Juneau Hydropower, Inc.; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 12050 [2013-03953]
Download as PDF
12050
Federal Register / Vol. 78, No. 35 / Thursday, February 21, 2013 / Notices
Dated: February 14, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–03957 Filed 2–20–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13563–002]
erowe on DSK2VPTVN1PROD with NOTICES
Juneau Hydropower, Inc.; Notice of
Successive Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2012, Juneau
Hydropower, Inc., filed an application
for a successive preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Sweetheart Lake
Project located on Lower Sweetheart
Lake and Sweetheart Creek in Juneau,
Alaska. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following facilities: (1) A new 275foot-long, 105-foot-high concrete and
rock face dam, including project intake
facilities and a 125-foot-wide overflow
spillway, constructed at the natural
outlet of Lower Sweetheart Lake; (2) the
existing Lower Sweetheart Lake, raised
to a surface elevation of 628 feet above
mean sea level, with a surface area of
1,701.5 acres and an active storage
capacity of 94,069 acre-feet at the
normal maximum water elevation; (3) a
new 500-foot-long, 10-foot-diameter
stream diversion tunnel that would be
converted to reservoir outlet works after
project construction; (4) a new 9,595foot-long, 12-foot-diameter penstock
diverting flow from the project intake to
the powerhouse; (5) a new powerhouse
containing three new 6.6-megawatt
(MW), Francis generating units having a
total installed capacity of 19.8 MW; (6)
a tailrace consisting of a new 76-footwide to 22-foot-wide, 75-foot-long open
afterbay; a new 225-foot-long, 12-footdiameter tunnel extending from the
afterbay to an outlet structure on a
tributary to Sweetheart Creek; and an
existing tributary stream channel,
modified to a 100-foot-long, 35-footwide channel that will flow into
VerDate Mar<15>2010
14:47 Feb 20, 2013
Jkt 229001
Sweetheart Creek; (7) new marine access
facilities, including a dual-height
marine ramp, floating docks for
seaplane and boat access, and a staging
area adjacent to the docks; (8) a new
switchyard adjacent to the powerhouse;
(9) a new 8.69-mile-long, 138-kilovolt
transmission line, consisting of buried,
submarine, and overhead segments; (10)
a new 4,400-foot-long access road; and
(11) appurtenant facilities. The
proposed Sweetheart Lake Project
would have an average annual
generation of 111 gigawatt-hours.
Applicant Contact: Duff Mitchell,
Business Manager, Juneau Hydropower,
Inc. P.O. Box 22775, Juneau, AK 99802;
email: duff.mitchell@juneauhydro.com;
phone: (907) 789–2775.
FERC Contact: Jennifer Harper;
phone: (202) 502–6136.
The original notice, issued on January
9, 2013, was not published in the
Juneau newspaper in a timely manner.
Therefore, the deadline for filing
comments, motions to intervene,
competing applications (without notices
of intent), or notices of intent to file
competing applications has been
extended to 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13563) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Dated: February 14, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–03953 Filed 2–20–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14418–000]
S. Martinez Livestock, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 31, 2012, and revised on July
30, 2012, S. Martinez Livestock, Inc.
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Cold Creek
Valley Pumped Storage Project (project)
to be located downstream of Priest
Rapids dam on the Columbia River, in
Yakima County, Washington. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would include a
pumped storage facility and a
traditional turbine-generator facility.
The pumped storage facility would
consist of: (1) A new upper reservoir in
Cold Creek Valley; (2) a proposed intake
structure including five 1,800-foot-long,
10-foot-diameter penstocks leading to
the powerhouse located on the
Columbia River downstream of Priest
Rapids Dam; (3) a powerhouse with five
400 megawatt (MW) pump/turbine units
with an installed capacity of
approximately 2,000 MW; and (4) a 30mile-long transmission line. The
estimated annual generation of the
pumped storage facility would be
86,430 megawatt hours. The turbinegenerator facility would consist of: (1)
an intake leading to a 200-foot-long, 5foot-diamater penstock; and (2) a
powerhouse with a 5–MW Francis
turbine-generator unit. The estimated
annual generation of the turbine
generator unit would be 17,286
megawatt hours.
Applicant Contact: Mr. Daniel T.
Martinez, S. Martinez Livestock, Inc.,
13395 Hwy. 24, Moxee, WA 98936;
phone: (541) 298–3300.
E:\FR\FM\21FEN1.SGM
21FEN1
Agencies
[Federal Register Volume 78, Number 35 (Thursday, February 21, 2013)]
[Notices]
[Page 12050]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03953]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13563-002]
Juneau Hydropower, Inc.; Notice of Successive Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2012, Juneau Hydropower, Inc., filed an application
for a successive preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Sweetheart Lake Project located on Lower Sweetheart Lake and Sweetheart
Creek in Juneau, Alaska. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following facilities: (1)
A new 275-foot-long, 105-foot-high concrete and rock face dam,
including project intake facilities and a 125-foot-wide overflow
spillway, constructed at the natural outlet of Lower Sweetheart Lake;
(2) the existing Lower Sweetheart Lake, raised to a surface elevation
of 628 feet above mean sea level, with a surface area of 1,701.5 acres
and an active storage capacity of 94,069 acre-feet at the normal
maximum water elevation; (3) a new 500-foot-long, 10-foot-diameter
stream diversion tunnel that would be converted to reservoir outlet
works after project construction; (4) a new 9,595-foot-long, 12-foot-
diameter penstock diverting flow from the project intake to the
powerhouse; (5) a new powerhouse containing three new 6.6-megawatt
(MW), Francis generating units having a total installed capacity of
19.8 MW; (6) a tailrace consisting of a new 76-foot-wide to 22-foot-
wide, 75-foot-long open afterbay; a new 225-foot-long, 12-foot-diameter
tunnel extending from the afterbay to an outlet structure on a
tributary to Sweetheart Creek; and an existing tributary stream
channel, modified to a 100-foot-long, 35-foot-wide channel that will
flow into Sweetheart Creek; (7) new marine access facilities, including
a dual-height marine ramp, floating docks for seaplane and boat access,
and a staging area adjacent to the docks; (8) a new switchyard adjacent
to the powerhouse; (9) a new 8.69-mile-long, 138-kilovolt transmission
line, consisting of buried, submarine, and overhead segments; (10) a
new 4,400-foot-long access road; and (11) appurtenant facilities. The
proposed Sweetheart Lake Project would have an average annual
generation of 111 gigawatt-hours.
Applicant Contact: Duff Mitchell, Business Manager, Juneau
Hydropower, Inc. P.O. Box 22775, Juneau, AK 99802; email:
duff.mitchell@juneauhydro.com; phone: (907) 789-2775.
FERC Contact: Jennifer Harper; phone: (202) 502-6136.
The original notice, issued on January 9, 2013, was not published
in the Juneau newspaper in a timely manner. Therefore, the deadline for
filing comments, motions to intervene, competing applications (without
notices of intent), or notices of intent to file competing applications
has been extended to 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13563) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 14, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-03953 Filed 2-20-13; 8:45 am]
BILLING CODE 6717-01-P