Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida, 13081-13082 [2013-04342]
Download as PDF
Federal Register / Vol. 78, No. 38 / Tuesday, February 26, 2013 / Notices
of those alternatives. These analyses
underwent review within the BLM and
among the cooperating agencies,
resulting in the Draft IAP/EIS released
on March 30, 2012. The comment
period was originally scheduled to end
on June 1, 2012, but in response to
public requests, the BLM extended the
comment period to June 15, 2012. The
public and agencies commented on the
Draft IAP/EIS. Based on these comments
and additional analysis, the BLM
developed the preferred alternative and
revised the Draft to issue a Final IAP/
EIS on December 19, 2012.
The ROD provides opportunities for
oil and gas leasing and development as
required by the Naval Petroleum
Reserves Production Act, as amended,
and for application for onshore
infrastructure in support of offshore
development, while protecting surface
values, most notably subsistence
resources and access and a wide range
of important wildlife and wildlife
habitat. This decision reflects the
Preferred Alternative B–2 in the NPR–A
Final IAP/EIS issued in December 2012,
with minor modifications to clarify
intent, provide greater assurance of the
consistency of the plan with onshore
infrastructure to support offshore
development, and to establish an NPR–
A working group as a means for future
ongoing dialogue regarding BLM
management of the NPR–A.
Authority: 40 CFR 1506.6.
Ted A. Murphy,
Acting State Director.
[FR Doc. 2013–04406 Filed 2–25–13; 8:45 am]
BILLING CODE 4310–JA–P
DEPARTMENT OF THE INTERIOR
National Park Service
[NPS–SERO–EVER–12017; PPSESEROC3,
PMP00UP05.YP0000]
Draft Environmental Impact Statement
for General Management Plan,
Everglades National Park, Florida
National Park Service, Interior.
Notice of Availability.
AGENCY:
tkelley on DSK3SPTVN1PROD with NOTICES
ACTION:
SUMMARY: Pursuant to Section 102(a)(c)
of the National Environmental Policy
Act of 1969, 42 U.S.C. 4332(2)(C), the
National Park Service (NPS) announces
the availability of the Draft
Environmental Impact Statement (DEIS)
for the General Management Plan (GMP)
and East Everglades Wilderness Study
(EEWS) for Everglades National Park
(park). After it is finalized, the GMP/
EEWS will guide the management of the
park over the next 20+ years.
VerDate Mar<15>2010
16:35 Feb 25, 2013
Jkt 229001
The last comprehensive planning
effort for the Park was completed in
1979. Patterns and types of visitor use
have changed, the Comprehensive
Everglades Restoration Plan was
approved, and in 1989 the East
Everglades Addition of approximately
109,600 acres was added to the park to
protect and restore the Northeast Shark
River Slough. Recent studies have
enhanced the understanding of
resources, resource threats, and visitor
use in the Park. The GMP will provide
updated management direction for the
entire park. The EEWS provides a forum
for evaluating lands within the East
Everglades Addition for possible
recommendation to Congress for
inclusion in the National Wilderness
Preservation System.
The NPS will accept comments
from the public on the DEIS for 60 days
from the date the Environmental
Protection Agency publishes the Notice
of Availability in the Federal Register.
The date, time, and location of public
meetings will be announced through the
NPS Planning, Environment, and Public
Comment (PEPC) Web site https://
parkplanning.nps.gov, the Everglades
National Park Web site, and in media
outlets in winter 2013.
DATES:
The DEIS will be available
for public review and comment online
at https://parkplanning.nps.gov. CDs and
a limited number of printed copies will
be made available at Everglades
National Park headquarters and various
local libraries. You may request a copy
by contacting Everglades National Park,
40001 State Road 93363, Homestead, FL
33034; 305–242–7700.
If you wish to comment, you may do
so by any one of several methods. The
preferred method is commenting via the
Internet at https://parkplanning.nps.gov.
An electronic public comment form is
provided through this Web site. You
may also mail comments to
Superintendent, Everglades National
Park, 40001 State Road 9336,
Homestead, FL 33034–6733. Comments
may also be hand-delivered to the
Everglades National Park address
provided above. Before including your
address, phone number, email address,
or other personal identifying
information in your comment, you
should be aware that your entire
comment—including your personal
identifying information—may be made
publicly available at any time. While
you can ask us in your comment to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
ADDRESSES:
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
13081
Public
scoping for the GMP was initiated in
2003. The EEWS was added to the scope
of the project in 2006. Public meetings,
five newsletters, and internet updates
have kept the public informed and
involved throughout the planning
process. The GMP EEWS will provide a
framework for management, use, and
development of the Everglades National
Park for the next 20 or more years. The
DEIS presents and analyzes four
alternative ways of managing the Park—
alternative 1 (no action/continue current
management); the NPS preferred
alternative; alternative 2; and alternative
4. (Alternative 3 was dismissed from
detailed analysis).
