Drawbridge Operation Regulation; James River, Between Isle of Wight and Newport News, VA, 11094 [2013-03546]
Download as PDF
11094
Federal Register / Vol. 78, No. 32 / Friday, February 15, 2013 / Rules and Regulations
Rate set
For plans with a valuation
date
On or after
*
Before
*
233
3–1–13
*
4–1–13
1.00
Issued in Washington, DC, on this 7th day
of February 2013.
Laricke Blanchard,
Deputy Director for Policy, Pension Benefit
Guaranty Corporation.
[FR Doc. 2013–03544 Filed 2–14–13; 8:45 am]
BILLING CODE 7709–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0066]
Drawbridge Operation Regulation;
James River, Between Isle of Wight
and Newport News, VA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the draw of the
James River Draw Bridge across the
James River, mile 5.0, between Isle of
Wight and Newport News, VA. This
deviation is necessary to facilitate
generator replacement on the James
River Draw Bridge. This temporary
deviation will allow the drawbridge to
remain in the closed-to-navigation
position on specific dates and times.
DATES: This deviation is effective from
12:01 a.m. on February 16, 2013, until
5 a.m. on February 18, 2013; from 12:01
a.m. on February 23, 2013, until 5 a.m.
on February 25, 2013; and from 12:01
a.m. on March 2, 2013, until 5 a.m. on
March 4, 2013.
ADDRESSES: The docket for this notice,
USCG–2013–0066, is available online at
www.regulations.gov by typing in the
docket number in the ‘‘SEARCH’’ box
and clicking ‘‘SEARCH.’’ Next, click on
the Open Docket Folder on the line
associated with this notice. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:00 Feb 14, 2013
Immediate
annuity rate
(percent)
Jkt 229001
Deferred annuities
(percent)
i1
i2
*
4.00
i3
4.00
*
If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email
James.L.Rousseau2@uscg.mil. If you
have questions on reviewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Virginia Department of Transportation,
who owns and operates this vertical lift
bridge, has requested a temporary
deviation from the current operating
regulations set out in 33 CFR 117.5, to
facilitate generator replacement on the
structure.
Under the regular operating schedule,
the James River Bridge, mile 5.0,
between Isle of Isle and Newport News,
VA opens on signal. The James River
Bridge has vertical clearances in the
open and closed position of 145 feet and
60 feet, above mean high water,
respectively.
Under this temporary deviation, the
drawbridge will be closed on weekends
to navigation from 12:01 a.m. on
February 16, 2013, until 5 a.m. on
February 18, 2013; from 12:01 a.m. on
February 23, 2013, until 5 a.m. on
February 25, 2013; and from 12:01 a.m.
on March 2, 2013 until 5 a.m. on March
4, 2013. If weather conditions are
favorable during the first two weekends
of the deviation, mariners will be
notified via a broadcast notice to
mariners and local media that the bridge
will return to its regular operating
schedule and that the third week of
closure is no longer necessary.
Only emergency openings will be
provided with up to a two-hour delay in
opening. There are no alternate routes
for vessels transiting this section of the
James River.
The James River is used by a variety
of vessels including freighters, tugs, and
recreational vessels. The Coast Guard
has carefully coordinated the
restrictions with commercial and
recreational waterway users. The Coast
Guard will inform all users of the
waterway through our Local and
Broadcast Notice to Mariners of the
closure periods for the bridge so that
vessels can arrange their transits to
minimize any impacts caused by the
temporary deviation. Mariners able to
FOR FURTHER INFORMATION CONTACT:
PO 00000
Frm 00006
Fmt 4700
Sfmt 4700
n1
*
4.00
n2
*
7
8
pass under the bridge in the closed
position may do so at any time.
