; provide additional information if requested. 240 .................................... 6 SAPs ............................. 1,440 1,000 ................................. 3 COPs ............................. 3,000 240 .................................... 1 GAP ............................... 240 50 ...................................... 1 revised or modified COP 50 2 ........................................ 9 records maintenance/ submissions. 18 50 ...................................... 1 revised or modified SAP 50 1 ........................................ 4 leases ............................ 4 1 ........................................ 5 completion construction notices. 5 30 ...................................... 8 annual reports ............... 240 40 ...................................... 8 compliance certifications 320 10 ...................................... 1 notice before activity ..... 10 ** 600(b); 601(c), (d)(1); 606(b); 618; 620 thru 629; 632; 633; 810. ** 600(c); 601(a), (b); 640 thru 648; 651; 238; 810. ** 601(d)(2); 622; 628(f); 632; 634; 658(c)(3); 907. 602 2 .......................... ** 613(a), (d), (e); 617 612; 647 ..................... 615(a) ........................ 615(b) ........................ 615(c) ......................... 617(a) ........................ mstockstill on DSK4VPTVN1PROD with NOTICES 627(c) ......................... Submit oil spill response plan as required by BSEE 30 CFR part 254. 631 ............................. Request deviation from approved COP schedule. Submit annual, or at other time periods as BOEM determines, COP compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc. 633(b) ........................ VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00084 Burden covered under BSEE 1014–0007 Annual burden hours 0 2 ........................................ 1 deviation request ........... 2 50 ...................................... 9 compliance certifications 450 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13702 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses 634(a) ........................ Notify BOEM in writing before conducting any activities not approved or provided for in COP, and provide additional information if requested. Notify BOEM any time commercial operations cease without an approved suspension. Notify BOEM in writing no later than 30 days after commencing activities associated with placement of facilities on lease area. Notify BOEM in writing no later than 30 days after completion of construction and installation activities. Notify BOEM in writing at least 7 days before commencing commercial operations. Submit revised or modified GAPs and required additional information. Before beginning construction of OCS facility described in GAP, complete survey activities identified in GAP and submit initial findings. [This only includes the time involved in submitting the findings; it does not include the survey time as these surveys would be conducted as good business practice.] Notify BOEM in writing within 30 days of completing installation activities under the GAP. Submit annual report summarizing findings from activities conducted under approved GAP. Submit annual, or at other time periods as BOEM determines, GAP compliance certification, recommendations, reports, etc. Notify BOEM in writing before conducting any activities not approved or provided for in GAP, and provide additional information if requested. Notify BOEM any time approved GAP activities cease without an approved suspension. If after construction, cable or pipeline deviate from approved COP or GAP, notify affected lease operators and ROW/RUE grant holders of deviation and provide BOEM evidence of such notices. Determine appropriate air quality modeling protocol, conduct air quality modeling, and submit 3 copies of air quality modeling report and 3 sets of digital files as supporting information to plans. 10 ...................................... 1 notice before activity ..... 10 1 ........................................ 1 termination notice .......... 1 1 ........................................ 3 commence notices ........ 3 1 ........................................ 3 completion notices ........ 3 1 ........................................ 3 initial ops notices ........... 3 50 ...................................... 1 revised or modified GAP 50 30 ...................................... 5 surveys/reports .............. 150 1 ........................................ 5 completion notices ........ 5 30 ...................................... 8 annual reports ............... 240 40 ...................................... 8 compliance certifications 320 10 ...................................... 1 notice before activity ..... 10 1 ........................................ 1 termination notice .......... 1 3 ........................................ 1 deviation notice/BOEM evidence. 3 70 ...................................... 10 air quality modeling reports/information. 700 ........................................................................ ........................................... 108 responses .................. 7,328 hours 635 ............................. 636(a) ........................ 636(b) ........................ 636(c) ......................... ** 642(b); 648; 655; 658(c)(3). 651 ............................. 653(a) ........................ 653(b) ........................ 653(c) ......................... 655(a) ........................ 656 ............................. 658(c)(1) .................... 659 ............................. Subtotal .............. Annual burden hours Subpart G—Facility Design, Fabrication, and Installation mstockstill on DSK4VPTVN1PROD with NOTICES Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 585 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. ***700(a)(1), (b), (c); 701. ***700(a)(2); (b), (c); 702. VerDate Mar<15>2010 Submit Facility Design Report, including copies of the cover letter, certification statement, and all required information (1– 3 paper or electronic copies as specified). Submit copies of a Fabrication and Installation Report, certification statement and all required information, in format specified. 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00085 0 200 .................................... 3 Facility Design Reports 600 160 .................................... 3 Fabrication & Installation Reports. 480 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13703 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden 705(a)(3); 707; 712 .... Certified Verification Agent (CVA) conducts independent assessment of the facility design and submits copies of all reports/certifications to lessee or grant holder and BOEM—interim reports if required, in format specified. 100 .................................... 3 CVA design interim reports. 300 705(a)(3); 708; 709; 710; 712. CVA conducts independent assessments/inspections on the fabrication and installation activities, informs lessee or grant holder if procedures are changed or design specifications are modified; and submits copies of all reports/certifications to lessee or grant holder and BOEM—interim reports if required, in format specified. 100 .................................... 100 .................................... 3 CVA final reports ........... 3 CVA interim reports ....... 300 300 703***; 705(a)(3); 712; 815. CVA/project engineer monitors major project modifications and repairs and submits copies of all reports/certifications to lessee or grant holder and BOEM—interim reports if required, in format specified. 100 .................................... 20 ...................................... 3 CVA final reports ........... 1 interim report ................. 300 20 705(c) ......................... Request waiver of CVA requirement in writing; lessee must demonstrate standard design and best practices. Submit for approval with SAP, COP, or GAP, initial nominations for a CVA or new replacement CVA nomination, and required information. Lessee or grant holder notify BOEM if modifications identified by CVA/project engineer are accepted. Make fabrication quality control, installation towing, and other records available to CVA/project engineer for review (retention required by § 585.714). Notify BOEM within 10 business days after commencing commercial operations. Until BOEM releases financial assurance, compile, retain, and make available to BOEM and/or CVA the as-built drawings, design assumptions/analyses, summary of fabrication and installation examination records, inspection results, and records of repairs not covered in inspection report. Record original and relevant material test results of all primary structural materials; retain records during all stages of construction. 15 ...................................... 40 ...................................... 1 final report ..................... 1 waiver ............................ 15 40 16 ...................................... 13 new CVA nominations 208 1 ........................................ 1 notice ............................. 1 1 ........................................ 3 records retention ........... 3 1 ........................................ 2 commence notices ........ 2 100 .................................... 3 lessees .......................... 300 ........................................... 43 responses .................... 2,869 hours 706 ............................. 708(b)(2) .................... 709(a)(14); 710(a)(2), (e) 2. 713 ............................. 714 2 ........................... Subtotal .............. ........................................................................ Average number of annual responses Annual burden hours Subpart H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs, and GAPs mstockstill on DSK4VPTVN1PROD with NOTICES 801(c), (d) .................. 801(e), (f) ................... VerDate Mar<15>2010 Notify BOEM if endangered or threatened species, or their designated critical habitat, may be in the vicinity of the lease or grant or may be affected by lease or grant activities. Submit information to ensure proposed activities will be conducted in compliance with the Endangered Species Act (ESA) and Marine Mammal Protection Act (MMPA); including agreements and mitigating measures designed to avoid or minimize adverse effects and incidental take of endangered species or critical habitat. 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00086 1 ........................................ 2 notices ........................... 2 6 ........................................ 2 ESA/MMPA submissions 12 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13704 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses 802; 902(e) ................ Notify BOEM of archaeological resource within 72 hours of discovery. If requested, conduct further archaeological investigations and submit report/information. If applicable, submit payment for BOEM costs in carrying out National Historic Preservation Act responsibilities. If required, conduct additional surveys to define boundaries and avoidance distances and submit report. Submit safety management system description with the SAP, COP, or GAP. Report within 24 hours when any required equipment taken out of service for more than 12 hours; provide written confirmation if reported orally. 3 ........................................ 1 archaeological notice ..... 3 10 ...................................... 1 archaeological report ..... 10 .5 ....................................... 1 payment ......................... .5 15 ...................................... 2 survey/report ................. 30 35 ...................................... 350 .5 ....................................... 10 safety management systems. 3 equipment reports ......... 1 ........................................ .5 ....................................... 1 written confirmation ....... 3 return to service notices 1 1.5 1.5 ..................................... 1 analysis report ............... 1.5 2 ........................................ 1 corrective action plan and report. 2 1 ........................................ 4 records retention ........... 4 2 ........................................ 1 reimbursement request 2 24 ...................................... 4 self assessment plans ... 96 36 ...................................... 4 annual reports ............... 144 60 ...................................... 4 assessments and mitigation actions. 240 Oral ................................... .5 ....................................... 6 incidents ........................ 3 Written .............................. 4 ........................................ 1 incident .......................... 4 802(b), (c) .................. 802(d) ........................ 803 ............................. 810***; 614; 627; 632(b); 651. 813(b)(1) .................... 813(b)(3) .................... 815(c) ......................... 816 ............................. 822(a)(2)(iii), (b) ......... 823 ............................. 824(a) 2 ...................... 