Alternative 1 (no action/continue
current management) provides a
baseline for evaluating changes and
impacts of the three action alternatives.
No wilderness is proposed for the East
Everglades Addition in alternative 1.
The NPS preferred alternative would
support restoration of natural systems
and enhanced protection of cultural
resources, while providing improved
opportunities for quality visitor
experiences. It proposes about 80,100
acres for designation as wilderness
within the East Everglades Addition, as
well as about 9,900 acres for designation
as potential wilderness.
Alternative 2 would strive to maintain
and enhance visitor opportunities and
protect natural systems while preserving
many traditional routes and ways of
visitor access. It proposes 39,500 acres
for designation as wilderness within the
East Everglades Addition. No potential
wilderness is proposed under this
alternative.
As noted above, alternative 3 was
dismissed from detailed analysis.
Alternative 4 would provide a high
level of support for protecting natural
systems while improving opportunities
for certain types of visitor activities.
Alternative 4 would eliminate
commercial airboat tours within the
park. It proposes 42,700 acres for
designation as wilderness within the
East Everglades Addition and 59,400
acres for designation as potential
wilderness.
All four alternatives would enhance
Flamingo concessions services and
facilities. The NPS preferred alternative,
alternative 2, and alternative 4 would
build the ‘‘Marjory Stoneman Douglas
Visitor Center’’ at Everglades City, and
each of these three alternatives would
provide new and different visitor
opportunities. The four alternatives are
described in detail in chapter 2 of the
DEIS and summarized in table 5 of that
chapter. The key aspects of the four
alternatives and the impacts of
SUPPLEMENTARY INFORMATION:
E:\FR\FM\26FEN1.SGM
26FEN1
13082
Federal Register / Vol. 78, No. 38 / Tuesday, February 26, 2013 / Notices
implementing them are described in the
plan’s summary, detailed in chapter 5,
and summarized in table 6 (chapter 2).
FOR FURTHER INFORMATION CONTACT:
Everglades National Park Supervisory
Park Planner Fred Herling at the address
and telephone number shown above, or
via email at Fred_Herling@nps.gov.
The responsible official for this DEIS/
GMP is the Regional Director, NPS
Southeast Region, 100 Alabama Street
SW., 1924 Building, Atlanta, Georgia
30303.
Dated: February 14, 2013.
Gordon Wissinger,
Acting Regional Director, Southeast Region.
[FR Doc. 2013–04342 Filed 2–25–13; 8:45 am]
BILLING CODE 4310–JD–P
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Draft Environmental Impact Report/
Environmental Impact Statement/
Environmental Impact Statement,
Upper Truckee River and Marsh
Restoration Project, El Dorado County,
California
Bureau of Reclamation,
Interior.
ACTION: Notice of availability and notice
of public hearings.
tkelley on DSK3SPTVN1PROD with NOTICES
AGENCY:
SUMMARY: The Bureau of Reclamation
has made available for public review
and comment the draft Environmental
Impact Report/Environmental Impact
Statement/Environmental Impact
Statement (EIR/EIS/EIS) for the Upper
Truckee River Restoration and Marsh
Restoration Project (Project). The
California Tahoe Conservancy and the
Tahoe Regional Planning Agency, the
other lead agencies for the Project, made
the EIR/EIS/EIS available to the public
on February 8, 2013.
DATES: Submit written comments on the
draft EIR/EIS/EIS on or before April 29,
2013.
Two public hearings will be held at
9:30 a.m. on Wednesday, March 13,
2013 and Wednesday, March 27, 2013
in Stateline, Nevada, to receive oral and
written comments regarding the
Project’s environmental effects.
ADDRESSES: Send written comments on
the draft EIR/EIS/EIS to Scott Carroll,
Environmental Planner, State of
California, California Tahoe
Conservancy, 1061 Third Street, South
Lake Tahoe, CA 96150; by fax to 530–
542–5567; or by email to
scarroll@tahoe.ca.gov. Emailed
comments are preferred. See
SUPPLEMENTARY INFORMATION section for
VerDate Mar<15>2010
16:35 Feb 25, 2013
Jkt 229001
directions on how to prepare email
comments for the Project.
The public hearings will be held at
128 Market Street, Stateline, Nevada.
The draft EIR/EIS/EIS is accessible at
the following Web sites: https://
tahoe.ca.gov/upper-truckee-marsh69.aspx. https://www.usbr.gov/mp/nepa/
nepa_projdetails.cfm?Project_ID=2937.