Mariners are advised to proceed with
caution.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 5, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2013–03546 Filed 2–14–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket Number USCG–2013–0036]
RIN 1625–AA00
Safety Zone; Lake Worth Dredge
Operations, Lake Worth Inlet; West
Palm Beach, FL
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a temporary safety zone on
Lake Worth Inlet, West Palm Beach,
Florida, to provide for the safety of life
and vessels during dredge operations. A
safety zone will need to be enforced for
90 minutes on two separate occasions
during a two week period. The time of
enforcement will be publicized as soon
as practical. During the time of
enforcement, persons and vessels are
prohibited from entering, transiting
through, anchoring in, or remaining
within the safety zone unless authorized
by the Captain of the Port Miami or a
designated representative.
DATES: This rule is effective from
February 15, 2013, through February 20,
2013, but has been enforced with actual
notice since February 4, 2013. This rule
will be enforced for two 90 minute
periods which will occur during the
period of February 4, 2013, through
February 20, 2013. The public will be
SUMMARY:
E:\FR\FM\15FER1.SGM
15FER1
Agencies
[Federal Register Volume 78, Number 32 (Friday, February 15, 2013)]
[Rules and Regulations]
[Page 11094]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03546]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0066]
Drawbridge Operation Regulation; James River, Between Isle of
Wight and Newport News, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the draw of the James River Draw Bridge
across the James River, mile 5.0, between Isle of Wight and Newport
News, VA. This deviation is necessary to facilitate generator
replacement on the James River Draw Bridge. This temporary deviation
will allow the drawbridge to remain in the closed-to-navigation
position on specific dates and times.
DATES: This deviation is effective from 12:01 a.m. on February 16,
2013, until 5 a.m. on February 18, 2013; from 12:01 a.m. on February
23, 2013, until 5 a.m. on February 25, 2013; and from 12:01 a.m. on
March 2, 2013, until 5 a.m. on March 4, 2013.
ADDRESSES: The docket for this notice, USCG-2013-0066, is available
online at www.regulations.gov by typing in the docket number in the
``SEARCH'' box and clicking ``SEARCH.'' Next, click on the Open Docket
Folder on the line associated with this notice. You may also visit the
Docket Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, Bridge
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6557, email James.L.Rousseau2@uscg.mil. If you have questions on
reviewing the docket, call Barbara Hairston, Program Manager, Docket
Operations, 202-366-9826.
SUPPLEMENTARY INFORMATION: The Virginia Department of Transportation,
who owns and operates this vertical lift bridge, has requested a
temporary deviation from the current operating regulations set out in
33 CFR 117.5, to facilitate generator replacement on the structure.
Under the regular operating schedule, the James River Bridge, mile
5.0, between Isle of Isle and Newport News, VA opens on signal. The
James River Bridge has vertical clearances in the open and closed
position of 145 feet and 60 feet, above mean high water, respectively.
Under this temporary deviation, the drawbridge will be closed on
weekends to navigation from 12:01 a.m. on February 16, 2013, until 5
a.m. on February 18, 2013; from 12:01 a.m. on February 23, 2013, until
5 a.m. on February 25, 2013; and from 12:01 a.m. on March 2, 2013 until
5 a.m. on March 4, 2013. If weather conditions are favorable during the
first two weekends of the deviation, mariners will be notified via a
broadcast notice to mariners and local media that the bridge will
return to its regular operating schedule and that the third week of
closure is no longer necessary.
Only emergency openings will be provided with up to a two-hour
delay in opening. There are no alternate routes for vessels transiting
this section of the James River.
The James River is used by a variety of vessels including
freighters, tugs, and recreational vessels. The Coast Guard has
carefully coordinated the restrictions with commercial and recreational
waterway users. The Coast Guard will inform all users of the waterway
through our Local and Broadcast Notice to Mariners of the closure
periods for the bridge so that vessels can arrange their transits to
minimize any impacts caused by the temporary deviation. Mariners able
to pass under the bridge in the closed position may do so at any time.
Mariners are advised to proceed with caution.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: February 5, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2013-03546 Filed 2-14-13; 8:45 am]
BILLING CODE 9110-04-P