824(b) ........................ 825 ............................. 830(a), (c); 831 thru 833. Notify BOEM when equipment returned to service; provide written confirmation if reported orally. When required, analyze cable, P/L, or facility damage or failures to determine cause and as soon as available submit comprehensive written report. Submit plan of corrective action report on observed detrimental effects on cable, P/ L, or facility within 30 days of discovery; take remedial action and submit report of remedial action within 30 days after completion. Until BOEM releases financial assurance, maintain records of design, construction, operation, maintenance, repairs, and investigation on or related to lease or ROW/ RUE area; make available to BOEM for inspection. Request reimbursement within 90 days for food, quarters, and transportation provided to BOEM reps during inspection. Develop annual self inspection plan covering all facilities; retain with records, and make available to BOEM upon request. Conduct annual self inspection and submit report by November 1. Based on API RP 2A–WSD, perform assessment of structures, initiate mitigation actions for structures that do not pass assessment process, retain information, and make available to BOEM upon request. Immediately report incidents to BOEM via oral communications, submit written follow-up report within 15 business days after the incident, and submit any required additional information. mstockstill on DSK4VPTVN1PROD with NOTICES 830(d) ........................ Report oil spills as required by BSEE 30 CFR 254. Subtotal .............. ........................................................................ Burden covered under BSEE 1014–0007. ........................................... 52 responses .................... Annual burden hours 1.5 0 908 hours Subpart I—Decommissioning Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 585 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1 13705 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Non-hour cost burdens Section(s) in 30 CFR 585 **** 902; 905, 906; 907; 908(c); 909. 902(d); 908; ............... 910 ............................. 912 ............................. Reporting and recordkeeping requirement 1 Hour burden Average number of annual responses Submit for approval, in format specified, copies of the SAP, COP, or GAP decommissioning application and site clearance plan at least 2 years before decommissioning activities begin, 90 days after completion of activities, or 90 days after cancellation, relinquishment, or other termination of lease or grant. Include documentation of coordination efforts w/States/ CZMA agencies, local or tribal governments, requests that certain facilities remain in place for other activities, be converted to an artificial reef, or be toppled in place. Submit additional information/evidence requested or modify and resubmit application. Notify BOEM at least 60 days before commencing decommissioning activities. Within 60 days after removing a facility, verify to BOEM that site is cleared. Within 60 days after removing a facility, cable, or pipeline, submit a written report. 20 ...................................... 1 decommissioning application. 20 1 ........................................ 1 decommissioning notice 1 1 ........................................ 1 removal verification ....... 1 8 ........................................ 1 removal report ............... 8 Annual burden hours BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a minimal burden. Subtotal .............. ........................................................................ ........................................... 4 responses ...................... 30 hours Subpart J—RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities 1004, 1005, 1006 ...... 1007(c) ....................... 1007(f) ....................... 1010(c) ....................... 1012; 1016(b) ............ 1013 ........................... 1015 ........................... Subtotal .............. Total Burden 1 ........................................ 1 request for RUE to use existing facility. 1 4 ........................................ 1 response ........................ 4 5 ........................................ 1 submission .................... 5 1 ........................................ 1 decision ......................... 1 6 ........................................ 1 ........................................ 1 renewal request ............. 1 bond or other security ... 6 1 1 ........................................ 1 RUE assignment request. 1 1 ........................................ 1 RUE relinquish .............. 1 ........................................................................ ........................................... 8 responses ...................... 20 hours 409 Responses ................ 1007(a), (b), (c) ......... Contact owner of existing facility and/or lessee of the area to reach preliminary agreement to use facility and obtain concurring signatures; submit request to BOEM for an alternative use RUE, including all required information/modifications. Submit indication of competitive interest in response to Federal Register notice. Submit description of proposed activities and required information in response to Federal Register notice of competitive offering. Lessee or owner of facility submits decision to accept or reject proposals deemed acceptable by BOEM. Request renewal of Alternate Use RUE ....... Provide financial assurance as BOEM determines in approving RUE for an existing facility, including additional security if required. Submit request for assignment of an alternative use RUE for an existing facility, including all required information. Request relinquishment of RUE for an existing facility. 30,902 Hours ........................................................................ ........................................... $3,816,000 Non-Hour Cost Burdens 1 In mstockstill on DSK4VPTVN1PROD with NOTICES the future, BOEM may require electronic filing of certain submissions. 2 Retention of these records is usual and customary business practice; the burden is primarily to make them available to BOEM and CVAs. Estimated Reporting and Recordkeeping Non-Hour Cost Burden: The estimated non-hour cost burdens total $3,816,000. The non-hour cost burdens consist of service fees for BOEM document/study preparation, VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 costs for paying a contractor instead of BOEM, and costs for a site-specific study and report to evaluate the cause of harm to natural resources. Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) provides that an PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 agency may not conduct or sponsor a collection of information unless it displays a currently valid OMB control number. Until OMB approves a collection of information, you are not obligated to respond. E:\FR\FM\28FEN1.SGM 28FEN1 13706 Federal Register / Vol. 78, No. 40 / Thursday, February 28, 2013 / Notices Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et seq.,) requires each agency ‘‘* * * to provide notice * * * and otherwise consult with members of the public and affected agencies concerning each proposed collection of information * * *’’ Agencies must specifically solicit comments to: (a) Evaluate whether the collection is necessary or useful; (b) evaluate the accuracy of the burden of the proposed collection of information; (c) enhance the quality, usefulness, and clarity of the information to be collected; and (d) minimize the burden on the respondents, including the use of technology. To comply with the public consultation process, on October 10, 2012, BOEM published a Federal Register notice (77 FR 61633) announcing that we would submit this ICR to OMB for approval. This notice provided the required 60-day comment period. We received one comment. The Marine Mammal Commission states that BOEM’s reporting requirements provide a systematic and uniform method to track compliance with regulations, including those that protect marine resources. Therefore, the Commission supports BOEM’s request to OMB to approve the renewal of this collection. Public Availability of Comments: Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. Dated:February 7, 2013. Deanna Meyer-Pietruszka, Chief, Office of Policy, Regulations, and Analysis. BILLING CODE 4510–MR–P INTERNATIONAL TRADE COMMISSION mstockstill on DSK4VPTVN1PROD with NOTICES Notice of Appointment of Individuals To Serve as Members of Performance Review Board United States International Trade Commission. ACTION: Appointment of Individuals to Serve as Members of Performance Review Board. DATES: Effective Date: February 22, 2013. VerDate Mar<15>2010 19:12 Feb 27, 2013 Jkt 229001 Chair of the PRB: Commissioner Daniel R. Pearson Vice-Chair of the PRB: Commissioner Dean A. Pinkert Member—Catherine DeFilippo Member—Robert B. Koopman Member—Karen Laney Member—Bill Dobryzkowski Member—Andrew Martin Member—Stephen A. McLaughlin Member—Lyn M Schlitt FOR FURTHER INFORMATION CONTACT: Patricia Connelly, Director of Human Resources, U.S. International Trade Commission (202) 205–2651. Authority: This notice is published in the Federal Register pursuant to the requirement of 5 U.S.C. 4314(c)(4). Hearing impaired individuals are advised that information on this matter can be obtained by contacting our TDD terminal on (202) 205–1810. By order of the Chairman. Issued: February 22, 2013. Lisa R. Barton, Acting Secretary to the Commission. [FR Doc. 2013–04557 Filed 2–27–13; 8:45 am] BILLING CODE 7020–02–P has been developed in accordance with guidance issued on November 5, 2010 by the Office of Management and Budget’s Office of Federal Procurement Policy (OFPP). OFPP’s guidance is available at https://www.whitehouse.gov/ sites/default/files/omb/procurement/ memo/service-contract-inventoriesguidance-11052010.pdf. The FY 2012 inventory planned analysis provides information on which functional areas will be reviewed by the agency. The United States International Trade Commission has posted its FY 2012 inventory, FY 2012 planned analysis, and FY 2011 inventory analysis at the following link: https://www.usitc.gov/ procurement/. FOR FURTHER INFORMATION CONTACT: Questions regarding the service contract inventory should be directed to Celeste Rueffert, Office of Procurement, United States International Trade Commission, 500 E Street SW., Washington, DC 20436, at (202) 205–2252 or celeste.rueffert@usitc.gov. By order of the Commission. Issued: February 22, 2013. Lisa R. Barton, Acting Secretary to the Commission. [FR Doc. 2013–04558 Filed 2–27–13; 8:45 am] BILLING CODE 7020–02–P INTERNATIONAL TRADE COMMISSION DEPARTMENT OF JUSTICE Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract Inventory, and FY 2012 Service Contract Inventory Planned Analysis for the U.S. International Trade Commission U.S. International Trade Commission. ACTION: Notice. AGENCY: In accordance with Section 743 of Division C of the Consolidated Appropriations Act of 2010 (Pub. L. 111–117), the United States International Trade Commission is publishing this notice to advise the public of the availability of the FY 2011 Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service Contract Inventory Planned Analysis. The FY 2011 inventory analysis provides information on specific service contract actions that were analyzed as part of the FY 2011 inventory. The FY 2012 inventory provides information on service contract actions over $25,000 that were made in FY 2012. The inventory information is organized by function to show how contracted resources are distributed throughout the agency. The inventory SUMMARY: [FR Doc. 2013–04626 Filed 2–27–13; 8:45 am] AGENCY: The Chairman of the U.S. International Trade Commission has appointed the following individuals to serve on the Commission’s Performance Review Board (PRB): SUMMARY: PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 Notice of Lodging of Second Modified Consent Decree Under the Clean Water Act In accordance with 28 CFR 50.7, notice is hereby given that on February 22, 2013, a Second Modified Consent Decree in United States and League of Women Voters of New Orleans, et al. v. Sewerage and Water Board of New Orleans, et al., C.A. No. 2:93–cv–03212– MVL (E.D. La.), was lodged with the United States District Court for the Eastern District of Louisiana. The Sewerage and Water Board of New Orleans (‘‘Board’’) is currently implementing the Modified Consent Decree, which was approved by the Court on March 23, 2010. The Modified Consent Decree incorporates comprehensive remedial measures designed to address, prevent, and eliminate unauthorized discharges from the East Bank collection system. The Second Modified Consent Decree extends certain dates in the Modified Consent Decree for completing remedial work in two basins. Specifically, the Second Modified Consent Decree extends the dates for completing remedial work at the Ninth Ward basin from March 31, 2013 to March 31, 2018 E:\FR\FM\28FEN1.SGM 28FEN1

