Gulf Crossing Pipeline Company LLC; Notice of Application, 12303-12304 [2013-04081]

Download as PDF sroberts on DSK5SPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 36 / Friday, February 22, 2013 / Notices Open Portion of Meeting: During this open meeting, PCAST is tentatively scheduled to hear from speakers who will provide information on the National Math and Science Initiative, graduate education, and an update on the PCAST energy and climate change letter report. Additional information and the agenda, including any changes that arise, will be posted at the PCAST Web site at: https://whitehouse.gov/ostp/ pcast. Closed Portion of the Meeting: PCAST may hold a closed meeting of approximately one hour with the President on March 15, 2013, which must take place in the White House for the President’s scheduling convenience and to maintain Secret Service protection. This meeting will be closed to the public because such portion of the meeting is likely to disclose matters that are to be kept secret in the interest of national defense or foreign policy under 5 U.S.C. 552b(c)(1). Public Comments: It is the policy of the PCAST to accept written public comments of any length, and to accommodate oral public comments whenever possible. The PCAST expects that public statements presented at its meetings will not be repetitive of previously submitted oral or written statements. The public comment period for this meeting will take place on March 15, 2013, at a time specified in the meeting agenda posted on the PCAST Web site at https://whitehouse.gov/ostp/pcast. This public comment period is designed only for substantive commentary on PCAST’s work, not for business marketing purposes. Oral Comments: To be considered for the public speaker list at the meeting, interested parties should register to speak at: https://whitehouse.gov/ostp/ pcast, no later than 12:00 p.m. (EST) on March 8, 2013. Phone or email reservations will not be accepted. To accommodate as many speakers as possible, the time for public comments will be limited to two (2) minutes per person, with a total public comment period of 30 minutes. If more speakers register than there is space available on the agenda, PCAST will randomly select speakers from among those who applied. Those not selected to present oral comments may always file written comments with the committee. Speakers are requested to bring at least 25 copies of their oral comments for distribution to the PCAST members. Written Comments: Although written comments are accepted continuously, written comments should be submitted to PCAST no later than 12:00 p.m. (EST) on March 8, 2013, so that the comments VerDate Mar<15>2010 16:18 Feb 21, 2013 Jkt 229001 may be made available to the PCAST members prior to this meeting for their consideration. Information regarding how to submit comments and documents to PCAST is available at https://whitehouse.gov/ostp/pcast in the section entitled ‘‘Connect with PCAST.’’ Please note that because PCAST operates under the provisions of FACA, all public comments and/or presentations will be treated as public documents and will be made available for public inspection, including being posted on the PCAST Web site. Meeting Accommodations: Individuals requiring special accommodation to access this public meeting should contact Dr. Amber Hartman Scholz at least ten business days prior to the meeting so that appropriate arrangements can be made. Issued in Washington, DC, on February 15, 2013. LaTanya R. Butler, Deputy Committee Management Officer. [FR Doc. 2013–04108 Filed 2–21–13; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–64–000] Gulf Crossing Pipeline Company LLC; Notice of Application On February 1, 2013, Gulf Crossing Pipeline Company (Gulf Crossing) filed with the Federal Energy Regulatory Commission (Commission) an application under section 7 of the Natural Gas Act and Commission regulations for authorization to construct and operate a new 16.5 mile, 16-inch diameter pipeline lateral and appurtenant auxiliary facilities. The pipeline would extend from Gulf Crossing’s Sherman Compressor Station, near Sherman, Texas to Panda Sherman Power, LLC’s new 758 megawatt gasfired power plant in Grayson County, Texas, as more fully described in the Application. Questions regarding this application may be directed to J. Kyle Stephens, Vice President of Regulatory Affairs, Boardwalk Pipeline Partners, LP, 9 Greenway Plaza, Houston, Texas, 77046; by fax 713–479–1846 or email to kyle.stephens@bwpmlp.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 12303 record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.fere.gov. Persons unable to file electronically should submit an original and seven E:\FR\FM\22FEN1.SGM 22FEN1 12304 Federal Register / Vol. 78, No. 36 / Friday, February 22, 2013 / Notices copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https:// www.ferc.gov.using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 8, 2013. Dated: February 15, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–04081 Filed 2–21–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13739–002] sroberts on DSK5SPTVN1PROD with NOTICES Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major Original License. b. Project No.: 13739–002. c. Date filed: September 17, 2012. d. Applicant: Lock+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f. Location: At the existing U.S. Army Corps of Engineers’ Braddock Locks and Dam on the Monongahela River, in Allegheny County, Pennsylvania. The project would occupy about 0.19 acre of federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)—825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+TM Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL 60559; (877) 556–6566 ext. 711; email—mark@hgenergy.com. i. FERC Contact: John Mudre at (202) 502–8902; or email at john.mudre@ferc.gov. j. Deadline for filing comments, recommendations, terms and VerDate Mar<15>2010 16:18 Feb 21, 2013 Jkt 229001 conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The proposed project would utilize the existing U.S. Army Corps of Engineers’ Braddock Locks and Dam and the Braddock Pool, and would consist of the following new facilities: (1) A new powerhouse with five turbine-generators having a total installed capacity of 3,750 kilowatts; (2) a new approximately 2,585-foot-long, 23-kilovolt electric distribution line; (3) a switchyard and control room; and (4) appurtenant facilities. The average annual generation is estimated to be 25,020 megawatt-hours. The proposed project would deploy hydropower turbines within a patented ‘‘Large Frame Module’’ (LFM) that would be deployed on the south (river left) side of the dam, opposite the location of the existing navigational locks and at the upstream face of the existing left closure weir. The proposed modular, low environmental impact powerhouse would be approximately 60.4 feet long, 16.6 feet wide, and 40 feet high, and constructed of structural- PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 grade steel. The powerhouse will bear on a concrete foundation on rock that is anchored to the existing left closure weir. A trash rack with 6-inch openings would be placed at the powerhouse intake to increase safety and protect the turbines from large debris. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of E:\FR\FM\22FEN1.SGM 22FEN1