Compact disks are also available upon
request from the California Tahoe
Conservancy at scarroll@tahoe.ca.gov.
See SUPPLEMENTARY INFORMATION
Section for location where copies of the
draft EIR/EIS/EIS are available for
public review.
FOR FURTHER INFORMATION CONTACT:
Scott Carroll, California Tahoe
Conservancy, at 530–543–6062; or
Adam Lewandowski, Tahoe Regional
Planning Agency; and Myrnie Mayville,
Bureau of Reclamation, both at 775–
588–4547.
SUPPLEMENTARY INFORMATION: The
purpose of the Project is to restore
natural geomorphic processes and
ecological functions in this lowest reach
of the Upper Truckee River and the
surrounding marsh to improve
ecological values of the restoration area
and help reduce the river’s discharge of
nutrients and sediment that diminish
Lake Tahoe’s clarity.
The approximately 592-acre study
area is along the most downstream
reaches of the Upper Truckee River and
Trout Creek, including their mouths at
Lake Tahoe in the City of South Lake
Tahoe, within El Dorado County,
California. It includes 1.8-miles of the
Upper Truckee River as well as the
marsh and meadows surrounding the
lowest reaches of Trout Creek. The
majority of the study area is owned by
the California Tahoe Conservancy
though the study area does include
small areas owned by other public
agencies and private landowners.
Four action alternatives (Alternatives
1–4), and the No-Project/No-Action
Alternative (Alternative 5), are analyzed
in the draft EIR/EIS/EIS. Alternative 1
would involve restoration of the Upper
Truckee River by increasing channel
length and decreasing channel capacity.
Alternative 2 would involve river
restoration by directly raising the
streambed elevation, increasing the
channel length, and decreasing channel
capacity. A key element of this
restoration would be the excavation of
a new river channel that has less
capacity than the existing channel.
Alternative 3 would promote the
development, through natural processes,
of a new main channel and/or
distributary channels in the central
portion of the study area. A ‘‘pilot’’
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
channel would be constructed from the
existing river channel to historical
channels in the center of the study area,
but no construction would occur in the
central or northern portions of the study
area. Rather, natural processes would be
allowed to dictate the flow path(s), bed
and bank elevations, and capacities of
the channel(s) through the central and
northern portions of the study area.
Alternative 4 would restore the river
channel and its connection to the
floodplain by lowering bank heights by
excavating an inset floodplain along
much of the river channel, and by
localized cut and fill to create meanders
in the existing straightened reach.
Alternative 5 would not provide any
actions to restore the river channel and
its connection to the floodplain in the
study area. This alternative would
allow, but not facilitate the long-term,
passive recovery of the river system via
natural processes. This alternative
represents a projection of reasonably
foreseeable future conditions that could
occur if no project actions were
implemented.
Significant or Adverse Environmental
Effects Anticipated
Alternative 1 would involve
restoration of the Upper Truckee River
by increasing channel length and
decreasing channel capacity.
Implementation of Alternative 1 would
result in short-term project and
cumulative construction impacts to
sensitive communities (jurisdictional
wetlands, riparian vegetation, and
Stream Environment Zone); disruption
of wildlife habitat use and loss of
wildlife; and potential risk of surface
water degradation during construction
and the interim adjustment period
thereafter.
Implementing Alternative 1 would
provide the maximum recreation
elements, but in turn would result in
additional significant and unavoidable
project-related impacts including
damage to or mortality of special-status
plants resulting from recreational
activities; conflicts with regional
conservation strategies for Tahoe yellow
cress; operation and expansion of
recreation facilities having an adverse
physical effect on the environment; and
degradation of the scenic quality of
shoreline and mapped scenic resources
related to the Upper Truckee River
bridge.
Implementing Alternative 2 would
involve river restoration by directly
raising the streambed elevation,
increasing the channel length, and
decreasing channel capacity by
excavation of a new river channel that
has less capacity than the existing
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 78, Number 38 (Tuesday, February 26, 2013)]
[Notices]
[Pages 13081-13082]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-04342]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
National Park Service
[NPS-SERO-EVER-12017; PPSESEROC3, PMP00UP05.YP0000]
Draft Environmental Impact Statement for General Management Plan,
Everglades National Park, Florida
AGENCY: National Park Service, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: Pursuant to Section 102(a)(c) of the National Environmental
Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service
(NPS) announces the availability of the Draft Environmental Impact
Statement (DEIS) for the General Management Plan (GMP) and East
Everglades Wilderness Study (EEWS) for Everglades National Park (park).
After it is finalized, the GMP/EEWS will guide the management of the
park over the next 20+ years.