Agencies

[Federal Register Volume 78, Number 40 (Thursday, February 28, 2013)]
[Notices]
[Pages 13695-13706]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-04626]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[OMB Number 1010-0176]


Information Collection: Renewable Energy and Alternate Uses of 
Existing Facilities on the Outer Continental Shelf; Submitted for OMB 
Review; Comment Request

ACTION: 30-day notice.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), the 
Bureau of Ocean Energy Management (BOEM) is notifying the public that 
we have submitted an information collection request (ICR) to the Office 
of Management and Budget (OMB) for review and approval. This ICR 
concerns the paperwork requirements in the regulations under 
``Renewable Energy and Alternate Uses of Existing Facilities on the 
Outer Continental Shelf.'' This notice provides the public a second 
opportunity to comment on the paperwork burden of this collection.

DATES: Submit written comments by April 1, 2013.

ADDRESSES: Submit comments on this ICR to the Desk Officer for the 
Department of the Interior at OMB-

[[Page 13696]]

OIRA at (202) 395-5806 (fax) or OIRA_submission@omb.eop.gov (email). 
Please provide a copy of your comments to the BOEM Information 
Collection Clearance Officer, Arlene Bajusz, Bureau of Ocean Energy 
Management, 381 Elden Street, HM-3127, Herndon, Virginia 20170 (mail) 
or arlene.bajusz@boem.gov (email). Please reference ICR 1010-0176 in 
your comment and include your name and return address.

FOR FURTHER INFORMATION CONTACT: Arlene Bajusz, Office of Policy, 
Regulations, and Analysis at arlene.bajusz@boem.gov (email) or (703) 
787-1025 (phone). You may review the ICR online at https://www.reginfo.gov. Follow the instructions to review Department of the 
Interior collections under review by OMB.

SUPPLEMENTARY INFORMATION:
    OMB Control Number: 1010-0176.
    Title: 30 CFR 585, Renewable Energy and Alternate Uses of Existing 
Facilities on the Outer Continental Shelf.
    Forms: BOEM-0002, BOEM-0003, BOEM-0004, BOEM-0005, BOEM-0006.
    Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended 
(43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the 
Secretary of the Interior to issue leases, easements, or rights-of-way 
on the OCS for activities that produce or support production, 
transportation, or transmission of energy from sources other than oil 
and gas (renewable energy). Specifically, subsection 8(p) of the OCS 
Lands Act, as amended by section 388 of the Energy Policy Act of 2005 
(Pub. L. 109-58), directs the Secretary of the Interior to issue any 
necessary regulations to carry out the OCS renewable energy program. 
The Secretary delegated this authority to the Bureau of Ocean Energy 
Management (BOEM).
    The BOEM has issued regulations at 30 CFR part 585 that establish 
procedures for administering the renewable energy program on the OCS 
and for authorizing other energy and marine-related activities that 
involve the alternate use of existing facilities on the OCS. This 
notice concerns the reporting and recordkeeping elements required by 
these regulations.
    Respondents operating under these regulations conduct commercial 
and noncommercial technology projects that include installation, 
construction, operation and maintenance, and decommissioning of 
offshore facilities, as well as possible onshore support facilities. 
The BOEM must ensure that these activities and operations on the OCS 
are performed in a safe and environmentally sound manner, do not 
interfere with the rights of other users on the OCS, and balance the 
protection and development of OCS resources. Therefore, BOEM needs 
information concerning the proposed activities, facilities, safety 
equipment, inspections and tests, and natural and manmade hazards near 
the site, as well as assurance of fiscal responsibility.
    The BOEM uses forms to collect some information to ensure proper 
and efficient administration of OCS renewable energy leases and grants 
and to document the financial responsibility of lessees and grantees. 
Forms BOEM-0002, BOEM-0003, BOEM-0004, and BOEM-0006 are used by 
renewable energy entities on the OCS to designate an operator and to 
assign or relinquish a lease or grant. Form BOEM-0005 is used to 
procure and submit a bond for the purpose of meeting financial 
assurance requirements as set forth in the regulations. As a result of 
respondent input, BOEM is rewording one line on BOEM-0005 to match 
language on a similar form for the oil and gas program; this does not 
change the burden. The BOEM maintains the submitted forms as official 
lease and grant records pertaining to operating responsibilities, 
ownership, and financial responsibility.
    We will protect information considered proprietary under the 
Freedom of Information Act (5 U.S.C. 552) and its implementing 
regulations (43 CFR part 2) and under regulations at 30 CFR 585.113, 
addressing disclosure of data and information to be made available to 
the public and others. No items of a sensitive nature are collected. 
Responses are mandatory or required to obtain a benefit.
    Frequency: On occasion or annually.
    Description of Respondents: Companies interested in renewable 
energy-related uses on the OCS and holders of leases and grants under 
30 CFR Part 585.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this collection is 30,902 hours. The following 
table details the individual components and estimated hour burdens. In 
calculating the burdens, we assumed that respondents perform certain 
requirements in the normal course of their activities. We consider 
these to be usual and customary and took that into account in 
estimating the burden.