Agencies

[Federal Register Volume 78, Number 36 (Friday, February 22, 2013)]
[Notices]
[Pages 12303-12304]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-04081]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-64-000]


Gulf Crossing Pipeline Company LLC; Notice of Application

    On February 1, 2013, Gulf Crossing Pipeline Company (Gulf Crossing) 
filed with the Federal Energy Regulatory Commission (Commission) an 
application under section 7 of the Natural Gas Act and Commission 
regulations for authorization to construct and operate a new 16.5 mile, 
16-inch diameter pipeline lateral and appurtenant auxiliary facilities. 
The pipeline would extend from Gulf Crossing's Sherman Compressor 
Station, near Sherman, Texas to Panda Sherman Power, LLC's new 758 
megawatt gas-fired power plant in Grayson County, Texas, as more fully 
described in the Application.
    Questions regarding this application may be directed to J. Kyle 
Stephens, Vice President of Regulatory Affairs, Boardwalk Pipeline 
Partners, LP, 9 Greenway Plaza, Houston, Texas, 77046; by fax 713-479-
1846 or email to kyle.stephens@bwpmlp.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.fere.gov. Persons unable to file electronically should submit an 
original and seven

[[Page 12304]]

copies of the protest or intervention to the Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. This filing is 
accessible on-line at https://www.ferc.gov.using the ``eLibrary'' link 
and is available for review in the Commission's Public Reference Room 
in Washington, DC. There is an ``eSubscription'' link on the web site 
that enables subscribers to receive email notification when a document 
is added to a subscribed docket(s). For assistance with any FERC Online 
service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-
3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on March 8, 2013.

     Dated: February 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-04081 Filed 2-21-13; 8:45 am]
BILLING CODE 6717-01-P