The last comprehensive planning effort for the Park was completed
in 1979. Patterns and types of visitor use have changed, the
Comprehensive Everglades Restoration Plan was approved, and in 1989 the
East Everglades Addition of approximately 109,600 acres was added to
the park to protect and restore the Northeast Shark River Slough.
Recent studies have enhanced the understanding of resources, resource
threats, and visitor use in the Park. The GMP will provide updated
management direction for the entire park. The EEWS provides a forum for
evaluating lands within the East Everglades Addition for possible
recommendation to Congress for inclusion in the National Wilderness
Preservation System.
DATES: The NPS will accept comments from the public on the DEIS for 60
days from the date the Environmental Protection Agency publishes the
Notice of Availability in the Federal Register. The date, time, and
location of public meetings will be announced through the NPS Planning,
Environment, and Public Comment (PEPC) Web site https://parkplanning.nps.gov, the Everglades National Park Web site, and in
media outlets in winter 2013.
ADDRESSES: The DEIS will be available for public review and comment
online at https://parkplanning.nps.gov. CDs and a limited number of
printed copies will be made available at Everglades National Park
headquarters and various local libraries. You may request a copy by
contacting Everglades National Park, 40001 State Road 93363, Homestead,
FL 33034; 305-242-7700.
If you wish to comment, you may do so by any one of several
methods. The preferred method is commenting via the Internet at https://parkplanning.nps.gov. An electronic public comment form is provided
through this Web site. You may also mail comments to Superintendent,
Everglades National Park, 40001 State Road 9336, Homestead, FL 33034-
6733. Comments may also be hand-delivered to the Everglades National
Park address provided above. Before including your address, phone
number, email address, or other personal identifying information in
your comment, you should be aware that your entire comment--including
your personal identifying information--may be made publicly available
at any time. While you can ask us in your comment to withhold your
personal identifying information from public review, we cannot
guarantee that we will be able to do so.
SUPPLEMENTARY INFORMATION: Public scoping for the GMP was initiated in
2003. The EEWS was added to the scope of the project in 2006. Public
meetings, five newsletters, and internet updates have kept the public
informed and involved throughout the planning process. The GMP EEWS
will provide a framework for management, use, and development of the
Everglades National Park for the next 20 or more years. The DEIS
presents and analyzes four alternative ways of managing the Park--
alternative 1 (no action/continue current management); the NPS
preferred alternative; alternative 2; and alternative 4. (Alternative 3
was dismissed from detailed analysis).
Alternative 1 (no action/continue current management) provides a
baseline for evaluating changes and impacts of the three action
alternatives. No wilderness is proposed for the East Everglades
Addition in alternative 1.
The NPS preferred alternative would support restoration of natural
systems and enhanced protection of cultural resources, while providing
improved opportunities for quality visitor experiences. It proposes
about 80,100 acres for designation as wilderness within the East
Everglades Addition, as well as about 9,900 acres for designation as
potential wilderness.
Alternative 2 would strive to maintain and enhance visitor
opportunities and protect natural systems while preserving many
traditional routes and ways of visitor access. It proposes 39,500 acres
for designation as wilderness within the East Everglades Addition. No
potential wilderness is proposed under this alternative.
As noted above, alternative 3 was dismissed from detailed analysis.
Alternative 4 would provide a high level of support for protecting
natural systems while improving opportunities for certain types of
visitor activities. Alternative 4 would eliminate commercial airboat
tours within the park. It proposes 42,700 acres for designation as
wilderness within the East Everglades Addition and 59,400 acres for
designation as potential wilderness.
All four alternatives would enhance Flamingo concessions services
and facilities. The NPS preferred alternative, alternative 2, and
alternative 4 would build the ``Marjory Stoneman Douglas Visitor
Center'' at Everglades City, and each of these three alternatives would
provide new and different visitor opportunities. The four alternatives
are described in detail in chapter 2 of the DEIS and summarized in
table 5 of that chapter. The key aspects of the four alternatives and
the impacts of
[[Page 13082]]
implementing them are described in the plan's summary, detailed in
chapter 5, and summarized in table 6 (chapter 2).
FOR FURTHER INFORMATION CONTACT: Everglades National Park Supervisory
Park Planner Fred Herling at the address and telephone number shown
above, or via email at Fred_Herling@nps.gov.
The responsible official for this DEIS/GMP is the Regional
Director, NPS Southeast Region, 100 Alabama Street SW., 1924 Building,
Atlanta, Georgia 30303.
Dated: February 14, 2013.
Gordon Wissinger,
Acting Regional Director, Southeast Region.
[FR Doc. 2013-04342 Filed 2-25-13; 8:45 am]
BILLING CODE 4310-JD-P