----------------------------------------------------------------------------------------------------------------
                                                                                     Non-hour cost burdens
                                      Reporting and                          -----------------------------------
   Section(s) in  30 CFR 585          recordkeeping           Hour burden      Average number of   Annual burden
                                     requirement \1\                           annual responses        hours
----------------------------------------------------------------------------------------------------------------
                                          Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102; 105; 110..................  These sections contain general references    0.................
                                  to submitting comments, requests,
                                  applications, plans, notices, reports, and/
                                  or supplemental information for BOEM
                                  approval--burdens covered under specific
                                  requirements.
��������������������������������
102(e).........................  State and local          1.................  2 agreements......               2
                                  governments enter into
                                  task force or joint
                                  planning or
                                  coordination agreement
                                  with BOEM.
103; 904; 910..................  Request general          2.................  6 requests........              12
                                  departures not
                                  specifically covered
                                  elsewhere in part 585.
105(c).........................  Make oral requests or    1.................  8 requests........               8
                                  notifications and
                                  submit written follow
                                  up within 3 business
                                  days not specifically
                                  covered elsewhere in
                                  part 585.
106; 107; 213(e); 230(f);        Submit evidence of       2.................  20 evidence                     40
 302(a); 408(b)(7); 409(c);       qualifications to hold                       submissions.
 1005(d); 1007(c); 1013(b)(7).    a lease or grant;
                                  submit required
                                  supporting information
                                  (electronically if
                                  required).

[[Page 13697]]

 
106(b)(1)......................  Request exception from   1.................  1 exception.......               1
                                  exclusion or
                                  disqualification from
                                  participating in
                                  transactions covered
                                  by Federal non-
                                  procurement debarment
                                  and suspension system.
                                -----------------------------------------------------------------
106(b)(2), (3); 225; 527(c);     Request reconsideration  Requirement not considered IC under 5                0
 705(c)(2); 1016.                 and/or hearing..         CFR 1320.3(h)(9)
                                -----------------------------------------------------------------
108; 530(b)....................  Notify BOEM within 3     1.................  1 notice..........               1
                                  business days after
                                  learning of any action
                                  filed alleging
                                  respondent is
                                  insolvent or bankrupt.
                                -----------------------------------------------------------------
109............................  Notify BOEM in writing   Requirement not considered IC under 5                0
                                  of merger, name          CFR 1320.3(h)(1).
                                  change, or change of
                                  business form no later
                                  than 120 days after
                                  earliest of either the
                                  effective date or
                                  filing date.
                                -----------------------------------------------------------------
111............................  Within 30 days of        .5................  4 fee submissions.               2
                                  receiving bill, submit
                                  processing fee
                                  payments for BOEM
                                  document or study
                                  preparation to process
                                  applications and other
                                  requests.
                                                         -------------------------------------------------------
                                                                       4 payments x $4,000 = $16,000
                                                         -------------------------------------------------------
111(b)(2), (3).................  Submit comments on       2.................  4 processing fee                 8
                                  proposed processing                          comments or
                                  fee or request                               reduction
                                  approval to perform or                       requests.
                                  directly pay
                                  contractor for all or
                                  part of any document,
                                  study, or other
                                  activity, to reduce
                                  BOEM processing costs.
111(b)(3)......................  Perform, conduct,        19,000............  1 submission......          19,000
                                  develop, etc., all or
                                  part of any document,
                                  study, or other
                                  activity; and provide
                                  results to BOEM to
                                  reduce BOEM processing
                                  fee.
                                                         -------------------------------------------------------
111(b)(3)......................  Pay contractor for all        3 contractor payments x $950,000 = $2,850,000
                                  or part of any
                                  document, study, or
                                  other activity, and
                                  provide results to
                                  BOEM to reduce BOEM
                                  processing costs.
                                                         -------------------------------------------------------
111(b)(7); 118(a); 436(c)......  Appeal BOEM estimated     Exempt under 5 CFR 1320.4(a)(2), (c).               0
                                  processing costs,
                                  decisions, or orders
                                  pursuant to 30 CFR 590.
                                                         ----------------------------------------
113(b).........................  Respond to the Freedom   4.................  1 agreement.......               4
                                  of Information Act
                                  release schedule.
115(c).........................  Request approval to use  1.................  1 request.........               1
                                  later edition of a
                                  document incorporated
                                  by reference or
                                  alternative compliance.
116............................  The Director may         4.................  25................             100
                                  occasionally request
                                  information to
                                  administer and carry
                                  out the offshore
                                  renewable energy
                                  program via Federal
                                  Register Notices.
                                                         ----------------------------------------
118(c); 225(b).................  Within 15 days of bid    Requirement not considered IC under 5                0
                                  rejection, request       CFR 1320.3(h)(9).
                                  reconsideration of bid
                                  decision or rejection.
                                                         -------------------------------------------------------
    Subtotal...................  .......................  ..................  74 responses......    19,179 hours
                                                                             -----------------------------------
                                                                                   $2,866,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                               Subpart B--Issuance of OCS Renewable Energy Leases
----------------------------------------------------------------------------------------------------------------
200; 224; 231; 235; 236; 238...  These sections contain references to information submissions,                 0
                                  approvals, requests, applications, plans, payments, etc., the
                                  burdens for which are covered elsewhere in part 585.
                                -----------------------------------------------------------------

[[Page 13698]]

 
210; 211(a-c); 212 thru 216....  Submit nominations and   Not considered IC as defined in 5 CFR                0
                                  general comments in      1320.3(h)(4).
                                  response to Federal
                                  Register notices on
                                  Request for Interest
                                  in OCS Leasing, Call
                                  for Information and
                                  Nominations (Call),
                                  Area Identification,
                                  and Notices of Sale.
                                  Includes industry,
                                  State & local
                                  governments.
                                                         ----------------------------------------
210; 211(a-c); 212 thru 216....  Submit comments and      4.................  30 comments.......             120
                                  required information
                                  in response to Federal
                                  Register notices on
                                  Request for Interest
                                  in OCS Leasing, Call
                                  for Information and
                                  Nominations (Call),
                                  Area Identification,
                                  and Notices of Sale.
                                  Includes industry,
                                  State & local
                                  governments.
211(d); 216; 220 thru 223;       Submit bid, payments,    5.................  12 bids...........              60
 231(c)(2).                       and required
                                  information in
                                  response to Federal
                                  Register Final Sale
                                  Notice.
224............................  Within 10 business       1.................  5 lease executions               5
                                  days, execute 3 copies
                                  of lease form and
                                  return to BOEM with
                                  required payments,
                                  including evidence
                                  that agent is
                                  authorized to act for
                                  bidder; if applicable,
                                  submit information to
                                  support delay in
                                  execution--competitive
                                  leases.
230; 231(a)....................  Submit unsolicited       5.................  5 unsolicited                   25
                                  request and                                  requests.
                                  acquisition fee for a
                                  commercial or limited
                                  lease.
231(b).........................  Submit comments in       4.................  4 comments........              16
                                  response to Federal
                                  Register notice re
                                  interest of
                                  unsolicited request
                                  for a lease.
231(g).........................  Within 10 business days  2.................  5 leases..........              10
                                  of receiving lease
                                  documents, execute
                                  lease; file financial
                                  assurance and
                                  supporting
                                  documentation--noncomp
                                  etitive leases.
                                                         ----------------------------------------
231(g).........................  Within 45 days of        Burdens covered by information                       0
                                  receiving lease          collections approved for ONRR 30 CFR
                                  copies, submit rent      Chapter XII.
                                  and rent information.
                                                         ----------------------------------------
235(b); 236(b).................  Request additional time  1.................  5.................               5
                                  to extend preliminary
                                  or site assessment
                                  term of commercial or
                                  limited lease,
                                  including revised
                                  schedule for SAP, COP,
                                  or GAP submission.
237(b).........................  Request lease be dated   1.................  1 request.........               1
                                  and effective 1st day
                                  of month in which
                                  signed.
                                                         ----------------------------------------
238............................  Submit project plans...  Burden covered under SAPs & GAPs Sec.                0
                                                            585.600(a), (c).
                                                         -------------------------------------------------------
    Subtotal...................  .......................  ..................  67 responses......       242 hours
----------------------------------------------------------------------------------------------------------------
                      Subpart C--ROW Grants and RUE Grants for Renewable Energy Activities
----------------------------------------------------------------------------------------------------------------
306; 309; 315; 316.............  These sections contain references to information submissions,                 0
                                  approvals, requests, applications, plans, payments, etc., the
                                  burdens for which are covered elsewhere in part 585.
                                -----------------------------------------------------------------
302(a); 305; 306...............  Submit copies of a       5.................  1 ROW/RUE request.               5
                                  request for a new or
                                  modified ROW or RUE
                                  and required
                                  information, including
                                  qualifications to hold
                                  a grant, in format
                                  specified.
307; 308(a)(1).................  Submit information in    4.................  2 comments........               8
                                  response to Federal
                                  Register notice of
                                  proposed ROW or RUE
                                  grant area or comments
                                  on notice of grant
                                  auction.
308(a)(2), (b); 315; 316.......  Submit bid and payments  5.................  1 bid.............               5
                                  in response to Federal
                                  Register notice of
                                  auction for a ROW or
                                  RUE grant.
309............................  Submit decision to       2.................  1 grant decision..               2
                                  accept or reject terms
                                  and conditions of
                                  noncompetitive ROW or
                                  RUE grant.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  5 responses.......        20 hours
----------------------------------------------------------------------------------------------------------------

[[Page 13699]]

 
                                    Subpart D--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 401; 402; 405; 409; 416,    These sections contain references to information submissions,                 0
 433.                             approvals, requests, applications, plans, payments, etc., the
                                  burdens for which are covered elsewhere in part 585.
                                -----------------------------------------------------------------
401(b).........................  Take measures directed   100...............  1 cessation                    100
                                  by BOEM in cessation                         measures report.
                                  order and submit
                                  reports in order to
                                  resume activities.
                                                         ----------------------------------------
405(d).........................  Submit written notice    Requirement not considered IC under 5                0
                                  of change of address.    CFR 1320.3(h)(1).
                                                         ----------------------------------------
405(e); Form BOEM-0006.........  If designated operator   1.................  1 new DO notice...               1
                                  (DO) changes, notify
                                  BOEM and identify new
                                  DO for BOEM approval.
408 thru 411; Forms BOEM-0002    Within 90 days after     1 (30 minutes per   2 assignment                     2
 and BOEM-0003.                   last party executes a    form x 2 forms =    requests/
                                  transfer agreement,      1 hour).            instruments
                                  submit copies of a                           submissions.
                                  lease or grant
                                  assignment
                                  application, including
                                  originals of each
                                  instrument creating or
                                  transferring ownership
                                  of record title,
                                  eligibility and other
                                  qualifications; and
                                  evidence that agent is
                                  authorized to execute
                                  assignment, in format
                                  specified.
415(a)(1); 416; 420(a), (b);     Submit request for       10................  2 suspension                    20
 428(b).                          suspension and                               requests.
                                  required information/
                                  payment no later than
                                  90 days prior to lease
                                  or grant expiration.
417(b).........................  Conduct, and if          100...............  1 study/submission             100
                                  required pay for, site-
                                  specific study to
                                  evaluate cause of harm
                                  or damage; and submit
                                  copies of study and
                                  results, in format
                                  specified.
                                                         -------------------------------------------------------
                                                                       1 study x $950,000 = $950,000
                                                         -------------------------------------------------------
425 thru 428; 652(a); 235(a),    Request lease or grant   6.................  2 renewal requests              12
 (c).                             renewal no later than
                                  180 days before
                                  termination date of
                                  your limited lease or
                                  grant, or no later
                                  than 2 years before
                                  termination date of
                                  operations term of
                                  commercial lease.
                                  Submit required
                                  information.
435; 658(c)(2); Form BOEM-0004.  Submit copies of         1.................  2 relinquishments.               2
                                  application to
                                  relinquish lease or
                                  grant, in format
                                  specified.
                                                         ----------------------------------------
436; 437.......................  Provide information for   Requirement not considered IC under 5               0
                                  reconsideration of                 CFR 1320.3(h)(9).
                                  BOEM decision to
                                  contract or cancel
                                  lease or grant area.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  11 responses......       237 hours
                                                                             -----------------------------------
                                                                                           $950,000
----------------------------------------------------------------------------------------------------------------
                            Subpart E--Payments and Financial Assurance Requirements
----------------------------------------------------------------------------------------------------------------
An * indicates the primary cites for providing bonds or other financial assurance, and the                     0
 burdens include any previous or subsequent references throughout part 585 to furnish, replace,
 or provide additional bonds, securities, or financial assurance (including riders,
 cancellations, replacements). This subpart contains references to other information
 submissions, approvals, requests, applications, plans, etc., the burdens for which are covered
 elsewhere in part 585. In the future BOEM may require electronic filings of certain
 submissions.
--------------------------------                          ---------------------------------------
500 thru 509; 1011.............  Submit payor             Burdens covered by information                       0
                                  information, payments    collections approved for ONRR 30 CFR
                                  and payment              Chapter XII.
                                  information, and
                                  maintain auditable
                                  records according to
                                  ONRR regulations or
                                  guidance.
                                                         ----------------------------------------
506(c)(4)......................  Submit documentation of  10 min............  6 forms...........               1
                                  the gross annual
                                  generation of
                                  electricity produced
                                  by the generating
                                  facility on the lease--
                                  use same form as
                                  authorized by the EIA.
                                  (Burden covered under
                                  DOE/EIA OMB Control
                                  Number 1905-0129 to
                                  gather info and fill
                                  out form. BOEM's
                                  burden is for
                                  submitting a copy).

[[Page 13700]]

 
510; 506(c)(3).................  Submit application and   1.................  1 waiver or rental               1
                                  required information                         reduction.
                                  for waiver or
                                  reduction of rental or
                                  other payment.
* 515; 516; 525(a) thru (f)....  Execute and provide      1.................  6 base-level lease               6
                                  $100,000 minimum lease-                      bonds or other
                                  specific bond or other                       security.
                                  approved security; or
                                  increase bond level if
                                  required.
* 516(a)(2), (3), (b), (c);      Execute and provide      1.................  5 SAP and COP                    5
 517; 525(a) thru (f).            commercial lease                             bonds.
                                  supplemental bonds in
                                  amounts determined by
                                  BOEM.
516(a)(4); 521(c)..............  Execute and provide      1.................  3 decommissioning                3
                                  decommissioning bond                         bonds.
                                  or other financial
                                  assurance; schedule
                                  for providing the
                                  appropriate amount.
517(c)(1)......................  Submit comments on       1.................  3 adjustment                     3
                                  proposed adjustment to                       comments.
                                  bond amounts.
517(c)(2)......................  Request bond reduction   5.................  2 reduction                     10
                                  and submit evidence to                       requests.
                                  justify.
* 520; 521; 525(a) thru (f);     Execute and provide      1.................  1 base-level ROW/                1
 Form BOEM-0005.                  $300,000 minimum                             RUE bond.
                                  limited lease or grant-
                                  specific bond or
                                  increase financial
                                  assurance and required
                                  iniformation.
525(g).........................  Surety notice to lessee  1.................  1 surety notice...               1
                                  or ROW/RUE grant
                                  holder and BOEM within
                                  5 business days after
                                  initiating insolvency
                                  or bankruptcy
                                  proceeding, or
                                  Treasury decertifies
                                  surety.
* 526 Form BOEM-0005...........  In lieu of surety bond,  2.................  1 other security                 2
                                  pledge other types of                        pledge.
                                  securities, including
                                  authority for BOEM to
                                  sell and use proceeds
                                  and submit required
                                  information (1 hour
                                  for form).
526(c).........................  Provide annual           1.................  1 statement.......               1
                                  certified statements
                                  describing the nature
                                  and market value,
                                  including brokerage
                                  firm statements/
                                  reports.
* 527; 531.....................  Demonstrate financial    10................  1.................              10
                                  worth/ability to carry
                                  out present and future
                                  financial obligations,
                                  annual updates, and
                                  related or subsequent
                                  actions/records/
                                  reports, etc.
528............................  Provide third-party      10................  1.................              10
                                  indemnity; financial
                                  information/
                                  statements; additional
                                  bond info; executed
                                  guarantor agreement
                                  and supporting
                                  information/
                                  documentation/
                                  agreements.
528(c)(6); 532(b)..............  Guarantor/Surety         1.................  1 request.........               1
                                  requests BOEM
                                  terminate period of
                                  liability and notifies
                                  lessee or ROW/RUE
                                  grant holder, etc.
* 529..........................  In lieu of surety bond,  2.................  1 decommissioning                2
                                  request authorization                        account.
                                  to establish
                                  decommissioning
                                  account, including
                                  written authorizations
                                  and approvals
                                  associated with
                                  account.
530............................  Notify BOEM promptly of  1.................  1 notice..........               1
                                  lapse in bond or other
                                  security/action filed
                                  alleging lessee,
                                  surety or guarantor et
                                  al is insolvent or
                                  bankrupt.
533(a)(2)(ii), (iii)...........  Provide agreement from   3.................  1 surety agreement               3
                                  surety issuing new
                                  bond to assume all or
                                  portion of outstanding
                                  liabilities.
536(b).........................  Within 10 business days  16................  1 agreement                      8
                                  following BOEM notice,                       demonstration
                                  lessee, grant holder,                        every 2 years.
                                  or surety agrees to
                                  and demonstrates to
                                  BOEM that lease will
                                  be brought into
                                  compliance.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  37 responses......        69 hours
----------------------------------------------------------------------------------------------------------------
                                  Subpart F--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations                0
 Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or
 subsequent references throughout part 585 to submission and approval. This subpart contains
 references to other information submissions, approvals, requests, applications, plans, etc.,
 the burdens for which are covered elsewhere in part 585.
--------------------------------                          ---------------------------------------

[[Page 13701]]

 
** 600(a); 601(a), (b); 605      Within time specified    240...............  6 SAPs............           1,440
 thru 614; 238; 810.              after issuance of a
                                  competitive lease or
                                  grant, or within time
                                  specified after
                                  determination of no
                                  competitive interest,
                                  submit copies of SAP,
                                  including required
                                  information to assist
                                  BOEM to comply with
                                  NEPA/CZMA such as
                                  hazard info, air
                                  quality, SEMS, and all
                                  required information,
                                  certifications,
                                  requests, etc., in
                                  format specified.
** 600(b); 601(c), (d)(1);       If requesting an         1,000.............  3 COPs............           3,000
 606(b); 618; 620 thru 629;       operations term for
 632; 633; 810.                   commercial lease,
                                  within time specified
                                  before the end of site
                                  assessment term,
                                  submit copies of COP,
                                  or FERC license
                                  application, including
                                  required information
                                  to assist BOEM to
                                  comply with NEPA/CZMA
                                  such as hazard info,
                                  air quality, SEMS, and
                                  all required
                                  information, surveys
                                  and/or their results,
                                  reports,
                                  certifications,
                                  project easements,
                                  supporting data and
                                  information, requests,
                                  etc., in format
                                  specified.
** 600(c); 601(a), (b); 640      Within time specified    240...............  1 GAP.............             240
 thru 648; 651; 238; 810.         after issuance of a
                                  competitive lease or
                                  grant, or within time
                                  specified after
                                  determination of no
                                  competitive interest,
                                  submit copies of GAP,
                                  including required
                                  information to assist
                                  BOEM to comply with
                                  NEPA/CZMA such as
                                  hazard info, air
                                  quality, SEMS, and all
                                  required information,
                                  surveys and reports,
                                  certifications,
                                  project easements,
                                  requests, etc., in
                                  format specified.
** 601(d)(2); 622; 628(f); 632;  Submit revised or        50................  1 revised or                    50
 634; 658(c)(3); 907.             modified COPs,                               modified COP.
                                  including project
                                  easements, and all
                                  required additional
                                  information.
 602 \2\.......................  Until BOEM releases      2.................  9 records                       18
                                  financial assurance,                         maintenance/
                                  respondents must                             submissions.
                                  maintain, and provide
                                  to BOEM if requested,
                                  all data and
                                  information related to
                                  compliance with
                                  required terms and
                                  conditions of SAP,
                                  COP, or GAP.
** 613(a), (d), (e); 617.......  Submit revised or        50................  1 revised or                    50
                                  modified SAPs and                            modified SAP.
                                  required additional
                                  information.
612; 647.......................  Submit copy of SAP or    1.................  4 leases..........               4
                                  GAP consistency
                                  certification and
                                  supporting
                                  documentation,
                                  including
                                  noncompetitive leases.
615(a).........................  Notify BOEM in writing   1.................  5 completion                     5
                                  within 30 days of                            construction
                                  completion of                                notices.
                                  construction and
                                  installation
                                  activities under SAP.
615(b).........................  Submit annual report     30................  8 annual reports..             240
                                  summarizing findings
                                  from site assessment
                                  activities.
615(c).........................  Submit annual, or at     40................  8 compliance                   320
                                  other time periods as                        certifications.
                                  BOEM determines, SAP
                                  compliance
                                  certification,
                                  effectiveness
                                  statement,
                                  recommendations,
                                  reports, supporting
                                  documentation, etc.
617(a).........................  Notify BOEM in writing   10................  1 notice before                 10
                                  before conducting any                        activity.
                                  activities not
                                  approved, or provided
                                  for, in SAP; provide
                                  additional information
                                  if requested.
                                                         ----------------------------------------
627(c).........................  Submit oil spill           Burden covered under BSEE 1014-0007                0
                                  response plan as
                                  required by BSEE 30
                                  CFR part 254.
                                                         ----------------------------------------
631............................  Request deviation from   2.................  1 deviation                      2
                                  approved COP schedule.                       request.
633(b).........................  Submit annual, or at     50................  9 compliance                   450
                                  other time periods as                        certifications.
                                  BOEM determines, COP
                                  compliance
                                  certification,
                                  effectiveness
                                  statement,
                                  recommendations,
                                  reports, supporting
                                  documentation, etc.

[[Page 13702]]

 
634(a).........................  Notify BOEM in writing   10................  1 notice before                 10
                                  before conducting any                        activity.
                                  activities not
                                  approved or provided
                                  for in COP, and
                                  provide additional
                                  information if
                                  requested.
635............................  Notify BOEM any time     1.................  1 termination                    1
                                  commercial operations                        notice.
                                  cease without an
                                  approved suspension.
636(a).........................  Notify BOEM in writing   1.................  3 commence notices               3
                                  no later than 30 days
                                  after commencing
                                  activities associated
                                  with placement of
                                  facilities on lease
                                  area.
636(b).........................  Notify BOEM in writing   1.................  3 completion                     3
                                  no later than 30 days                        notices.
                                  after completion of
                                  construction and
                                  installation
                                  activities.
636(c).........................  Notify BOEM in writing   1.................  3 initial ops                    3
                                  at least 7 days before                       notices.
                                  commencing commercial
                                  operations.
** 642(b); 648; 655; 658(c)(3).  Submit revised or        50................  1 revised or                    50
                                  modified GAPs and                            modified GAP.
                                  required additional
                                  information.
651............................  Before beginning         30................  5 surveys/reports.             150
                                  construction of OCS
                                  facility described in
                                  GAP, complete survey
                                  activities identified
                                  in GAP and submit
                                  initial findings.
                                  [This only includes
                                  the time involved in
                                  submitting the
                                  findings; it does not
                                  include the survey
                                  time as these surveys
                                  would be conducted as
                                  good business
                                  practice.]
653(a).........................  Notify BOEM in writing   1.................  5 completion                     5
                                  within 30 days of                            notices.
                                  completing
                                  installation
                                  activities under the
                                  GAP.
653(b).........................  Submit annual report     30................  8 annual reports..             240
                                  summarizing findings
                                  from activities
                                  conducted under
                                  approved GAP.
653(c).........................  Submit annual, or at     40................  8 compliance                   320
                                  other time periods as                        certifications.
                                  BOEM determines, GAP
                                  compliance
                                  certification,
                                  recommendations,
                                  reports, etc.
655(a).........................  Notify BOEM in writing   10................  1 notice before                 10
                                  before conducting any                        activity.
                                  activities not
                                  approved or provided
                                  for in GAP, and
                                  provide additional
                                  information if
                                  requested.
656............................  Notify BOEM any time     1.................  1 termination                    1
                                  approved GAP                                 notice.
                                  activities cease
                                  without an approved
                                  suspension.
658(c)(1)......................  If after construction,   3.................  1 deviation notice/              3
                                  cable or pipeline                            BOEM evidence.
                                  deviate from approved
                                  COP or GAP, notify
                                  affected lease
                                  operators and ROW/RUE
                                  grant holders of
                                  deviation and provide
                                  BOEM evidence of such
                                  notices.
659............................  Determine appropriate    70................  10 air quality                 700
                                  air quality modeling                         modeling reports/
                                  protocol, conduct air                        information.
                                  quality modeling, and
                                  submit 3 copies of air
                                  quality modeling
                                  report and 3 sets of
                                  digital files as
                                  supporting information
                                  to plans.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  108 responses.....     7,328 hours
----------------------------------------------------------------------------------------------------------------
                            Subpart G--Facility Design, Fabrication, and Installation
----------------------------------------------------------------------------------------------------------------
Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens                0
 include any previous or subsequent references throughout part 585 to submitting and obtaining
 approval. This subpart contains references to other information submissions, approvals,
 requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------                          ---------------------------------------
***700(a)(1), (b), (c); 701....  Submit Facility Design   200...............  3 Facility Design              600
                                  Report, including                            Reports.
                                  copies of the cover
                                  letter, certification
                                  statement, and all
                                  required information
                                  (1-3 paper or
                                  electronic copies as
                                  specified).
***700(a)(2); (b), (c); 702....  Submit copies of a       160...............  3 Fabrication &                480
                                  Fabrication and                              Installation
                                  Installation Report,                         Reports.
                                  certification
                                  statement and all
                                  required information,
                                  in format specified.

[[Page 13703]]

 
705(a)(3); 707; 712............  Certified Verification   100...............  3 CVA design                   300
                                  Agent (CVA) conducts                         interim reports.
                                  independent assessment
                                  of the facility design
                                  and submits copies of
                                  all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
                                                          100...............  3 CVA final                    300
                                                                               reports.
705(a)(3); 708; 709; 710; 712..  CVA conducts             100...............  3 CVA interim                  300
                                  independent                                  reports.
                                  assessments/
                                  inspections on the
                                  fabrication and
                                  installation
                                  activities, informs
                                  lessee or grant holder
                                  if procedures are
                                  changed or design
                                  specifications are
                                  modified; and submits
                                  copies of all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
                                                          100...............  3 CVA final                    300
                                                                               reports.
703***; 705(a)(3); 712; 815....  CVA/project engineer     20................  1 interim report..              20
                                  monitors major project
                                  modifications and
                                  repairs and submits
                                  copies of all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
                                                          15................  1 final report....              15
705(c).........................  Request waiver of CVA    40................  1 waiver..........              40
                                  requirement in
                                  writing; lessee must
                                  demonstrate standard
                                  design and best
                                  practices.
706............................  Submit for approval      16................  13 new CVA                     208
                                  with SAP, COP, or GAP,                       nominations.
                                  initial nominations
                                  for a CVA or new
                                  replacement CVA
                                  nomination, and
                                  required information.
708(b)(2)......................  Lessee or grant holder   1.................  1 notice..........               1
                                  notify BOEM if
                                  modifications
                                  identified by CVA/
                                  project engineer are
                                  accepted.
709(a)(14); 710(a)(2), (e) \2\.  Make fabrication         1.................  3 records                        3
                                  quality control,                             retention.
                                  installation towing,
                                  and other records
                                  available to CVA/
                                  project engineer for
                                  review (retention
                                  required by Sec.
                                  585.714).
713............................  Notify BOEM within 10    1.................  2 commence notices               2
                                  business days after
                                  commencing commercial
                                  operations.
714 \2\........................  Until BOEM releases      100...............  3 lessees.........             300
                                  financial assurance,
                                  compile, retain, and
                                  make available to BOEM
                                  and/or CVA the as-
                                  built drawings, design
                                  assumptions/analyses,
                                  summary of fabrication
                                  and installation
                                  examination records,
                                  inspection results,
                                  and records of repairs
                                  not covered in
                                  inspection report.
                                  Record original and
                                  relevant material test
                                  results of all primary
                                  structural materials;
                                  retain records during
                                  all stages of
                                  construction.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  43 responses......     2,869 hours
----------------------------------------------------------------------------------------------------------------
 Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
                                           Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
801(c), (d)....................  Notify BOEM if           1.................  2 notices.........               2
                                  endangered or
                                  threatened species, or
                                  their designated
                                  critical habitat, may
                                  be in the vicinity of
                                  the lease or grant or
                                  may be affected by
                                  lease or grant
                                  activities.
801(e), (f)....................  Submit information to    6.................  2 ESA/MMPA                      12
                                  ensure proposed                              submissions.
                                  activities will be
                                  conducted in
                                  compliance with the
                                  Endangered Species Act
                                  (ESA) and Marine
                                  Mammal Protection Act
                                  (MMPA); including
                                  agreements and
                                  mitigating measures
                                  designed to avoid or
                                  minimize adverse
                                  effects and incidental
                                  take of endangered
                                  species or critical
                                  habitat.

[[Page 13704]]

 
802; 902(e)....................  Notify BOEM of           3.................  1 archaeological                 3
                                  archaeological                               notice.
                                  resource within 72
                                  hours of discovery.
802(b), (c)....................  If requested, conduct    10................  1 archaeological                10
                                  further archaeological                       report.
                                  investigations and
                                  submit report/
                                  information.
802(d).........................  If applicable, submit    .5................  1 payment.........              .5
                                  payment for BOEM costs
                                  in carrying out
                                  National Historic
                                  Preservation Act
                                  responsibilities.
803............................  If required, conduct     15................  2 survey/report...              30
                                  additional surveys to
                                  define boundaries and
                                  avoidance distances
                                  and submit report.
810***; 614; 627; 632(b); 651..  Submit safety            35................  10 safety                      350
                                  management system                            management
                                  description with the                         systems.
                                  SAP, COP, or GAP.
813(b)(1)......................  Report within 24 hours   .5................  3 equipment                    1.5
                                  when any required                            reports.
                                  equipment taken out of
                                  service for more than
                                  12 hours; provide
                                  written confirmation
                                  if reported orally.
                                                          1.................  1 written                        1
                                                                               confirmation.
813(b)(3)......................  Notify BOEM when         .5................  3 return to                    1.5
                                  equipment returned to                        service notices.
                                  service; provide
                                  written confirmation
                                  if reported orally.
815(c).........................  When required, analyze   1.5...............  1 analysis report.             1.5
                                  cable, P/L, or
                                  facility damage or
                                  failures to determine
                                  cause and as soon as
                                  available submit
                                  comprehensive written
                                  report.
816............................  Submit plan of           2.................  1 corrective                     2
                                  corrective action                            action plan and
                                  report on observed                           report.
                                  detrimental effects on
                                  cable, P/L, or
                                  facility within 30
                                  days of discovery;
                                  take remedial action
                                  and submit report of
                                  remedial action within
                                  30 days after
                                  completion.
822(a)(2)(iii), (b)............  Until BOEM releases      1.................  4 records                        4
                                  financial assurance,                         retention.
                                  maintain records of
                                  design, construction,
                                  operation,
                                  maintenance, repairs,
                                  and investigation on
                                  or related to lease or
                                  ROW/RUE area; make
                                  available to BOEM for
                                  inspection.
823............................  Request reimbursement    2.................  1 reimbursement                  2
                                  within 90 days for                           request.
                                  food, quarters, and
                                  transportation
                                  provided to BOEM reps
                                  during inspection.
824(a) \2\.....................  Develop annual self      24................  4 self assessment               96
                                  inspection plan                              plans.
                                  covering all
                                  facilities; retain
                                  with records, and make
                                  available to BOEM upon
                                  request.
824(b).........................  Conduct annual self      36................  4 annual reports..             144
                                  inspection and submit
                                  report by November 1.
825............................  Based on API RP 2A-WSD,  60................  4 assessments and              240
                                  perform assessment of                        mitigation
                                  structures, initiate                         actions.
                                  mitigation actions for
                                  structures that do not
                                  pass assessment
                                  process, retain
                                  information, and make
                                  available to BOEM upon
                                  request.
830(a), (c); 831 thru 833......  Immediately report       Oral..............  6 incidents.......               3
                                  incidents to BOEM via   .5................
                                  oral communications,
                                  submit written follow-
                                  up report within 15
                                  business days after
                                  the incident, and
                                  submit any required
                                  additional information.
                                                          Written...........  1 incident........               4
                                                          4.................
                                                         ----------------------------------------
830(d).........................  Report oil spills as      Burden covered under BSEE 1014-0007.                0
                                  required by BSEE 30
                                  CFR 254.
                                                         -------------------------------------------------------
    Subtotal...................  .......................  ..................  52 responses......       908 hours
----------------------------------------------------------------------------------------------------------------
                                           Subpart I--Decommissioning
----------------------------------------------------------------------------------------------------------------
Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any
 previous or subsequent references throughout part 585 to submitting and obtaining approval. This subpart
 contains references to other information submissions, approvals, requests, applications, plans, etc., the
 burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------

[[Page 13705]]

 
**** 902; 905, 906; 907;         Submit for approval, in  20................  1 decommissioning               20
 908(c); 909.                     format specified,                            application.
                                  copies of the SAP,
                                  COP, or GAP
                                  decommissioning
                                  application and site
                                  clearance plan at
                                  least 2 years before
                                  decommissioning
                                  activities begin, 90
                                  days after completion
                                  of activities, or 90
                                  days after
                                  cancellation,
                                  relinquishment, or
                                  other termination of
                                  lease or grant.
                                  Include documentation
                                  of coordination
                                  efforts w/States/CZMA
                                  agencies, local or
                                  tribal governments,
                                  requests that certain
                                  facilities remain in
                                  place for other
                                  activities, be
                                  converted to an
                                  artificial reef, or be
                                  toppled in place.
                                  Submit additional
                                  information/evidence
                                  requested or modify
                                  and resubmit
                                  application.
902(d); 908;...................  Notify BOEM at least 60  1.................  1 decommissioning                1
                                  days before commencing                       notice.
                                  decommissioning
                                  activities.
910............................  Within 60 days after     1.................  1 removal                        1
                                  removing a facility,                         verification.
                                  verify to BOEM that
                                  site is cleared.
912............................  Within 60 days after     8.................  1 removal report..               8
                                  removing a facility,
                                  cable, or pipeline,
                                  submit a written
                                  report.
----------------------------------------------------------------------------------------------------------------
 BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a
                                                 minimal burden.
----------------------------------------------------------------------------------------------------------------
    Subtotal...................  .......................  ..................  4 responses.......        30 hours
----------------------------------------------------------------------------------------------------------------
             Subpart J--RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities
----------------------------------------------------------------------------------------------------------------
1004, 1005, 1006...............  Contact owner of         1.................  1 request for RUE                1
                                  existing facility and/                       to use existing
                                  or lessee of the area                        facility.
                                  to reach preliminary
                                  agreement to use
                                  facility and obtain
                                  concurring signatures;
                                  submit request to BOEM
                                  for an alternative use
                                  RUE, including all
                                  required information/
                                  modifications.
1007(a), (b), (c)..............  Submit indication of     4.................  1 response........               4
                                  competitive interest
                                  in response to Federal
                                  Register notice.
1007(c)........................  Submit description of    5.................  1 submission......               5
                                  proposed activities
                                  and required
                                  information in
                                  response to Federal
                                  Register notice of
                                  competitive offering.
1007(f)........................  Lessee or owner of       1.................  1 decision........               1
                                  facility submits
                                  decision to accept or
                                  reject proposals
                                  deemed acceptable by
                                  BOEM.
1010(c)........................  Request renewal of       6.................  1 renewal request.               6
                                  Alternate Use RUE.
1012; 1016(b)..................  Provide financial        1.................  1 bond or other                  1
                                  assurance as BOEM                            security.
                                  determines in
                                  approving RUE for an
                                  existing facility,
                                  including additional
                                  security if required.
1013...........................  Submit request for       1.................  1 RUE assignment                 1
                                  assignment of an                             request.
                                  alternative use RUE
                                  for an existing
                                  facility, including
                                  all required
                                  information.
1015...........................  Request relinquishment   1.................  1 RUE relinquish..               1
                                  of RUE for an existing
                                  facility.
                                                                             -----------------------------------
    Subtotal...................  .......................  ..................  8 responses.......        20 hours
                                                                             -----------------------------------
                                                                              409 Responses.....    30,902 Hours
                                                                             -----------------------------------
        Total Burden...........  .......................  ..................   $3,816,000 Non-Hour Cost Burdens
----------------------------------------------------------------------------------------------------------------
\1\ In the future, BOEM may require electronic filing of certain submissions.
\2\ Retention of these records is usual and customary business practice; the burden is primarily to make them
  available to BOEM and CVAs.

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: The 
estimated non-hour cost burdens total $3,816,000. The non-hour cost 
burdens consist of service fees for BOEM document/study preparation, 
costs for paying a contractor instead of BOEM, and costs for a site-
specific study and report to evaluate the cause of harm to natural 
resources.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.

[[Page 13706]]

    Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et 
seq.,) requires each agency ``* * * to provide notice * * * and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information * * *'' Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    To comply with the public consultation process, on October 10, 
2012, BOEM published a Federal Register notice (77 FR 61633) announcing 
that we would submit this ICR to OMB for approval. This notice provided 
the required 60-day comment period. We received one comment. The Marine 
Mammal Commission states that BOEM's reporting requirements provide a 
systematic and uniform method to track compliance with regulations, 
including those that protect marine resources. Therefore, the 
Commission supports BOEM's request to OMB to approve the renewal of 
this collection.
    Public Availability of Comments: Before including your address, 
phone number, email address, or other personal identifying information 
in your comment, you should be aware that your entire comment--
including your personal identifying information--may be made publicly 
available at any time. While you can ask us in your comment to withhold 
your personal identifying information from public review, we cannot 
guarantee that we will be able to do so.

     Dated:February 7, 2013.
Deanna Meyer-Pietruszka,
Chief, Office of Policy, Regulations, and Analysis.
[FR Doc. 2013-04626 Filed 2-27-13; 8:45 am]
BILLING CODE 4510-MR-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.